Loading...
HomeMy WebLinkAboutConstruction PlansSETUP' AND INSTALLATION OF SINGLE WIDE SHED 1. BUILDING IS PLACED IN REQUESTED LOCATION ON SCHEDULE 40 PVC TO ALLOW FOR MOVEMENT TO PLUM OR SQUARE UNIT TO HOUSE, FENCE, PROPERTY LINE, ETC. 2. ONCE UNIT IS SQUARE AND THE HIGH SPOT OF THE GROUND IS ESTABLISHED, THE BUILDING IS BLOCKED ON THE HIGH SPOT AND LEVELED. THE OTHER END OF THE BUILDING IS BROUGHT UP TO LEVEL AND BLOCKED, THEN THE CENTER OF THE BUILDING IS SUPPORTED TO LEVEL, BLOCKED, AND THEN SHIMMED. 3. AFTER THE BUILDING IS LEVEL, MORE BLOCKS ARE ADDED TO ACHIEVE THE CORRECT SPACING (SEE TABLE 3). 4. ANCHOR PLACEMENT IS ESTABLISHED BY THE WIDTH OF THE BUILDING. HOLES ARE DRILLED THRU THE 2"x4' BOTTOM PLATE WITH A 1/2" AUGER BIT. 1/2" EYEBOLT OR OPTIONAL 1/2- THREADED ROD (FOR A -HIGH SET-) IS SECURED THRU THE HOLE. 5. ANCHORS ARE NOT REQUIRED IN THE BOTTOM PLATE FOR DOORS AND DOORWAYS WITH NO FOOTER (GARAGE DOORS FOR EXAMPLE). HEADER DESIGN TRANSFERS THESE LOADS. 6. IF THE UNIT HAS A FLOOR, EITHER A HOLE IS DUG FOR THE 30" AUGER ANCHOR AND BACKFILLED AND SECURED AS PER THE DETAIL OR A 1/2' HOLE IS DRILLED IWO THE CONCRETE 1-1/2" OFF OF RIM JOIST. THE EYEBOLT IS FASTENED THRU THE BOTTOM PLATE AND A SIMPSON A-24 (OR EQUAL) IS SECURED TO THE CONCRETE WITH A 1/2" WEDGE ANCHOR. 7. IF THE UNIT IS A 'NO FLOOR' OPTION, ANCHOR WITH 1/2"x5' WEDGE ANCHOR THRU THE 2"x4" BOTTOM PLATE. TABLE 1 ANCHORING 0 CONCRETE SHED WIDTH UPUFF (PLF) ANCHOR SPACING 20'-0" 400 S-W 13'-8" 280 S-6' 11'-8" 240 3,-45. 1o'-O" 200 3,-4. 8'-0. 160 V-61 6'-0• 120 S_w TABLE 2 SKID RUNNER SPACING - SHED WIDTH X1 X2 X3 13'-8" V-10)' 1'-Iw I V-8" 2'-8' 6'-4• - 10'-0" V-7" 6•-10' - 8'-0" O'-9' W-6' - 6'-0" 0'-10" 51• - -VALUES ARE FROM END OF JOIST TO CENTERS OF (2) 4'.4' SKIDS ONLY. IS-8' WIDE SHEDS HAVE (4) SETS OF SKIDS SETUP AND INSTALLATION OF DOUBLE WIDE SHED 1. BUILDING IS PLACED IN REQUESTED LOCATION. THE FIRST SECTION OF THE DOUBLE WIDE IS PLACED ON THE HIGHEST LOCATION OF GROUND AND IS LEVELED UP. 2. BLOCKS ARE THEN PLACED AT THE END, CENTER. AND OTHER END TO LEVEL ONCE THE BUILDING IS LEVEL, BLOCKS ARE ADDED TO ACHIEVE THE CORRECT SPACING (SEE TABLE 3). 3. THE NEXT SECTION OF THE SHED IS BACKED INTO PLACE AND UNLOADED PARALLEL WITH THE FIRST SECTION. THE TWO SECTIONS ARE CONNECTED AT THE LOWER CORNER WITH (1�'x4j" BOLT AND NUT. THE SECOND SECTION IS THEN LEVELED AND THE OTHER BOLT HOLES ARE LINED UP AND BOLTED SECURE. THE REST OF THE BLOCKING IS THEN COMPLETED. THIS PROCEDURE IS REPEATED FOR MULTIPLE SECTION SHEDS UNTIL ALL SECTIONS ARE IN PLACE. 