Loading...
HomeMy WebLinkAboutDrawingFoi Rating/ _ use wtfh.,`� _, i This manuanal provldes instructions for safe installation of the InterLockKit onto a S�uarN pe➢. The back plate sits seeurely on the face of the panel cover while allowing the front plate to slide be the main and generator breaker positions. The InterLoekKit will only allow one of these breakers to be in the "ON"position meeting the requirements of Article 902 of the National Electric Code ANSIMPA 70. The installation of the breaker retaining strap meets Article 400.36 (NEC 2003). 1 ✓G? i jai 1; k3 2.' l lty iTr F.,�� _ !C C1ifjh� c'i Gh==Ll3uilfijj This kit must be installed and serviced only by qualified electrical personnel Turn off all power supplying the equipminstalled ent where this kit will be illed before working on or inside the equipment Always use a properly rated off voltage sensing device to confirm that all power is Replace all devices, doors, and covers after installing this kit before tu Power to the equipment rning on Always wear safety eyewear while drilling or working around electrical equipment RIUY1fat 1' .'i.�zj ir,:.9l,l,ttl+i� Thy±,�i�711d TRUr�TIBULIT INSM"J,l,`)LT.1,s F`iF t_i T! iqua jiVuT13 uJCT�; �pvTS 1) Disconnect power to the panel 2) Separate plates. Remove backing from double stick tape. Align back plate (P- 5011) with the top of the first and second breaker slot (1,2 slot) on time) front of panel cover and under opening for main breaker, See 1Cngure I(Do not drill holes at this 3) Remove panel cover 4) Relocate breakers from slots 2 and 4 (top 2 spaces of the right breaker column) utilizing piggyback breakers as necessary to create the needed spaces 5) Install generator breaker in the 2,4 slot. 6) Temporarily remove breakers from the 5,6 slots, Loop the breaker retaininstrap g (S-1004) around breakers 1,2,3,4 % > from the front face of the breakers. Align the head of the retaining strap at the top right of the number 2 breaker and tighten the strap, See &agora Wo Cut the tail of the retaining strap approximately 2 inches long and install Notice Label (S-1005) around tail. Reinstall the breakers in the 5,6 slots, Verify that the retaining strap keeps the 2,4 breaker -in -place by attem tin t _ p '_ g_ o remove the breaker. � 2y . � .\ « ��. . _�\�� �? •</ .:,� � � � \ \ �� \1 4� � d\ ~ ^° . , \\ / ..f .. » 9/ . g « . 6»» 2 .. .� � . . : � 2 «4 d ? « FFI ����/�� TO SWITCH OPERATION FROM MAIN TO GENERATOR 1) Turn main breaker to the "OFF" Position 2) Turn all branch circuits to the "OFF" position 3) SlidelnterLookplateup 4) Connect and start generator 5) 1 generator breaker to the "ON" position 6) Turn on essential circuits one at a time WAA81�t7 NGI Allow appliances to start before engaging next circuit TO .RETURN TO MAIN POWER REVERSE PROCEDURE Electrical equipment should be installed, operated, serviced, and maintained by qualified personnel. No responsibilityis assumed by Generator InterLock Technologies, LLC for any consequences arising out of the misuse of this material.