HomeMy WebLinkAboutProject InformationDEL --AIR Manual S Compliance Report
Rrama-MD0lmrtl0lIIttc Entire House
DEL -AIR HEATING & AIR CONDITIONING
531 CODISCO WAY, SANFORD. FL 32771 Phone: 407-333-2665 Fax: 407-333-3853 Web: WWW.DEL-AIR.COM
Job: Lot 7 Block 5 Waterston...
Date:
By: FLETCH
For: ADAMS HOMES
5325 San Bendetto Place, Fort Pierce, FL 34951 JUN 18 1
ISr Lucie County, Permltting
Cooling Equipment
Design Conditions
Outdoor design DB:
90.40F
Sensible gain:
22713
Btuh
Entering coil DB: 76.9°F
Outdoor design WB:
77.4°F
Latent gain:
3648
Btuh
Entering coil WB: 63.4°F
Indoor design DB:
75.0°F
Total gain:
26361
Btuh
Indoor RH:
50%
Estimated airflow:
947
cfm
Manufacturer's Performance Data at Actual Design Conditions
Equipment type:
Split ASHP
Manufacturer:
Carrier
Actual airflow:
947 cfm
Sensible capacity:
23004 Btuh
Latent capacity:
4448 Btuh
Total capacity:
27452 Btuh
Design Conditions
Outdoor design DB: 41.0°F
Indoor design DB: 70.0°F
Model: 25H BC530A00300+FX4D N F031 L
101% of load
122% of load
1040/6 of load SHIP: 840%
Heat loss: 23665 Btuh
Manufacturer's Performance Data at Actual Design Conditions
Equipment type: Split ASHP
Manufacturer: Carrier
Model: 25HBC530A00300+FX4DNF031L
Actual airflow: 947
cfm
Output capacity: 26672
Btuh
113% of load
Supplemental heat required:
0 Bluff
Backup equipment type:
Elec strip
Manufacturer:
Model:
Actual airflow: 947
cfm
Output capacity: 5.9
kW
85% of load Temp. rise: 19 OF
Meets all requirements of ACCA Manual S.
Entering coil DB: 69.2°F
Capacity balance: 36 OF
Economic balance: -99 OF
ravf- cool
1 wrightsoft- 2020-May-2611:05:48
•......, ,....�....., Right -Suite® Universal 2019 19.0.12 RSU23828 Page 1
...Waterstone1512AGL\Lot5Blk5Waterstone1512AGLrup Calc-MJ8 House faces: NW
Component Constructions Job: Lot 7 Block 5 Waterston...
iRDEL--AIR Date:
tf aM-AM C011BtnBIm1B Entire House By: FLErCH
DEL -AIR HEATING & AIR CONDITIONING
531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665 Fax 407-333-3853 Web: WWW.DEL-AIR.COM
Project• •
For: ADAMS HOMES
5325 San Bendetto Place, Fort Pierce, FL 34951
Design
Conditions
Location:
Indoor:
Heating
Cooling
St Lucie Cc Intl, FL, US
Indoor temperature (OF)
70
75
Elevation: 26 it
Design TD (OF)
29
15
Latitude: 28ON
Relative humidity (%)
30
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
2.4
56.9
Dry bulb (OF) 41
90
Infiltration:
Daily range (OF) -
15 (L
) Method
Simplified
Wet bulb (OF) -
77
Construction quality
Average
Wind speed (mph) 15.0
7.5
Fireplaces
0
Construction descriptions
Or
Area
U-value
Insul R
Htg HTM
Loss CIg HTM
Gain
h2
BWhfit2--°F
N.-FBbh
BIuhM2
BWh
BtuhM
BNh
Walls
Bilk wall, stucco ext, r-4 ext bd ins, 8" thk, 1/2" gypsum board int fnsh
n
8
0.201
4.1
5.83
46
4.06
32
ne
323
0.201
4.1
5.83
1884
4.06
1313
se
267
0.201
4.1
5.83
1555
4.06
1083
sw
434
0.201
4.1
5.83
2529
4.06
1762
w
8
0.201
4.1
5.83
46
4.06
32
nw
112
0.201
4.1
5.83
650
4.06
453
all
1151
0.201
4.1
5.83
6711
4.06
4675
Partitions
12C-Osw: Frm wall, 1/2" gyp.bd ext, r-13 cav ins, 1/2" gypsum board
278
0.091
13.0
2.64
734
1.31
364
int fnsh, 2"x4" wood frm, 16" c.c. stud
Windows
2A-2ov: 2 glazing, clr low-e outs, air gas, vnl frm mat, clr innr, 1/4" gap,
n
10
0.330
0
9.57
96
8.22
82
1/8" thk; NFRC rated (SHGC=0.21); 50% drapes, medium; 1.3 ft
W
10
0.330
0
9.57
96
21.4
214
overhang (5 ft window ht, 1 ft sep.); 6.67 It head ht
nw
15
0.330
0
9.57
144
16.6
249
all
35
0.330
0
9.57
335
15.6
545
10C-v: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap,
ne
18
0.550
0
16.0
285
39.5
706
118" thk; NFRC rated (SHGC=0.70); 13 ft overhang (6.7 it window ht,
1.3 ft sep.); 6.67 ft head ht
2A-2ov: 2 glazing, clr outr, air gas, vnl frm mat, clr low-e innr, 1/4" gap,
ne
7
0.330
0
9.57
66
17.7
121
1/8" thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 1.3 it
overhang (3.17 ft window ht, 0.83 ft sep.); 6.67 It head ht
2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap,
se
30
0.330
0
9.57
287
8.52
256
118" thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 8.33 It
overhang (5 ft window ht, 0.83 ft sep.); 6.67 it head ht
2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap,
se
23
0.330
0
9.57
222
15.7
364
1/8" thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 1.3 ft
overhang (5.25 ft window ht, 0.83 ft sep.); 6.67 It head ht
WriVght5aft-
2020-May-26 11:05:48
r ..".., ..�.w.�w..-., Right -Suite® Universal 2019 19.0.12 RSU23828
Page 1
7R.1.A...Waterslonel512AGL\Lo15Blk5Waterstone1512AGLrup Cale =MJ8 House
faces: NW
2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap,
se 33 0.330
1/8" thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 1.3 It
overhang (5.3 If window ht, 0.83 If sep.); 6.67 ft head ht
2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap,
sw 10 0.330
1/8" thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 1.3 ft
overhang (3.17 ft window ht, 1 ft sep.); 6.67 It head ht
2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap,
sw 16 0.330
1/8" thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 1.3 ft
overhang (5.3 It window ht, 1 It sep.); 6.67 ft head ht
2B-2fv: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap,
nw 3 0.330
1/8" thk; NFRC rated (SHGC=0.31); 50% drapes, medium; 7.33 ft
overhang (1 It window ht, 0.75 It sep.); 5.67 ft head ht
Doors
11JO: Door, mtl fbrgl type
nw 20 0.600
11 DO: Door, wd so type
n 18 0.390
Ceilings
16B-30ad:Attic ceiling, asphalt shingles roof mat, r-30 cell ins, 1/2"
1580 0.032
gypsum board int fnsh
Floors
22A-tpl: Bg floor, light dry soil, on grade depth
159 0.989
0 9.57
313
15.7
514
0 9.57
93
14.7
143
0 9.57
156
16.0
262
0 9.57
29
22.1
66
6.3
17.4
350
17.6
353
0
11.3
202
11.4
204
30.0
0.93
1467
1.69
2670
0
28.7
4558
0
0
C .�Ilttght aft- 2020-May-2611:05.48
r ••.�i ...,......._r., Right -Suite® Universal 2019 19.0.12 RSU23828 page 2
�.•(....Watersione1512AGL\Lot5BIk5Waterstone1512AGL.rup Cale -MJ8 House faces: NW
DEL. AIR
Project Summary Lot 7 Block 5 Waterston
Date: ...