4. GROUND ANCHORS ARE THEN ADDED (SEE TABLE 4B). 5. ONCE THE BUILDING IS PROPERLY BLOCKED AND BOLTED TOGETHER, THE SUPPORT BRACING IS REMOVED. 6. ANCHORS ARE NOT REQUIRED IN THE BOTTOM PLATE FOR DOORS AND DOORWAYS WITH NO FOOTER (GARAGE DOORS FOR EXAMPLE). HEADER DESIGN TRANSFERS THESE LOADS. TABLE 3A PAD TYPES TYPE PAD DIMENSIONS MAX. LOAD- MATERIAL I 2'x8'06' 1778LBS CONCRETE CEMENT AND SAND MIX II 4'x8•x16• 3500LBS CONCRETE BLOCK OJ 1Y CEMENT AND SAND MIX III 16'06' 395OL13S ABS PLASTIC PADS IV 8•x8•x16• 1900LBS CO CEMENT CRETE BLOCK UOff AND SAND MIX • BASED ON 2000PSF SOIL BEARING CAPACITY (ZWOPSF IS TYPICAL) NOTE 1. LOW OR SCUD CONCRETE BLOCKS (8-x8-xi6') MAY BE STACKED ON PADS FOR HIGH SETS UP TO 48' WITHOUT REINFORCING. 2. ADS PADS REQUIRED ON 1T-6' AND 13'-8' WIDE SHEDS ONLY. TABLE 3 SUPPORT FOOTING PAD SPACING FOR RUNNER BLOCKING FOR SINGLE & DOUBLE WIDE SHEDS SHED DESCRIPTION PAD MAXIMUM LOAD AND PAD TYPE SHED WIDTH TYPE LW(PLF) END PAD MAX. SPACING END PAD SIDE RUNNER PAD TYPE INTERIOR PAD SIDE RUNNER PAD TYPE 13'-8" SW/DW 4.15/332 0' TO 6" 6'-0" 1936LB I, II. III, OR IV 1879LB I, II, III, OR IV 11'-8" SW/DW 6.00/480 0' TO 6' 61-0. 2558LB I, H. III, OR IV 2558LB I, II, III, OR N 10'-0" SW/DW 5.00/400 0' TO 6' 6'-0. 24COLS I, II, III, OR IV 2400LB I, II, III, OR IV 8'-O" SW 4.00/320 0- TO 6' 6'-0. 2029LB I, It. III, OR Al 2133LB I, II, III, OR N C-0" SW 3.00/240 1 0' TO 6' 6'-0. 16581E I, II, III, OR IV 1866LB I, II. III, OR N • LOAD WITH OF UPLIFT ON RUNNER NOTE ,PAD SPACING 15 END TO CENTER OF PAD. 2. PADS OTHER THAN END PADS SPACING IS CENTER TO CENTER. 3. USE SURE MAXIMUM SPACING FOR INTERIOR SPACING. RECEIVED JUL 0.8 2020 ST. Lucie County, Permitting GENERAL NOTES & SPECIFICATIONS FOR AUGER ANCHORS 1. BUILDING ANCHORS SHALL BE "MOBILE HOME" TYPE HP-1 SINGLE HELIX EYE AUGER ANCHOR BY HOME PRIDE OF BRISTOL. VA. OR EQUAL. AVERAGE HOLDING STRENGTH IS NOT LESS THAN 4,900 LBS. 2. ANCHORING SYSTEM TO GROUND PER LOCAL BUILDING CODE (BY DEALER). LOCATE ANCHORS PER TABLE 4A OR 48. 