Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutSubsoil Investigation Report/9 is-OY?a--
Subsoil Investigation Report
prepared by:
ting, Inc©
ent: Tannic Cox
gtact: Jordan Kane
dress: 123 Queen Frederika Court
Fort Pierce, FL 34949
jecr Proposed Residence and Pool
Press: 123 Queen,Frederika Court
Fort Pierce, FL 34949
e: Wednesday, February 6,2019
als Testing l InspectlAIII Environmental
am �
5r<I}
Phone: 954-784-2941
E-Fax: 954-784-7875
m
Table of Contents
Client Information
Project Information ----------------------------- -------------------------------------- ---pg. 1
General 'Soil Descriptions ------------------ -------------------- --------------------- pg. 1
Foundation Recommendations ------------- ---------------- — --- -- ------------- — ----- pg. 2
Excavations------------------------------- —---------- ----------------------------------- —Pg 3
Grading------------------- ------------ —------------ —-------------------- —----------------- -Pg. 3
Appendices----- --- -------------- ------------- -------- — --------- — ------------- -------- pg. 4
Soil Boring Log(s)
Laboratory Test(s)
Project Location
Soil Boring Location(s)
Soil Classifications
Sampling Procedures
Limitations of Liability
For Your Information
Our findings in this report are based on soil conditions encountered in the test bore locations only, proposed structure to
be built, (if available at this stage), Florida Building Code requirements and standard engineering practices. If your
report is preliminary (i.e. vacant land or building to be demolished) additional borings are required within the foot print
of the proposed structure once the location & layout of the proposed structure is known.
Please read this report in its entirety and follow all recommendations. Failure to do so may result in the permitting
agency (Building Department, etc.) withholding ,the Certificate of Occupancy. This will cause delays and additional
costs. The Permitting Agency will require a final certification or signing off of the project prior to issuing the Certificate
of Occupancy. All of our recommendations need to be followed to receive a final certification from F.E.T., including
densities on each lift, demucking verification, piling inspection, etc., whichever recommendation applies to your
project. "
Please schedule us at least 24 hours in advance for all tests and inspections. If you choose to use another Engineering
Firm, you must verify they will provide you with the proper certification in writing, as outlined in our report. Our firm
will only provide a certification letter if it has verified all work as recommended in our report.
3370 NERh Avonuc ,Oak Iand•Park.•Florid a.33334 ""-.+te€.„+.•
em-a
CMEC .-• OR
• �, ■T
©ederal
Ogngineering
esting, Inc.
Wednesday, February 6, 2019
Tammle Cox
123 Queen Frederika Court
Fort Pierce, FL 34949
Ann.: Jordan Kane
RE: Subsoil Investigation
Proposed Residence and Pool
123 Queen Frederika Court
Fort Pierce, FL 34949
Dear Sirs:
Phone: 954-784-2941
E-Fax: 954-784-7875
Job Order Number 19SB060
.com
Pursuant to your request, Federal Engineering & Testing, Inc. has completed a subsoil investigation on 02/04/2019 at the
above referenced site. The purpose of our investigation was to verify subsoil conditions relative to foundation
preparation and design.
A total of three (3) SPT borings were performed according to ASTM D-1586, one (1) drilled down to a depth of thirty
feet (30), one (1) drilled down to a depth of twenty-five feet (25), and one (1) drilled down to a depth of fifteen feet (15),
below the existing ground surface. (See attached field sketch for locations). The following is a general description of soil
stratas for the subject site:
pePO! Descnptron of Soils , !
From :' 'fo
0" 6" Topsoil & Vegetation
6" 3' Brown Sand
3' 6' Light Gray Sand with Shell
6' 11' Gray Silt with Traces of Organics
111 15' Gray Sand with Shell
15' 20' Bluish Gray Clay
20' 30' 113luish Gray Sand with Shell
Groundwater table elevation was measured immediately at the completion of each boring and was found at an average
depth of three (3) feet below existing ground surface. Fluctuation in water level should be anticipated due to seasonal
variations and run off as well as varying ground elevation, construction dewatering and pumping activities in the area.
Site contractor must familiarize himself with site conditions in the event groundwater controls and dewatering is needed.
Surface flooding may result under hurricane conditions and should be taken into consideration in the design of the
project. The contractor shall make sure that groundwater levels on adjacent properties are not affected by the contractors
dewatering activities. Specialty groundwater contractors shall be consulted for all work below the groundwater level.
The boring log(s) attached present a detailed description of the soils encountered at each location. The soil stratification
shown on the boring log(s) is based on the examination of the recovered soil samples and interpretation of the driller's
field log. It indicates only the approximate boundaries between soil types. The actual transitions between adjacent soil
types may be gradual.
Wednesday, February 6, 2019
123 Qoeen Frcderika Court
Fort Pierce, FL 34949
Page 2
ederal
ngineering
K esting, Inc.