xumas•alncoaama11a1B Entire House By: FLETCH1
DEL -AIR HEATING & AIR CONDITIONING
531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665 Fax 407-333-3853 Web: WWW.DEL-AIR.COM
For: ADAMS HOMES
5325 San Bendetto Place, Fort Pierce, FL 34951
Notes: RVSD 8-17-15 JA
L. S. 5-26-20 VWK
Design• •
Weather: St Lucie Cc Intl, FL, US
Winter Design Conditions Summer Design Conditions
Outside db 41 OF Outside db 90 OF
Inside db 70 OF Inside db 75 OF
Design TD 29 OF Design TD 15 OF
Daily range L
Relative humidity 50 %
Moisture difference 57 gr/lb
Heating Summary
Structure 18547 Btuh
Ducts 5119 Btuh
Central vent (0 cfm) 0 Btuh
(none)
Humidification 0 Bluff
Piping 0 Btuh
Equipment load 23665 Btuh
Infiltration
Method
Construction quality
Fireplaces
Simplified
Average
0
Heating Cooling
Area (ft2 15N
151g
Volume �fta) 13571
13571
Air changes/hour 0.38
0.20
Equiv. AVF (cfm) 86
45
Heating Equipment Summary
Make Carrier
Trade CARRIER
Model 25HBC53OA00300
AHRI ref 9154945
Efficiency
Heating input
Heating output
Temperature rise
Actual air flow
Air flow factor
Static pressure
Space thermostat
Capacity balance point = 36 OF
Backup:
[M:6997
28200
Btuh @ 470F
27
OF
947
cfm
0.040
cfm/Btuh
0.40
in H2O
Input = 6 kW, Output = 20230 Btuh, 100 AFUE
Sensible Cooling Equipment Load Sizing
Structure
16530
Btuh
Ducts
6182
Btuh
Central vent (0 cfm)
0
Btuh
(none)
Blower
0
Btuh
Use manufacturer's data
y
Rate/swing multiplier
1.00
Equipment sensible load
22713
Btuh
Latent Cooling Equipment Load Sizing
Structure
2548
Btuh
Ducts
1100
Btuh
Central vent (0 cfm)
0
Btuh
(none)
Equipment latent load
3648
Btuh
Equipment Total Load (Sen+Lat)
26361
Btuh
Req. total capacity at 0.75 SHR
2.5
ton
Cooling Equipment Summary
Make Carrier
Trade CARRIER
Cond 25HBC530A00300
Coil FX4DNF031L
AHRI ref 9154945
Efficiency 12.5 EER,
15 SEER
Sensible cooling
21300
Btuh
Latent cooling
7100
Btuh
Total cooling
28400
Btuh
Actual air flow
947
cfm
Air flow factor
0.042
cfm/Btuh
Static pressure
0.40
in H2O
Load sensible heat ratio
0.86
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
.� -rk- wrighisoTt- 2020-May-2611:05:48
-•- Right -Suite® Universal 2019 19.0.12 RSU23828 page 1
'C'p...Waterstone1512AGL1Lot5Blk5Watersionel512AGL.rup Cato. MJ8 House faces: NW
' DEL -AIR Right-M Worksheet
°°" Entire House
DEL -AIR HEATING &AIR
CONDITIONING
531 CODISCO WAY, SANFORD, FL32771 Phone: 407-333-2665 Fax: 407-333-3853 Web: WWW.DEL-AIR.COM
Job: Lot 7 Block 5 Waterstone 15...
Date:
By: FLETCH
1
Room name
Entire House
WIC
2
Exposed wall
158.9 if
0 it
3
Roam height
9.0 ft
8.3 ft heat/cool
4
5
Roam dimensions
Room area
1516.0 IF
1.0 x 41.8 ft
41.8 fix
Ty
Construction
U-value
Or
HTM
Area (W)
Load
Area (fv)
Load
number
(Btuh/1ti°F)
(BtufVfi°)
or perimeter (it)
(Btuh)
or perimeter (it)
(Btuh)
Heat
I Coal
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Coal
6
y/'-"
aII wall, stucco axt
6.201
n
"-583
^ 4A8
18'
` 46
"-`"' 32
- 0
- 0
"- 0
- -0
I-C
2A 20v�__...-.._„
_.„_ 0,330
e-.n_
...._,...95Z
_.__...8.22
__„„,,,_. 10
-_.,-__--_0
„;„__w_96
_.,_.,.:.-.82
_a_M_:__0
--0
_-_-___0
Blk wall, stucco ext
0.201
ne
5.83
4.06
348
323
1884
1313
0
0
0
0
10C-v
0.550
ne
15.95
39.50
18
0
285
706
0
0
0
0
11
2A-2ov
Blk wall stucco ext
0.330
0.'201
ne
se`
9.57
-5.83
17.70
4:06
7
3a3
0
267
66
: 1558
121
-1083
0
0
0
�'" 0
0
0
0
0
-"-
2A 20v
0.330
as
9.57
8.52
30
30
287
256
0
0
0
0
0.330
se
957
15.70
23
6
-. 222
364
0
0
0
0
--��-�--"
,2A2ov
2A2ov_.;,„„„,„�%._
,__-_0.330
_se
..__„",957
_ -15.73
.,-_...33
...._„..___8
_..,,._313
„,u_,_,514
,_,_-_0
,.___,__0
_.._..._ 0
_ __,._ 0
W
BIk wall, stucco ext
0.201
sw
5.83
4.06
460
434
2529
1762
0
0
0
0
2A-2ov
0.330
sw
9.57
14.67
10
3
93
143
0
0
0
0
2A-2ov
Blk waf sfuccoext
0.330
0201
sw
w
9.57
--583
16.02
_ -4.06,
06
16
18
_ 3
8
156
-46
_ _ 262
32
0
0'
_ 0
0
_ 0
0
0
-0
LG
2A 2ov_,_„:.„.--,_.,,,-
-----0.330
_w.
_--..9.57
_2T.41
_......-..10
__„__x_ 0
�..a.-,„96
_.-_.�214._.._-.__0'
._ ..0..___.-0
W
BIk wall, stucco ext
0.201
nw
5.83
4.06
150
112
650
453
3
3
17
12
2A-2ov
0.330
nw
9.57
16.61
15
0
144
249
0
0
0
0
IIL-�G;
2B-2Iv
0.330
nw
9.57
22.09
3
0
29
66
0
0
0
0
D
p
trip
12C-Osw -'.
0.600
0.091
nw
1740
264
17.58
m 131
20
296
20
-. 278
350
`734
353
364
0
64
0
" 64
0
169
0
84
0.390
.„ n_
-11.31
_ _11,43
- - __„18
--:-202
_„�,204
e,..m__-_0
_.,_„,. ,.-0
.-,,,_ .0
_ .. _.0
C
1613-30ad
0.032
-
0.93
1.69
1580
1580
1467
2670
43
43
40
73
.'22A.1PI
.-,0089
=..._..2868
.___. (.00
., „1816
-e.,__„ 759
,.r.:_r.4558
-=�0,,.,«_�.42
=.__.0
., „,_ 0.
6
c) AED excursion
0
-8
Envelope loss/gain
15807
11245
225
160
12
a) Infiltration
2739
766
6
2
b) Room ventilation
0
0
0
0
13
Internal gains: Occupants @ 230
4
920
0
0
Appliances/other
3600
0
Subtotal (lines 6to 13)
18547
16530
231
162
Lessexternal load
0
0
0
0
Less transfer
0
0
0
0
Redistribution
0
0
0
0
14
Subtotal
11547
11130
231
162
15
Duct loads
28%
6182
28%
37%
64
61
Total room load
75119
23665
22713
295
223
Air required (cfm)
947
947
12
9
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
-*- wrlghls.M- 2020-May-2611:05:48
�rA Right -Suite® Universal 2019 19.0.12 RSU23828 Page 1
...Waterstonel512AGL\Lot58lk5Waterstonel512AGL.rup Cato =MJ8 House faces: NW
'! DEL -AIR Right-M Worksheet
"°"°'°"�"° Entire House
DEL -AIR HEATING & AIR
COhNDITIONING
531 CODISCO WAY, SANFORD, FL 32771 P one: 407333-2665 Fax: 407333-3853 Web: WWW.DEL-AIR.COM
Job: Lot 7 Block 5 Waterstone 15...
Date:
By: FLETCH
1
Room name
MBATH
WC
2
Exposed wall
12.0 ft
4.0 It
3
Room height
8.7 It heat/cool
9.0 ft heat/cool
4
Room dimensions
1.0 x 136.0 It
1.0 x 20.3 If
5
Room area
136.0 IF
20.3 ftr
Ty
Construction
U-value
Or
HTM
Area (W)
Load
Area (ft')
Load
number
(Btuh/fh°F)
(BtuWft�
or perimeter (it)
(Btuh)
or perimeter (ft)
(Btuh)
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
6
4�
stucco ex_
�2A
0
_..-0
_......._ 0;Y1
I ^-
20v
..._�.0 33330
.=n_
--'9.57
v,.9 22
1 ..,..__0
._ 0,.W._,.'0
_.,,,.r..._
V
Blk wall, stucco ext
0.201
no
5.83
4.06
96
89
520
362
32
32
187
130
I-C
10C-v
0.550
ne
15.95
39.50
0
0
0
0
0
0
0
0
11
L-C
PA-2ov
0.330
ne
9.57
17.70
7
0
66
121
.0
0
0
0
y!-"'
Blk wall stucco ext
0,201
se
_-S 83
4A6
0
2A2ov
0.330
se
957
8.52
0
0
0
`D
0
0
0
0
2A2ov
'0.330
se
.957
15.70
0,
0
0
0
0.