3. THREADED ROD WITH EYEBOLTS SHALL BE PLACED THRU THE BOTTOM PLATE (FLOOR SYSTEM) AND ATTACHED TO ANCHOR. THESE CAN BE EXTENDED WITH THREADED ROD (OR STRAPS WITH EQUAL OR GREATER STRENGTH) FOR ELEVATED PORTIONS OF SHEDS ON LEVELING BLOCKS. TABLE 4 30" AUGER ANCHOR SPACING - SINGLE WIDE SHED WIDTH LW UPUFT (PLF) END ANCHOR-- MAX. INTERIOR SPACING... 13'-8" 7.00 243 0'-e TO 3'-0• 10'-0' r -gin 10'-0" _- 5.00 174 0'-0" To S-ar 10'-0" 8'-0. 4.00 138 a-(r TO 3'-0' 10'-O' 6'-0. 3.00 104 U-T TO S-o' 10'-0" TABLE B 30" AUGER ANCHOR SPACING - DOUBLE WIDE SHED WIDTH LW' UPUFT (PLF) END ANCHOR -- MAX. INTERIOR SPACING... 20'-0' 10.00 1 400 1 O'-O' TO 3'-e 1 5'-0• • LOAD WIDTH OF UPLIFT ON RUNNER ^ LOCATION FROM END WALL OF AUGER ANCHOR ••• MNDMUM SPACING BETWEEN ANCHORS 1.AANCCHOR SPACING IS DESIGNED AS PER ASCE-7. (L.O [ 2. ALL MEASUREMENTS ARE CENTER -TO -CENTER. 3. THE MINIMUM NUMBER OF ANCHORS PER SHED IS (4). (1) ANCHOR PER EACH CORNER, ADDITIONAL INTERIOR ANCHORS ARE REQUIRED IF SPACING IS MORE THAN 10'-0' BETWEEN ANCHORS- 4. ANCHORS SHALL BE ON SIDE WAUS ROUT WHEN THE SH EXSIING BUILDING; IN WHICH ANCHORS CAN BE PLACED 0 Wu+n wl C TO THE SIDE AS POSSIBLE. � I n A % AA A 003")- BOCC IL l l z'.z• GALVANIZED As ZE W HER - `f 2-.2- GALVANIZED WASHER , 2' ITT WITH N / 1 n THREADED FOR ROD / OPTIONAL FOR 'NIGH ET' FI 0 P WLiH 1/2• tiUY THRREADED ROD OPDONA FOP •Nil. SET • EYES BOLTED TOGETHER WITH 1/2•.z' 1 N L1TG1 oR cau BOL9' THRU BOTTOM PLATE 1 BOLT & NUT WTRR (2)2'a2' GALVANIZED SHEAR CAPACITY) /2' COUPLER BOTTOM 2'ab' BOTTOM PLATE NAILED f /2' COUPLER L/2'x 12' FORGED EYE60CT - "S I WASHERS (2AOOLB . , MIN. a .. + ' . 7/WED (400 LBJ CONCRETE WEDGE P.T.ANCHORO INTO SLAB TN 2.4' P.T. BOTTOM PIATE TO 2'x6' P.T. BASE I MIN. • U47^1L/V11r �°------- EYES BOL F�._D TOGETHER WITH 1/2'z2' (SEE TABLE 1 FOR SPACING) (S "------- BOLT & NUT,RWITHA(2)27x jWLYANIZED WASHERS (2,LIWOOLB SHEAR GAPAGTY) ITRPE I. 11, Yi, OR.IV Pb WITH DLOCKINC &,I DIUIRED (SEE TABLE 3). d 7/2'x3' (400 HOfl CONCRETE WEDGE ANCHOR A-2{ CONCRETE SLAB By OTHERS THROUGH CUP LUP OR EQVAL LOCAL CODES AND JURISDICTION CONCRETE SUB BY OTHERS THROUGH LOCAL LODES AND JURISOICIION 30jFFARIH AUGER ANCHOR, (SEE TABLE 1 MR SPACING) (SEE TABLE 4 FORSSPAGNO) SHED WITH SKID SHED WITH SKID SAD WITH 'NO FLOOR' OPTION _ TOP_ADtORB�OCKMG ANCHORED TO CONCRETE ANCHORED TO CONCRETE TIE -DOWN DETAILS CODE VERSION 1 iBC rRi2017 eM �. A qj ACIURLR EDPDem SHEDS V-E BASK WIND SPEED Va•-Imnpn EXPOSURE O ENCLOSURE UInDSFD INTERNAL PR=;RE WBMCIENT ./- 0.1E IMPORTANCE FACTOR LIE ROOF DEAD LOAD I� ROOF LIVE LOAD Ems' m SomY FLOOR DEAD LOAD E3F FLOOR LIVE LOAD 3T6 TSPSF - 12+PSF W. YL' RATING OF WA= FLOOR, ROOF N/A MODULES PER BUILDING I HURRICANE PROTECTION USAGE NO HURRICANE SHELTER USAGE NO SQUARE FOOTAGE Lf55 TON no SORT. REVISIONS REV DESCRIPTIONDATE BY 1 2on FIK II/iz/IT WE PI Cn W (n LJ o_? 