0
0
0
Lam(-GG
2A.20v_..,._. _,.,.,.,,.,._,.
_.-_0.330
_as.
-.,-9.57
,.._15:73
,_,...,..,._ 0
_r.._......0
_..._.,..,._0
_.._.___.0
...,__..._0
.......,_._0
_„_.._..„0
__ 0.
WG
Blk wall, stucco ext
0.201
sw
5.83
4.06
0
0
0
0
0
0
0
0
2A-2ov
0.330
sw
9.57
14.67
0
0
0
0
0
0
0
0
`G
2A 2ov
0,330
sw
9.57
16.02
0
0
0
0
0
0
0
0
VV��
Blk wall stucco ext
' 0 201
w'
-: 5 83
' 4-o6
0
.___ 0
"-" 0
0
0
. 0
"" 0
- -o
_._...0.330
..w_
_-9.57_..21:41.
_.,,._....e0
.�._r._.0
._....a...-.10
____0
._ ___0:,.,__....
,.0
__.._0
:__,...J,..,0
Slit wall, stucco ext
0.201
nw
5.83
4.06
6
6
32
22
0
0
0
0
2A-2ov
0.330
nw
9.57
16.61
0
0
0
0
0
0
0
0
2B-2fv
0.330
nw
9.57
22.09
0
0
0
0
0
0
0
0
D
11J0
0.600
nw
1740
17,58
0
0
0
0
0
0
0
0
p
-12C Osw ..
0 091
2 64
` sf3
44
_
44
- 116
_
4.58
0
. 0
R
.... _11c93
�.._._0
:,.._ _0
_._.�..s 0
__s0
_" -.._.. 0
-,a.,„.., _0
_...-„...__o
__.„'_.- _moo
C
16B-30ad
0.032
0.93
1.69
147
147
136
248
22
22
21
38
1PI..._..,_,..-..._.,._..
_ ...�0989
,_;:_
�2868
�0:00
„._.8.. 136
.m.M_ .
',�..,_„„12
_...�,.�344
__:.O
�.T 20
-
=_4
-_.-_...
,_,,,,_:, 115
_,,.,,:':;.:0
%_
.:.........m....
®....m......::s...._w.._...Y..__
�J+.L .
.J_.v-.:.....��v....
�Y�.+.:w
....__.._.........�._
`.__+...re
�a...J...:.e
......:._.:..e...
..........revs
:.1�_....ww,
n .�.i.w".._m
6
c) AED excursion
-40
-8
Envelope loss/gain
1214
772
322
159
12
a) Infiltration
207
58
65
18
b) Roam ventilation
0
0
0
0
13
Informal gains: Occupants @ 230
0
0
0
0
Appliances/other
0
0
Subtotal (lines 6 to 13)
1421
830
387
178
Less external load
0
0
0
0
Less transfer
0
0
0
0
Redistribution
0
0
0
0
14
Subtotal
1421
830
387
178
15
Duct loads
28%
371/6
392
310
28%
37%
107
66
Total room load
1813
1140
494
244
Air required (cm)
73
48
20
10
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
- wrlghCso_ii- 2020-May-2611:05:48
' ' Right -Suite® Universal 2019 19.0.12 RSU23B28 Page 2
...Waterstonel512AGL\Lot5Blk5Walerstonel512AGLrup Calc=MJB Housefaces: NW
r1 DEL AIR Right-JO Worksheet
ianmra'ua commoa Entire House
DEL -AIR HEATING & AIR
CONDITIONING
531 CODISCO WAY, SANFORD, FL32771 Phone: 407-333-2665 Fax: 407-3333853 Web: WWW.DEL-AIR.COM
Job: Lot 7 Block 5 Waterstone 15...
Date:
By: FLETCH
1
Room name
MBR
LAU
2
Exposed wall
35.5 it
0 it
3
Room height
8.6 it heat/cool
8.0 it heat/cool
4
Room dimensions
13.5 x 16.5 it
1.0 x 56.0 it
5
Room area
222.8 ftr
56.0 fR
Ty
Construction
U-value
Or
HTM
Area (W)
Load
Area (ft')
Load
number
(BtuhlftzOF)
(Btuh/ft2)
or perimeter (it)
(Btuh)
or perimeter (it)
(Btuh)
Heat
I Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
6
W._._'Blk
wall stucco t
r0201
n•'-583
_4:06
0
0
0
0
0""
:0
0`""----0
2A20v.�-......a«,.._..,_.._._--0.330-.ten_._...._957.___,
8,22
_-._.,..n.0:
_.�_-.0.
0__r_0
,.
„..__...0_.a,.....
____0
__0
.__..,.._.0
_-C
Elk wall, stucco ext
0.201
ne
5.83
4.06
132
132
769
536
0
0
0
0
IOC-v
0.550
no
15.95
39.50
0
0
0
0
0
0
0
0
1 1
2A-20v
0.330
ne
9.57
17.70
0
0
0
0
0
0
0
0
v"`-' 0
Blk wall, stucco ext
0:201
se-
-SA3
-74.06
116'--
84
7488
- -340
0
"« o
6
2A 2ov
0.330
se
9.57
8.52
0
0
- 0
0
0
0
0
-0
'.2A 2ov
0,330
se
9.57
15.70
0
0
0
0
0
• 0
0
0
2A 2ov,....__-_
._....._0,330
_se_
„„,.�.9,57
m...15.73
.L„-�_33
:_,,,, „8
�..,__.�313
_ _514
,.-„.._.,,._A
,„_._.„p
......,._ __0
„»_....__0
Blk wall, stucco ext
0.201
sw
5.83
4.06
44
44
256
179
0
0
0
0
2A-2ov
0.330
sw
9.57
14.67
0
0
0
0
0
0
0
0
2A-2ov
0.330
sw
9.57
16.02
0
0
0
0
0
0
0
0
Blk wall stucdo ext
'0 201
W_
-'S 83
__
4.06
0
n 0
' 0
_0
'_'_-0
=0
''6
0
2A 2ov,. _.._._':_...._
__.0.330
.-w-
..-.__9.57
_..:21.41
......_..._ 0._
___ 10
__"_'._0
___ .0
_. _.._-0
___ .0
____.._..0
_. ..m._0
Blk wall, stucco ext
0.201
nw
5.83
4.06
0
0
0
0
0
0
0
0
2A-2ov
0.330
nw
9.57
16.61
0
0
0
0
0
0
0
0
213-2fv
0.330
nw
9.57
22.09
0
0
0
0
0
0
0
0
11 0
0.600
nw
7 1 0 4
iZ58
0
0
0
0
0
0
0
0
p
--_ __....,..
12nsw
0.091
'`-.
-......
--... 1_31
.-.0
...._ _..0
�.r..,... ,0
............:..0
._......_.
._-;lb
'12
..w'. 63
,1-D
-11 D0 .._ e,.-»,.._._ _ _
.-_..._ 0.390
...nn
" _:11.31
_....e11.43
,_-„;..-.„_0
...,_...,.._.,.,.0
- .___0
_..._..:..:0
__0._,...._.:.0
_„.-.__„ 0
.._._-...,:.0
C
16B-30ad
0.032
-0.93
1.69
238
238
221
402
56
56
52
95
._:..._'.,_.:28.68
,.-; `.0:00
_,.__.._.223
_:.:.__36
_ ,_..,.1018
:.�,_0
-�..„ 56
�..,..,,._a
.:��:0
__.__._...b
6
c) AED excursion
146
-35
Envelope loss/gain
3065
2116
179
123
12
a) Infiltration
595
166
0
0
b) Room ventilation
0
0
0
0
13
Internal gains: Occupants @ 230
1
230
0
0
Appliances/other
600
6D0
Subtotal (lines 6to 13)
3660
3112
179
723
Less external load
0
0
0
0
Less transfer
0
0
0
0
Redistribution
0
0
0
0
14
Subtotal
3660
3112
179
723
15
Duct loads
28%
37%
1010
1164
28%
37%
49
270
Total room load
4670
4276
228
993
Air required (cfm)
187
178
9
41
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
wrr9hGvo6iR- 2020-May-26 11:05.48
Right -Suite® Universal 2019 19.0.12 RSU23828 Page 3
... Waterston81512AGULat5BIk5Waterstonel 512AGLrup Calc=M.18 House faces: NW
!�QEL-AIR Right-J® Worksheet
Entire House
DEL -AIR HEATING & AIR
NDITIONING
CO
531 CODISCO WAY, SANFDRD, FL 32771 Phone: 407-333-2665 Fax:407-3333853 Web: WWW.DEL-AIR.COM
Job: Lot 7 Block 5 Waterstone 15...
Date:
By: FLETCH
1
Room name
BR3
BATH2
2
Exposed wall
31.9 If
6.0 It
3
Room height
8.0 It heat/cool
8.9 If heat/cool
4
Room dimensions
1.0 a 162.0 It
9.5 x 6.0 It
5
Room area
162.0 IV
57.0 ft2
Ty
Construction
U-value
Or
HTM
Area (f?)
Load
Area (fR)
Load
number
(BtuWft-*F)
(Btu[Vftg
or perimeter (ft)
(Btuh)
or perimeter (ft)
(Bluh)
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
WP/S
Heat
Cool
6
_"-_..,
y/ ,.
L-_G
._...
Blk wall stucco_.ext
- -0.201
n
-"5 83
-, 4:06
18
_8
--46
32
`0
----" 0
- 0
0
2A 2ov„„_-,_ ___
_ -0.3W
__n-
_�._:9 57
_, _,-8.22
,,,_,__ :10
_._.,__0
,__._._96
w-w�.82
_0
..v-0
---.v 0
-__ _0
Blk wall, stucco ext
0.201
ne
5.83
4,06
44
44
256
179
0
0
0
0
10C_v
0.550
ne
15.95
39.50
0
0
0
0
0
0
0
0
lll------(CC'
11
2A-2ov
0.330
ne
9.57
17.70
0
0
0
0
0
0
0
0
W"` `
ILA
BliC..,.._.
stucco ext
°-0,33
se
--_--
583
"'8.52
0'
�� 0
; 0
`0
0
0
"�` 0
- `�0
PA-2ovl,
2A 2ov
0.330
as
9,57
8.52
- 0
0-
0
10
0
0
0
0
-EGG
2A 2ov •
''-0.330
se,
� '957
15.70
0
0
0
,. 0
0
0
� 0
-'.0
:2A 2ov_, ,_-„„,„,
0,330
..se-,...,.„957
,_J5.73
,,,__.-.. 0
__,-....�...0
.,,.,,,:.,„_,.0
_.._,.-__,_0
..._�.�0
0
0
Blk wall, stucco ext
0.201
sw
5.83
4.06
108
108
630
439
4B
48
280
195
2A-2ov
0.330
sw
9.57
14.67
0
0
0
0
0
0
0
0
I�----GG
2ov
0.330
sw
9 57
16.02
0
0
0
0
0
0
0
0
..2A
yl -
Blkwall stucco ext
0.201
`w,
-5.83
� 4.06
18
�"' 8
46
`--32
0�.
0
� 0
-0
�--C
2A 2ov_.,.:._....__.-....._-.
°D.330
_w_
._._..9.57
-.--...21.41
:._ ___10
_.__0
__.__.96
_: __214
_-__.-_.-_0
_..........0
_.,_-..,.w0
__._,-0
elk wall, stucco ext
0.201
nw
5.83
4.06
68
53
309
215
8
8
49
34
2A-20v
0.330
nw
9.57
16.61
15
0
144
249
0
0
0
0
2B-2fv
0.330
nw
9.57
22.09
0
0
0
0
0
0
0
0
11,10
0.600
nw
17.40
17.58
0
0
0
0
0
0
0
0
....M
p
__ __._•_. n .....__._
12C-Osw
._�..�,-
0.091
�'_.
._._.,_
0
•_0
.._, ..-. _.._-_ 0„
0
_.-_r..... 0.,_..,.
:'.�:D.__._,0:.__
_0:_,..._..,_0
NLD.-11D0,,,;:,,,-...__.....,_.._.m0.390_,n,....„11.31,.„.._11.43,..__._..._0__,_.0_..____0.,..,-'-_.,0
C
16B-30ad
0.032
0.93
1.69
162
162
150
274
62
62
58
105
2868.,_'0.00
__-...162._32_915,,.„�._,�0
„,_._..
._.,,_;.
._,_=578
_
._�,._772
_7.._-0
_..�
6
c) AED excursion
127
-17
Envelope loss/gain
2688
1843
558
317
12
a) Infiltration
520
145
115
32
b) Room ventilation
0
0
0
0
13
Internal gains: Occupants @ 230
0
0
0
0
Appliances/other
300
0
Subtotal (lines 6to 13)
3208
2288
673
349
Less external load
0
0
0
0
Less transfer
0
0
0
0
Redistribution
0
0
0
0
14
Subtotal
3208
2288
673
349
15
Duct loads
28%1
37°/
885
856
28%
379/6
186
131
Total room load
4094
3144
859
480
Air required (cfm)
164
131
34
20
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed
'r'I'r" wrlgtitsoR- 2020-May-2611:05:48
cA - ' RlgherstonetoO 5l2ACL.rupversal Cale 0.12 RSU23828 Page4
...Waterstone1512AGL\Lot5BIk5Waterslone7512AGL.rup Calc=MJB House faces: NW
PDEL AIR Right-J® Worksheet
Entire House
DEL -AIR HEATING & AIR
CONDITIONING
531 CODISCO WAY, SANFORD, FL32771 Phone: 407-333.2665 Fax: 407-333.3853 Web: WWW.DEL-AIR.COM
Job: Lot 7 Block 5 Waterstone 15...
Date:
By: FLETCH
1
Room name
BR2
KIT
2
Exposed well
11.0 It
10.0 ft
3
Room height
8.6 It heat/cool
8.7 ft heat/cool
4
Room dimensions
14.0 x 11.0 ft
1.0 x 120.8 It
5
Room area
154.0 If-
120.8 fI°
Ty
Construction
U-value
Or
HTM
Area (W)
Load
Area (ft2)
Load
number
(BtuWftz-F)
(BtuWft2)
or perimeter (ft)
(Btuh)
or perimeter (ft)
(Btuh)
Heat
I Cool
Gross
WP/S
'Heat
Cool
Gross
N/P/S
Heat
Cool
6
VVyy"'�
Blk-wall, stuccoext
�2A
'0.-201
n
-P�'S83
4:00
0'-
0
-0
' 7 0
:0
_'-"`_ 6
"` 0
'" 0
2ov „„„-,..„,,,-,,,,F
....._„0;330
-n_
_9.57,_,,,-
8.22
_-_..�.n..:0
Y.w._,..0
.,._...m..v,0
_0
__._0
_.._0
_,,:..,._,o
,-_,___0
�L-C
Blk wall, stucco ext
0.201
ne
5.83
4,06
0
0
0
0
0
0
0
0
III------fGG�
10C-v
0.550
no
15.95
39.50
0
0
0
0
0
0
0
0
11
2A-20v
0.330
ne
9.57
17.70
0
0
0
0
0
0
0
'Blk wall stucco ext
0.201
se
"-5 83
405
0
7 0
"'0
0
0
w -0
_'"`:�" 0
_0
0
2A 20v
0.330
se
9.57
8.52
0
0
0
' '0
0
0
0
0
PA-20V
0.330
se,2A.2ov_„,�_.,„_„e,q-
.957
15.70
0
0
. ` 0
0
0:
0
0
_ 0
0.330
�0.330
-se.
,„.._957,
_,-_,14.06
.,..a...._...88
M;....___
-......,,„418
..,,.,.,...291
.....�._ �..80
.�;...v.,.-,.70
:_.,___A
,_.....__
stucco ezt
sw
5.57
4.67
80
2
72
410
290
80
70
493
85
2A-wall,
2A-2ov
0.330
sw
9.57
14.02
0
0
0
10
3
93
143
143
2A 2ov
0,201
9.57
16.02
16
6
3
156
262
0
0
0
0
llyy
Blk wallstucco ext
m:0:201
W
w
-'-5.83
"`- 4:05
" -0
0
0
�'-".�0
0
0
7 --------- 70
c --0
_s-"C
;2A 2ov.,..-....._.._..,__
_.„ 4330
_w_
_ -9 57
_ _ 21.41
_-.,._. _10
__»...__-.0
u.,.._...._0
.1_.__0
0
_0
.."o
Blk wall, stucco ext
0.201
nw
5.83
4,06
0
0
0
0
0
0
0
0
2A-20v
0.330
nw
9.57
16.61
0
0
0
0
0
0
0
0
2B-2fv
0.330
nw
9.57
22.09
0
0
0
0
0
0
0
0
nn
0
0
0
0
0
0
0
R""-`
12C Osw
0091
�,...