3 W J m D 0 Ld J C.0 Z (n I LU 0 D 0 ARE NOT PART OF THIS GOVERNED BY LOCAL 3. REFER TO TE-DOWN DETAILS FOR PROPER INSTALLATION REQUIREMENTS TO MEET CODE. p 2/5/20 MGttnaw:- .: Dlawln-xr,:e odQO�Y Liconse�(/64606 Sheet: AD-1 OF 1 2018-12-20 TOP LINE ENGINEERING APPROVAL PLAN #SS—B-180—C Side Wall Header Schedule (I80C) End Wall Header Schedule 180C Fasteners w/o sha .SS ALUUR{UM ROOF SHEATHING Builtlin WitlN Fasteners w/ strap Size(d) Max. Span NJro) p 9 (each entl)(c) S¢e Up to 14'Wide 1-2x4' 6� 0 4-3'x 0.131'nails-�----------_-----.-..-- �' •-0• MO.Max. Span MID){b) (each end) 2-2'za'(c) I BaT I Wdk 6-3'z O.131'rlails 14W" 61-U 0 3-3•x 0131' it a.Tabu"'""'as are for No. 2grede Spiuce-PlnnFir lumber. -I 1 m I n 0 1z RUNNERS 0 m w END W TRUSS 2'zC TRUSS 0 224" O.C. MAYL �-,F- F I nags b. W - Number af(ack studs required to support each end. 4k4' —Tabulated 8'-0" 1 6-3' z 0.131' nails a Tabulated M11ues are for No. 2 grade Spmce�Pine-Fir lumber c. Laid eat r - D. NJ - Number of'ack studs required to support d. No JsCK studs, but as studs laid Pat. ..;._ 1 PPort each end. c. Windrow header for wind w openings that have more than 50% combined stud wall above I F and below, otherwise use door header schedule. Ywrm 1. IWmIYN¢ d. See heatler details for attemate layouts, i.e. 2-2k4" or4"x4" P.T. z se: aUn1aS1 bCRDnIE Nn es:HUDD, saoeme AAFnnNV. R e. The header can be attached to the top plate and thus hate the combined strength a �� ro wmNs �OiE TM equivalent and use the maximum CODE INFORMATION span stated. com VERSION M m� M ous- �-'• WAu slues II I II I i I I 96AlMM I I l 1I I I I (2) 2W Wrid 1/Y 0.11YW0 j e al asl Nm as(1)l•LL• 1211Y W %W BEIM 1, tNtqq/LL Snds NNr n Sa1IRD MMa6ACmm1S�M�maamaevie `I... Mnx. HYDROVENT DETAIL SIDE WALL WINDOWS END WALLS WINDOWS & OP 10 A & DOORS DOOR 6' WIDE OR LESS ]1E• !s• 4"x4" W/2"x4" / at6 MANUFAD1Ur✓ER swEwan SNEaS auaolNG 1Y'PE wqXIMp1 SMui CONSIRUCTION TYPE w-0 FIRE PRUECTIGN NONE tW STIPRRESFON SYSTEM NONE DCCURANCY smnAc2 AILOWABLE NUMBIR OF sni 1 BASIC WIND SPEm t leas* D%PGSURE c ENDLosvl¢ EAOtaID WGINAL P Ssu E MUF OW r- D•1 oWANM FACTOR 1.15 ROOF DEAD LZAD 1� G,F,I. — + NOTES-OPDONAL ELCmIC RODF UnT U0kD amSF oR 3o0e PaNr lab OUTLET FLOOR DEAD LOAD 1oPg S -ALL WIRING SHALL M 14 GAGE 3-WIRE MC CABLE. +z�sOc N TT -ENCASE IN A11 AIEIAfAL BOXES. WilF.am ENeary, 111 ELWR LhE TDAn sTo. 