264
1.31
" "0
_
_
_
I-_D
v ~-
^768
--0.032
___10.31
- 11.69
_'___0
V m
_. T�_�752
_130
,ta _-
_._'
30alcwd
c84
__ 277
130
120
279
89
-...
__28 66
:.:..,:_0:00
n,�„ J54
w..e,11
�,�.:;.` 315
.,'�.,.0
-v ,..�.121
y,.,=0
_.,..w_287
._ _. _".:..0
._.u`w s.
+v
•w_+......_+...rw-rc..s_„».'
„..m..�..-d.-.��::_._..._e-.._......._..v.u:._.
..............,.._.wu_.i�.ai._._�.«..�r�.......-...L�._.:a..a<.v.
__.-..-..-�«.'�..._.
_._..
w+c
E
,s...a....zr_.,
6
c) AED excursion
68
-11
Envelope loss/gain
1042
898
910
637
12
a) Infiltration
179
50
163
46
b) Room ventilation
0
0
0
0
13
Internal gains: Occupants @ 230
0
0
0
0
Appliances/other
300
1200
Subtotal (fines 6to 13)
1`1221
1248
1073
1883
Less external load
o
0
0
0
Less transfer
0
0
0
0
Redistribution
0
0
0
0
14
Subtotal
1221
1248
1073
1883
15
Duct loads
28%
37°/
337
467
28%
37%
296
704
Total room load
1558
1714
1369
Air required (cfm)
62
71
55
787
108
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
wrrghtvoR- 2020-May-2611:05:48
"' Right -Suite® Universal 2019 19.0.12 RSU23828 Page 5
... Waferstona1512AGULot501k5Waterstone1512AGL.rup Calc=MJ8 House faces: NW
! DEL -AIR Right-J® Worksheet
Entire House
DEL -AIR HEATING & AIR
531 CODISCO WAY, SANFORD, FL 327711� PPhhND407-a�r2665(Fax: 407333.3853 Web: WWW.DEL-AIR.COM
Job: Lot 7 Block 5 Waterstone 15...
Date:
By: FLETCH
1
Room name
DIN
GRT/FOWHALLS
2
Exposed wall
28.0 it
20.5 it
3
Room height
8.8 it heat/cool
10.0 it heat/cool
4
Room dimensions
1.0 x 119.0 it
1.0 x 426.5 it
5
Room area
119.0 it-
426.5 IF
Ty
Construction
U-value
Or
HTM
Area (ftx)
Load
Area (ft2)
Load
number
(Btuh/fh°F)
(Btuh/W)
or perimeter (ill
(Blunt
or perimeter (it)
(Btuh)
Heat
I Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
6
IV--
elk wall, stuccoeM
0201
n
: --583
,06
"0--,it
"'
`�"�0
_ _"0
__0
'�- 0
"' o
-"'�"-0
L
2
2A ov_ -�
. v0.330
.._n_
...�.::9 57
8:22
__0.,0
„.:___w_O
,L.U,-..... _0
.o
_-,-�.,..
_,-..... m 0
_._. �0
,__,.4.
._ _0
_G
a...,_z_0
0
Elk wall, stucco ext
0.201
ne
5.83
4.06
44
26
152
106
0
0
0
10Gv
0.550
ne
15.95
39.50
18
0
285
706
0
0
0
0
11
2A-2ov
0.330
no
9.57
17.70
0
0
0
0
0
0
0
0
4��/--C
k wa Blll, stucco ext
- 0 201
se
.'_5 83
£` 4:06
'96
_
A F 73
_ _"426
_
__ 297
140
_
110
A� 641
447
2A 2ov
'0330
se
957
8.52
0.
0
0
0
30
30
, 287
256
I --a
2A2ov
0,330
se
`,957
15.70
23
6
222
364
0
0
0
0
,...„...
2A 20v. _,„.
_.---0.330
_se-
-._.9.57
-.,-.-15.73
„__-_0
,.-._... .0
__._.__._0
_-A
._.,_._.v0
_-,____.:0
,_,__0
_-,.._...'.0
Blk wall, stucco ext
0.201
sw
5.83
4.06
92
92
536
374
0
0
0
0
2A-2ov
0.330
sw
9.57
14.67
0
0
0
0
0
0
0
0
2A-2ov
0.330
sw
9.57
16.02
0
0
0
0
0
0
0
0
Blk wall stuccoextb.201
w
_
"583
4.06
0
0
0
0
0
0
"0
.2A 2ov.___.._�_ _
., _ _0.330
._w_
_-x.9 57.
__21.41
.,_ _...,_0
.,_._,_....0
.___.., 0
__......_,_:0
m---_.__ 0
, __ _ _0_
_ _.. __0
__,._,._0
Blk wall, stucco ext
0.201
nw
5.83
4.06
0
0
0
0
65
42
244
170
2A-2ov
0,330
nw
9.57
16.61
0
0
0
0
0
0
0
0
2B-2fv
0.330
nw
9.57
22.09
0
0
0
0
3
0
29
66
11J0
0.600
nw
1740
17.58
0
0
0
0
20
20
350
353
q -
12C-Osw
0 091
�2 64
'- ,1,31
0
"'� 0
' 0
y='0
140
' 122
'" ` 322
'_»__ 160
LD,.11D0,;,�,_..--�
_-_
___... .0390
„..n'
_ 1131
,_..,_11.43,,.._
_._O
...Y___0____
_0
__,._.-..,,,.0
,. ____18
_ �.. _18
.,__202.n..._.204
C
168-30ad
0.032
-
0.93
1.69
129
129
120
219
427
427
396
721
F=.
22A tPl.::,� .:.t
..._.. 0989
.. .,.._
, 28.68
,„,.0.0019
__ v,28
„_.__..803
--.,_:,..._._...0
71
6
c)AED excursion
-61
-162
Envelope loss/gain
2545
2005
3059
2215
12
a) Infiltration
473
132
417
117
b) Room ventilation
0
0
0
0
13
Internal gains: Occupants @ 230
1
230
2
460
Appliances/other
0
600
Subtotal (lines 6 to 13)
3018
2367
3476
3391
Less external load
0
0
0
0
Less transfer
0
0
0
0
Redistribution
0
0
0
0
14
Subtotal
3018
2367
3476
3391
15
Duct loads
28%
37%
833
885
28%
37%
959
1268
Total room load
3851
3252
4436
4660
Air required (cfm)
154
136
178
194
Calculations approved by ACCA to meet all requirements of Manual J Hth Ed.
wrtgt�l�of!- 'l '^ Right -Suite® Universal 2019 19.0.12 RSU23828 2020-May-2611:05:48
...Waterstone152AGL\Lo15BIk5Walerslone1512AGLrup CaIc=MJB House faces: NW Page 6
Duct System Summary Job: Lot 7 Block 5 Waterston...
�DEL-AIR Date:
RBmNB• AIR CONBmONING Entire House By: FLETCH
DEL -AIR HEATING & AIR CONDITIONING
531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665 Fax: 407-333-3853 Web: WWW.DEL-AIR.COM
Project•
For: ADAMS HOMES
5325 San Bendetto Place, Fort Pierce, FL 34951
External static pressure
Pressurelosses
Available static pressure
Supply / return available pressure
Lowest friction rate
Actual air flow
Total effective length (TEL)
Heating
0.40
in H2O
0.06
in H2O
0.34
in H2O
0.170 / 0.170
in H2O
0.359
in/100ft
947
cfm
95 ft
Cooling
0.40
in H2O
0.06
in H2O
0.34
in H2O
0.170 / 0.170
in H2O
0.359
in/100ft
947
cfm
Name
Design
(Btuh)
Htg
(cfm)
Clg
(cfm)
Design
FR
Diam
(in)
H x W
(in)
Duct
Matl
Actual
Ln (ft)
Ftg.Egv
Ln (ft)
Trunk
BATH2
h 859
34
20
0.379
4.0
Ox0
VIFx
19.7
70.0
BR2
c 1714
62
71
0.408
6.0
Ox0
VIFx
13.3
70.0
BR3
h 4094
164
131
0.359
7.0
Ox0
VIFx
24.7
70.0
DIN
h 3851
154
136
0.370
7.0
Ox0
VIFx
22.0
70.0
GRT/FOY/HALLS
c 4660
178
194
0.458
8.0
0x0
VIFx
4.3
70.0
KIT
c 2587
55
108
0.406
6.0
Ox0
VIFx
13.7
70.0
LAU
c 993
9
41
0.456
4.0
Ox0
VIFx
4.6
70.0
MBATH
h 1813
73
48
0.430
6.0
Ox0
VIFx
9.0
70.0
MBR
h 4670
187
178
0.411
8.0
Ox0
VIFx
12.8
70.0
WC
h 494
20
10
0.417
4.0
Ox0
VIFx
11.5
70.0
WIC
h 295
12
9
0.453
4.0
Ox0
VIFx
5.0
70.0
Return Branch Detail Table
Name
Grille
Size (in)
Htg
(cfm)
Clg
(cfm)
TEL
(ft)
Design
FR
Veloc
(fpm)
Diam
(in)
H x W
(in)
Stud/Joist
Opening (in)
Duct
Matt
Trunk
rb2
Ox0
947
947
0
0
0
0
Ox 0
VIFx
wrightsoft-
. Right -Suite® Universal 2019 19.0.12 RSU23828
...Waterstonel512AGL\Lot5Blk5Waterstonel512AGLrup Colo =MJ8 House faces: NW
2020-May-26 11:05:48
Page 1
2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: Lot 7 Block 5 Port St Lucie 1512 AGL Builder Name: ADAMS HOMES
Street: 5325 San Bendetto Place Permit Office:
City, State, Zip: Fort Pierce , FL , 34951 Permit Number:
Y
U
Owner: Jurisdiction: 661000
w
Design Location: FL, ST_LUCIE_CO_INTL
x
U
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous air barrier shall be installed in the building envelope.
Air -permeable insulation shall
requirements
The exterior thermal envelope contains a continuous air barrier.
not be used as a sealing material.
Breaks or joints in the air barrier shall be sealed.
Ceiling/attic
The air barrier in any dropped ceiling/soffit shall be aligned with
The insulation in any dropped ceiling/soffit
the insulation and any gaps in the air barrier shall be sealed.
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
Walls
The junction of the foundation and sill plate shall be sealed.
Cavities within corners and headers of frame walls
The junction of the top plate and the top of exterior walls shall be
shall be insulated by completely filling the cavity
sealed.
with a material having a thermal resistance of R-3
Knee walls shall be sealed.
per inch minimum.
Exterior thermal envelope insulation for framed
walls shall be installed in substantial contact and
continuous alignment with the air banner.
Windows, skylights
The space between window/doorjambs and framing, and
and doors
skylights and framing shall be sealed.
Rim joists
Rim joists shall include the air barrier.
Rim joists shall be insulated..
Floors
The air barrier shall be installed at any exposed edge of
Floor framing cavity insulation shall be installed to
(including
insulation.
maintain permanent contact with the underside of
above -garage
subfloor decking, or floor framing cavity insulation
and cantilevered
shall be permitted to be in contact with the top side
floors)
of sheathing, or continuous insulation installed on
the underside of floor framing and extends from the
bottom to the lop of all perimeter floor framing
members.
Crawl space walls
Exposed earth in unvented crawl spaces shall be covered with
Where provided instead of floor insulation, insulation
a Class I vapor retarder with overlapping joints taped.
shall be permanently attached to the crawlspace
Shafts, penetrations
Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned space shall be sealed.
Batts in narrow cavities shall be cut to fit, or narrow
Narrow cavities
cavities shall be filled by insulation that on
installation readily conforms to the available cavity
spews.
Garage separation
Air sealing shall be provided between the garage and conditioned spac
as.
Recessed lighting
Recessed light fixtures installed in the building thermal envelope
Recessed light fixtures installed in the building
shall be sealed to the drywall.
thermal envelope shall be air tight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring
and plumbing in exterior walls, or insulation that on
installation readily conforms to available space shall
extend behind ninona and wirina.
Shower/tub
The air barrier installed at exterior walls adjacent to showers and
Exterior walls adjacent to showers and tubs shall
on exterior wall
tubs shall separate them from the showers and tubs.
be insulated.
Electrical/phone box or
The air barrier shall be installed behind electrical or communication
exterior walls
boxes or air -sealed boxes shall be installed.
HVAC register boots
HVAC register boots that penetrate building thermal envelope shall
be sealed to the sub -floor or drywall.
Concealed
When required to be sealed, concealed fire sprinklers shall only be
sprinklers
sealed in a manner that is recommended by the manufacturer.
I
Caulking or other adhesive sealants shall not be used to fill voids
between fire snrinkler cover plates and walls or cellfrics.
a. In addition, Inspection of log walls shall be in accordance with the provisions of ICC-4U0.
5/26/2020 11:30 AM EnergyGaugeO USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1
FORM R405-2017
RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST
Florida Department of Business and Professional Regulation
Simulated Performance Alternative (Performance) Method
Applications for compliance with the 2017 Florida Building Code, Energy Conservation via the
residential Simulated Performance Method shall include:
❑ This checklist
❑ A Form R405 report that documents that the Proposed Design complies with Section
R405.3 o1 the Florida Energy Code. This form shall include a summary page
indicating home address, a -ratio and the pass or fail status along with summary
areas and types of components, whether the home was simulated as a worst -case
orientation, name and version of the compliance software tool, name of individual
completing the compliance report (one page) and an input summary checklist that can
be used for field verification (usually four pages/may be greater).
❑ Energy Performance Level (EPL) Display Card (one page)
❑ HVAC system sizing and selection based on ACCA Manual S or per exceptions provided in Section R403.7
❑ Mandatory Requirements (five pages)
Required prior to CO for the Performance Method:
❑ Air Barrier and Insulation Inspection Component Criteria checklist (Table R402.4.1.1 -
one page)
❑ A completed Envelope Leakage Test Report (usually one page)
❑ If Form R405 duct leakage type indicates anything other than "default leakage", then a completed
Form R405 Duct Leakage Test Report (usually one page)
5/26/2020 11:29:36 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1
Envelope Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performance or ERI Method Compliance
2017 Florida Building Code, Energy Conservation, 6th Edition
Jurisdiction: 6 61 000
Permit #:
Job lnforrnation
Builder: ADAMS HOMES Community: Lot: NA
Address: 5325 San Bendetto Place
City: Fort Pierce State: FL Zip: 34951
Air Leakage,Test Results Passing results must meet either the Pedbrmance, Prescriptive, or ERhMethOd-
..
QO PRESCRIPTIVE METHOD -The building orawelling unit,shall'be tested and verified as having an air leakage rate of not exceeding 7 pair
changes,per hour at a,pressure of 0.2 incti�w.g. (50 Pascals) in Climate'Zones 1 and,2.
Q • PERFORMANCE or ERI METHOD -The building or dwalling unit stall be tested a4d-verified as having an air leakage rate of nobexceeding
the selected ACH(60),value, as shown on Form RQ45 2017 (Peiformance) or'R406-2gi7 (ERI) =section labeled as infiltration, sub -section ACH50..
ACH(50) specified on FormR405 2017 Energy Calc (PiHormance) or R40630f7'(ERR: „,7000
%x
60 _ 13608 Method for calculating building volume:
CFM(50) Building Volume ACH(50)
O Retrieved from architectural plans
PASS
0 Code software calculated
When ACH(50) is less than 3, Mechanical Ventilation installation O Field measured and calculated
must be verified by building department.
R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals)
Testing shall be conducted by either Individuals as defined in Section 553.993(5) or (7), Florida Statues.or individuals licensed as set forth in Section
489.105(3)(f), (g), or (1) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and
provided to thecode official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration
control measures.
2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control
measures.
3. Interior doors, if installed at the time of the test, shall be open.
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, If installed at the time of the test, shall be turned off.
6. Supply and return registers, if installed at the time of the test, shall be fully open.
Testing Company
Company Name: Phone:
I hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code
Energy Conservation requirements according to the compliance method selected above.
Signature of Tester: Date of Test:
Printed Name of Tester:
License/Certification #: Issuing Authority:
5/26/2020 11:30:52 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 61h Edition (2017) Compliant Software Page 1 of 1
Florida Building Code, Energy Conservation, 6th Edition (2017).
Mandatory Requirements for Residential Performance, Prescriptive and ERI Methods
ADDRESS: 5325 San Bendetto Place Permit Number:
Fort Pierce, FL, 34951
MANDATORY REQUIREMENTS See'individual code sections for full details.
SECTION R401 GENERAL
R401.3 Energy Performance Level (EPL) display card (Mandatory)The building official shall require that an energy performance level (EPL)
display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy. Florida law
(Section 553.9085, Florida Statutes) requires the EPL display card to be included as an addendum to each sales contract for both presold and
nonpresold residential buildings. The EPL display card contains information indicating the energy performance level and efficiencies of components
installed in a dwelling unit. The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans
and specifications submitted to demonstrate code compliance for the building. A copy of the EPL display card can be found in Appendix RD.