'ems - 17ePs mr DESIGN PRESSURES OURCE L TT SMP-51, SMIJ9, ]CC 51850W 'I+' RATING WAus, FiDON, ROOF WA ROOF ROOF FRAMING PLAN PLAN WIRING DIAGRAM IW-9 OaEview Pointe Tel .m MODULES PER BUBDING f +27,8 -94.7 NJS/DOORS INDO S (OPTIONAL) GDE+a ncnda 39fl4 RUWOCINE PRUIECUON USAGE No +32.6/-28.2 I URi S OUMR UsE ND 2W mm w u. room M %mosw 40GWa Wrr SDUA1 FOOTAGE Tlv sail. OR ILss asaMwn� REVISIONS z1E azust wnr¢Y REV DESCRIFfON I DATE I BY Doi / ' / i M J11AANvM wAl1 / � / MIX" / WU." By.M7B v� Z 12/12/17 mo wul 0, swa RE FOR N A Crt adel SS-B-160C M 9E FlA2 y141E PU➢E sEan MAY. LIANCE � W D- F1am FPAIIMT W a Bruses."r®Ic'I°RFec PNwO' wNsmalnN u u 2J slaa eEmIREo m FAD PIAIE wm FIWI mNora /ma mYv' ' FP1P w/^-ta^ T STANDARD WALL DETAIL CIE COUNTY O U NTY wul. mama wraps J.+E W J Q g CODE f f oItlS2 i raFm ro rvE rLTAaS FOR PlePm NSTAllmtll mau ms c� 6-4' m 1Y-Y J FLOOR FFalalc WITH DOOR &WINDOW OPDONS ramaaxll sv1 ro aaoF Alm aMONUWS tdn PATIC Q E. Au sTlmx wJRRs, Tlosss, Eic JIS m /a sPR mar As NmFIl - J/! PLYI('.m E/4• 1Y�nTN�. N5, 9 L fE r0E1Ep 6WyMimL WWI Nar ILS U 6. SfMICaYaS RFIt 56 ri. FRL wYE NI 90• MWMYM ELEVATION CROSS-SECTION END ELEVATION Ew• P.T. ATnom FIR xxa W E0.NyyEErymr�� s¢ - P.T. R.YP000 - A/�• TGa Twv ado• NoMPur TIaCm65S W s c m a oaTauy pF-Fre ar onms Tlau 1mu. TYPICAL ARCH FRAME WITH DOOR Ja1G� aManY Mm - s/I• P.T. Tar d � ®�� uj Cn OFILE z NL "W" Rm DOORS To wm T19: WNM111 sPE[RYYAlIIN2 qp a art YEGL S1RVa aal E FM NtaAm smaanmAL lMl�fJs 0 ft.� M s u: RAZE naml malts Yvr. LI LJ I I u \J .ws e•-s ro 1s-0'-I �--�,.aFa a-0• Is Is -a• N E EVATION and rx11X m A O 1s-e• r-Iq• r-Aar r-ly' - 10'-0' m = I I i vuv t aOY Oo a mm azma ar m N' vm ea.nr Ea:v®wCw ms asp e � Y I i !P 31 as TW. lam I M Plnl 3/0 TT" RYa1 ♦11• P.T. Cfl ATr aXM .M K1sM'4 T 3 m,Quoy i i si� i I MF1Rfls: P� FD 55C Tl6" O 60.�5 Nor Nma� means T1E soup. \_)CENSe '•. 0��� LLJ :• STATE Q '''''�0 (� Matthew T, Baldwin P.E. Florida License #64608 E D L END ELEVATION Z WITHOUT DOOR WITH GARAGE DOOR F '�' SEE saawE FOR 9ff Ic'd-014 DIDIFAW FLOOR FRAMING PLAN m Sheet SSB-1 OF