R402.4 Air leakage (Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of
Sections R402.4.1 through R402.4.5.
Exception: Dwelling units of R-2Occupancies and multiple attached single family dwellings shall be permitted to
comply with Section C402.5.
R402.4.1 Building thermal envelditre building thermal envelope shall comply with Sections R402.4.1.1 and R402.4.1.2.
The sealing methods between dissimilar materials shall allow for differential expansion and contraction.
El R402.4.1.1 InstallationThe components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance
with the manufacturer's instructions and the criteria listed in Table R402.4.1.1, as applicable to the method of construction. Where required
by the code official, an approved third party shall inspect all components and verify compliance.
❑ R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate not exceeding seven air
changes per hour in Climate Zones 1 and 2, and three air changes per hour In Climate Zones 3 through 8. Testing shall be conducted in
accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (60 pascals). Testing shall be conducted by either
individuals as defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(0, (g) or (i) or
an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code
official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
Exception: Testing is not required for additions, alterations, renovations, or repairs, of the building thermal envelope of existing
buildings in which the new construction is less than 85 percent of the building thermal envelope.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the Intended weatherstripping or
other infiltration control measures.
2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended
infiltration control measures.
3. Interior doors, if installed at the time of the test, shall be open.
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, if installed at the time of the test, shall be turned off.
6. Supply and return registers, if installed at the time of the test, shall be fully open.
❑ R402.4.2 Fireplaces. New wood -burning fireplaces shall have fight -fitting Flue dampers or doors, and outdoor combustion air. Where
using tight -fitting doors on factory -built fireplaces listed and labeled in acwrdance with UL 127, the doors shall be tested and listed for the
fireplace. Where using tight -fitting doors on masonry fireplaces, the doors shall be listed and labeled in accordance with UL 907.
❑ R402.4.3 Fenestration air IeakageWindows, skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm per
square foot (1.5 Us/m2), and swinging doors no more than 0.5 cfm per square foot (2.6 Us/m2), when tested according to NFRC 400 or
AAMA/ WDMA/CSA 101/I.S.2/A440 by an accredited, independent laboratory and listed and labeled by the manufacturer.
Exception: Site -built windows, skylights and doors.
5/26/2020 11:30 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 5
MANDATORY REQUIREMENTS - (Continued)
❑ R402.4.4 Rooms containing fuel -burning appliances. In Climate Zones 3 through 8, where open combustion air ducts provide combustion air to
open combustion fuel burning appliances, the appliances and combustion air opening shall be located outside the building thermal envelope or
enclosed in a room, isolated from inside the thermal envelope. Such rooms shall be sealed and insulated in accordance with the envelope requirements
of Table R402.1.2, where the walls, Floors and ceilings shall meet not less than the basement wall R-value requirement. The door Into the room shall be
fully gasketed and any water lines and ducts in the room insulated in accordance with Section R403. The combustion air duct shall be insulated where it
passes through conditioned space to minimum of R-8.
Exceptions:
1. Direct vent appliances with both intake and exhaust pipes installed continuous to the outside.
2. Fireplaces and stoves complying with Section R402.4.2 and Section R1006 of the Florida Building Code, Residential.
❑ R402.4.5 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakage
between conditioned and unconditioned spaces. All recessed luminaires shall be IC -rated and labeled as having an air leakage rate not
mom than 2.0 cfm (0.944 Us) when tested in accordance with ASTM E283 at a 1.57 psf (75 Pa) pressure differential. All recessed
luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering.
SECTION R403 SYSTEMS
R403.1 Controls.
R403.1.1 Thermostat provision (Mandatory). At least one thermostat shall be provided for each separate heating and cooling system.
❑ R403.1.3 Heat pump supplementary heat (Mandatory). Heat pumps having supplementary electric -resistance heat shall have controls
that, except during defrost, prevent supplemental heat operation when the heat pump compressor can meet the heating load.
❑ R403.3.2 Sealing (Mandatory) All ducts, air handlers, filler boxes and building cavities that form the primary air containment passageways
for air distribution systems shall be considered ducts or plenum chambers, shall be constructed and sealed in accordance with Section
C403.2.9.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria below.
Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC 380 by either individualsas defined in Section 553.993(5) or
(7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(0, (g) or (i), Florida Statutes, to be "substantially leak free' in
accordance with Section R403.3.3.
❑ R403.3.2.1 Sealed air handler. Air handlers shall have a manufacturer's designation for an air leakage of no more than 2 percent
of the design airflow rate when tested in accordance with ASHRAE 193.
❑ R403.3.3 Duct testing (Mandatory). Ducts shall be pressure tested to determine air leakage by one of the following methods:
1, Rough -in test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the system, including the
manufacturer's air handler enclosure if installed at the time of the test. All registers shall be taped or otherwise sealed during the test.
2. Postconstruction test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the
entire system, Including the manufacturer's air handler enclosure. Registers shall be taped or otherwise sealed during the
test.
Exceptions:
1. A duct air leakage test shall not be required where the ducts and air handlers are located entirely within the building
thermal envelope.
2. Duct testing is not mandatory for buildings complying by Section 405 of this code.
A written report of the results of the test shall be signed by the party conducting the test and provided to the code official.
❑ R403.3.5 Building cavities (Mandatory). Building framing cavities shall not be used as ducts or plenums.
011403.4 Mechanical system piping insulation (Mandatory). Mechanical system piping capable of carrying Fluids above 105°F (41°C)
or below 55°F (13°C) shall be insulated to a minimum of R-3.
❑ R403.4.1 Protection of piping insulation. Piping insulation exposed to weather shall be protected from damage, including that
caused by sunlight, moisture, equipment maintenance and wind, and shall provide shielding from solar radiation that can cause
degradation of the material. Adhesive tape shall not be permitted.
❑ R403.5.1 Heated water circulation and temperature maintenance systems (Mandatory)Heated water circulation systems shall be in
accordance with Section R403.5.1.1. Heat trace temperature maintenance systems shall be in accordance with Section R403.5.1.2.
Automatic controls, temperature sensors and pumps shall be accessible. Manual controls shall be readily accessible.
R403.5.1.1 Circulation systems. Healed water circulation systems shall be provided with a circulation pump. The system return
❑ pipe shall be a dedicated return pipe or a cold water supply pipe. Gravity and thermosiphon circulation systems shall be prohibited.
Controls for circulating hot water system pumps shall start the pump based on the identification of a demand for hot water within the
occupancy. The controls shall automatically turn off the pump when the water in the circulation loop is at the desired temperature and
when there Is no demand for hot water.
❑ R403.5.1.2 Heat trace systems. Electric heat trace systems shall comply with IEEE 515.1 or UL 515. Controls for such systems
shall automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping in accordance
with the times when heated water is used in the occupancy.
5/26/2020 11:30 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 2 of 5
MANDATORY REQUIREMENTS - (Continued)
R403.5.5 Heat traps (Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have
heat traps installed on both the Inlets and outlets. External heat traps shall consist of either a commercially available heat trap or a
downward and upward bend of at least 3 V2 inches (89 mm) in the hot water distribution line and cold water line located as close as possible
to the storage tank.
R403.5.6 Water heater efficiencies (Mandatory).
R403.5.6.1.1 Automatic controls. Service water -heating systems shall be equipped with automatic temperature controls capable
of adjustment from the lowest to the highest acceptable temperature settings for the intended use. The minimum temperature
setting range shall be from 100°F to 140°F (38°C to 60°C).
❑ R403.5.6.1.2 Shut down. A separate switch or a clearly marked circuit breaker shall be provided to permit the power supplied to
electric service systems to be turned off. A separate valve shall be provided to permit the energy supplied to the main bumer(s) of
combustion types of service water -heating systems to be turned off.
R403.5.6.2 Water -heating equipment. Water -heating equipment installed in residential units shall meet the minimum efficiencies of
Table C404.2 in Chapter 4 of the Florida Building Code, Energy Conservation, Commercial Provisions, for the type of equipment installed.
Equipment used to provide heating functions as part of a combination system shall satisfy all stated requirements for the appropriate
water -heating category. Solar water heaters shall meet the criteria of Section R403.5.6.2.1.
R403.5.6.2.1 Solar water -heating systems. Solar systems for domestic hot water production are rated by the annual solar energy
factor of the system. The solar energy factor of a system shall be determined from the Florida Solar Energy Center Directory of
Certified Solar Systems. Solar collectors shall be tested in accordance with ISO Standard 9806. Test Methods for Solar Collectors,
and SRCC Standard TM-1, Solar Domestic Hot Water System and Component Test Protocol. Collectors in Installed solar
water -heating systems should meet the following criteria:
1. Be installed with atilt angle between 10 degrees and 40 degrees of the horizontal; and
2. Be installed at an orientation within 45 degrees of true south.
❑ R403.6 Mechanical ventilation (Mandatory). The building shall be provided with ventilation that meets the requirements of the
Florida Building Code, Residential, or Florida Building Code, Mechanical, as applicable, or with other approved means of ventilation
including: Natural, Infiltration or Mechanical means. Outdoor air intakes and exhausts shall have automatic or gravity dampers that
close when the ventilation system is not operating.
R403.6.1 Whole -house mechanical ventilation system fan efficacy. When installed to function as a whole -house mechanical
ventilation system, fans shall meet the efficacy requirements of Table R403.6.1.
Exception: Where whole-housemechanical ventilation fans are integral to tested and listed HVAC equipment, they shall be
powered by an electronically commutated motor.
R403.6.2 Ventilation air. Residential buildings designed to be operated at a positive indoor pressure or for mechanical ventilation
shall meet the following criteria:
1. The design air change per hour minimums for residential buildings in.ASHRAE 62.2, Ventilation for Acceptable
Indoor Air Quality, shall be the maximum rates allowed for residential applications.
2. No ventilation or air-conditioning system make-up air shall be provided to conditioned space from atfics,
cmwlspaces, attached enclosed garages or outdoor spaces adjacent to swimming pools or spas.
3. If ventilation air is drawn from enclosed space(s), then the walls of the space(s) from which air Is drawn shall be
insulated to a minimum of R-11 and the ceiling shall be insulated to a minimum of R-19,space permitting, or R-10
otherwise.
R403.7 Heating and cooling equipment (Mandatory).
R403.7.1 Equipment sizing. Heating and cooling equipment shall be sized in accordance with ACCA Manual S based on the
equipment loads calculated in accordance with ACCA Manual J or other approved heating and cooling calculation methodologies,
based on building loads for the directional orientation of the building. The manufacturer and model number of the outdoor and
indoor units (if split system) shall be submitted along with the sensible and total cooling capacities at the design conditions
described in Section R302.1. This Code does not allow designer safety factors, provisions for future expansion or other factors that
affect equipment sizing. System sizing calculations shall not include loads created by local intermittent mechanical ventilation such
as standard kitchen and bathroom exhaust systems. New or replacement heating and cooling equipment shall have an efficiency
rating equal to or greater than the minimum required by federal law for the geographic location where the equipment Is installed.
TABLE R403.6.1
WHOLE -HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACY
FAN LOCATION
AIRFLOW RATE MINIMUM
(CFM)
MINIMUM EFFICACY a
(CFM/WATT)
AIRFLOW RATE MAXIMU
(CFM)
Range hoods
Any
2.8 rim/watt
Any
In -line fan
Any
2.8 cfm/watt
Any
Bathroom, utility room
10
1.4 cfm/watt
<90
Bathroom, utility room
90
2.8 cfm/watt
Any
For SI: 1 cfm = 28.3 L/min. a. When tested in accordance with HVI Standard 916
5/26/2020 11:30 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 3 of 5
MANDATORY REQUIREMENTS - (Continued)
❑ R403.7.1.1 Cooling equipment capacity. Cooling only equipment shall be selected so that its total capacity is not less
than the calculated total load but not more than 1.15 times greater than the total load calculated according to the procedure selected in
Section 403.7, or the closest available size provided by the manufacturer's product lines. The corresponding latent capacity of the
equipment shall not be less than the calculated latent load.
The published value for AHRI total capacity is a nominal, rating -test value and shall not be used for equipment sizing. Manufacturer's
expanded performance data shall be used to select cooling -only equipment. This selection shall be based on the outdoor design dry-bulb
temperature for the load calculation (or entering water temperature for water -source equipment), the blower CFM provided by the expanded
performance data, the design value for entering wet -bulb temperature and the design value for entering dry-bulb temperature.
Design values for entering wet -bulb and dry-bulb temperatures shall be for the indoor dry bulb and relative humidity used for the load
calculation and shall be adjusted for return side gains if the return ducts) is installed in an unconditioned space.
Exceptions:
1. Attached single- and multiple -family residential equipment sizing may be selected so that its cooling capacity is less than the
calculated total sensible load but not less than 80 percent of that load.
2.
When signed and sealed by a Florida -registered engineer, in attached single- and multiple -family units, the capacity of
equipment may be sized in accordance with good design practice.
R403.7.1.2 Heating equipment capacity.
❑ R403.7.1.2.1 Heat pumps. Heat pump sizing shall be based on the cooling requirements as calculated according to Section
R403.7.1.1, and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load even if
the design heating load is 1.15 times greater than the design cooling load.
❑ R403.7.1.2.2 Electric resistance furnaces. Electric resistance furnaces shall be sized within 4 kW of the design
requirements calculated according to the procedure selected in Section R403.7.1.
❑ R403.7.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural draft atmospheric bumers
shall not be less than the design load calculated in accordance with Section R403.7.1.
❑ R403.7.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or heating equipment capacity on an
intermittent basis, such as anticipated additional loads caused by major entertainment events, shall have equipment sized or controlled to
prevent continuous space cooling or heating within that space by one or more of the following options:
1. A separate cooling or heating system is utilized to provide cooling or heating to the major entertainment areas.
2. A variable rapacity system sized for optimum performance during base load periods is utilized.
R403.8 Systems serving multiple dwelling units (Mandatory). Systems serving multiple dwelling units shall comply with Sections
❑ C403 and C404 of the IECC—Commercial Provisions in lieu of Section R403.
❑ R403.9 Snow melt and ice system controls (Mandatory) Snow- and ice -melting systems, supplied through energy service to the building,
shall include automatic controls capable of shutting off the system when the pavement temperature is above 50°F (10°C), and no
precipitation is falling and an automatic or manual control that will allow shutoff when the outdoor temperature is above 40°F (4.8°C).
❑ R403.10 Pools and permanent spa energy consumption (Mandatory). The energy consumption of pools and permanent spas
shall be in accordance with Sections R403.10.1 through R403.10.5.
R403.10.1 Heaters. The electric power to heaters shall be controlled by a readily accessible on -off switch that is an
integral part of the heater mounted on the exterior of the heater, or external to and within 3 feet (914 mm) of the heater. Operation
of such switch shall not change the setting of the heater thermostat. Such switches shall be In addition to a circuit breaker for the
power to the heater. Gas -fired heaters shall not be equipped with continuously burning ignition pilots.
R403.10.2 Time switches. Time switches or other control methods that can automatically turn off and on according to a preset schedule
shall be installed for healers and pump motors. Heaters and pump motors that have built-in time switches shall be in compliance with this
section.
Exceptions:
1. Where public health standards require 24-hour pump operation.
2. Pumps that operate solar- and waste -heat -recovery pool heating systems.
3. Where pumps are powered exclusively from on -site renewable generation.
R403.10.3 Covers. Outdoor heated swimming pools and outdoor permanent spas shall be equipped with a vapor -retardant cover on or at
El the water surface or a liquid cover or other means proven to reduce heat loss.
Exception: Where more than 70 percent of the energy for heating, computed over an operation season, is from site -recovered
energy, such as from a heat pump or solar energy source, covers or other vapor -retardant means shall not be required.
R403.10.4 Gas- and oil -fired pool and spa heaters. All gas- and oil -fired pool and spa heaters shall have a minimum thermal
❑ efficiency of 82 percent for heaters manufactured on or after April 16, 2013, when tested in accordance with ANSI Z 21.56. Pool
heaters fired by natural or LP gas shall not have continuously buming pilot lights.
5/26/2020 11:30 AM EnergyGaugeO USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 4 of 5
R403.10.5 Heat pump pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance.
with AHRI 1160, Table 2, Standard Rating Conditions -Low Air Temperature. A lest report from an independent laboratory is
required to verify procedure compliance. Geothermal swimming pool heat pumps are not required to meet this standard.
R403.11 Portable spas (MandatoryW energy consumption of electric -powered portable spas shall be controlled by the
requirements of APSP-14.
SECTION R404
ELECTRICAL POWER AND LIGHTING SYSTEMS
R404.1 Lighting equipment (Mandatory). Not less than 75 percent of the lamps in permanently installed lighting fixtures shall be
high -efficacy lamps or not less than 75 percent of the permanently installed lighting fixtures shall contain only high -efficacy lamps.
Exception: Low -voltage lighting.
R404.1.1 Lighting equipment (Mandatory)Fuel gas lighting systems shall not have continuously burning pilot lights.
5/26/2020 11:30 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 5 of 5