Based on our understanding of the proposed structure and the information obtained from our field boring logs; it is
evident that deep foundation systems are needed to support the proposed new structure without detrimental settlement to
the structure.
Per the Florida Building Code FBC 2017, Chapter 18; deep foundation systems shall consist of one of the following
alternatives:
Alternatives ' '
Approximatte Depth
Driven
Size •
Allowable
Com ression Pile ;
=
Capacity 1n Tons
Allowable Tension
Prle t;apaclty m ,
•. Tpps
`
Allowable Lateral
Capacity: Tons
Pin Piles/ Push Piers
30' or Refusal
4 Inch
5 Tons
1 Ton
N/A
Helical Piles
30' or Refusal
3 Inch
12 Tons
6 Tons
N/A
Auger Cost Piles
30' BELS
12 Inch
25 Tons
12 Tons
I Ton
Auger Cast Piles
30' BELS
14 Inch
35 Tons
17 Tons
2 Tons
"BELS - Below Existing Land Surface's
Estimated Lateral Load for a Pile Top Deflection of '/4 inch. Proposed pile length based on the existing ground
elevations at the time of drilling. Pile length may vary depending on proposed grade beam elevations and inconsistent
soil profiles. In the case of pin, helical and precast piles a minimum of four (4) test piles shall be driven to determine
production pile length. All work shall be in accordance with the local Building Code and Coastal Zone Construction
Requirements (if required).
Helical pile bearing capacity is dependent on helix numbers, size and spacing. The foundation contractor will be able to
provide the most cost effective combination of helix designs. The above depths are the minimum depths required to
achieve design capacities. Predrilling might be required to achieve design depths.
All slabs and pool decks for the subject structure shall be designed as structural slabs spanning between supports and
designed by a Florida Registered Structural Engineer and placed under the supervision of a Geotechnical Engineer. All
work shall be conducted by an experienced Florida Licensed Specialty Piling Contractor. All piles shall be designed by
a professional engineer and shall be placed under the supervision of our Geotechnical Engineer to verify compliance
with our recommendations. If the pile is not reinforced over the entire length, we recommend a single #7 reinforcing
steel bar be placed the full length of the pile to verify pile continuity.
In case of existing structures in the vicinity of the pile driving operation, care shall be taken not to create excessive
vibration. Vibration levels shall be monitored to verify compliance with county regulations. Steps must be taken to
prevent excessive vibrations. In the event excessive vibrations are experienced during construction, alternative driving
methods shall be implemented (i.e.: predrilling, jetting, hydraulic push, etc...).
The minimum center to center spacing of piles or adjacent foundations shall be not less than twice the average diameter
for round piles or 1-3/4 times the diagonal dimensions of rectangular piles, but in no case less than 30 inches. The
installation of adjacent piles (located within 4 feet of each other) on the same working day is not recommended. We
recommend that adjacent piles not be installed until the initial grouted pile has set overnight.
The grout used in the pile installation shall develop a minimum compressive strength of 4000 PSI at 28 days.
2r I _
Wednesday, February 6, 2019
123Queen Frederika Court
Fort Pierce, FL 34949
Page 3
deral
efgIneer
�81�81 QQ��nglneering
eating, Inc,
Any underground structures such as grease traps, septic systems, etc. must be supported on pile foundations, unless the
deleterious material (i.e.: silt, muck; peat, ,etc ... ) is excavated in its entirety and replaced with compacted washed gravel
such as pea rock or #57 stone below the water table elevations and clean granular materials above the water table.
Excavations shall not extend within one (1) foot of the angle of repose next to existing footings or structures unless
underpinned. Trenching shall be in compliance with the Florida Building Code, OSHA and Trench Safety Act
requirements. Shorings shall be designed and inspected by a Florida licensed professional engineer.
Provisions shall be made by the architect, engineer of record and contractor to address differential settlements when
tying in new to existing structures. Mixing of different foundation types shall not be used unless provided with
expansion joints to address differential settlement.
All outside ground' surfaces must be sloped away from the structure to avoid water accumulation and ponding. All rain
waters shall be discharged away from all building foundations. Verify all water, sewer, plumbing, sprinkler and drainage
lines are properly functioning with no leaks in the vicinity of the foundation.
Regardless of the thoroughness of a geotechnical exploration, there is always the possibility that conditions may be
different from those of the test locations; therefore, Federal Engineering & Testing, Inc. does not guarantee any subsoil
condition between the bore test holes. A site plan showing the location of the proposed stricture was not provided at the
time the soil borings were performed. Once plans and specifications have been finalized and drawn, Federal Engineering
& Testing, Inc. shall be provided a copy of the finalized plans and specifications for review. For a more accurate
portrayal of subsurface conditions, the site contractor should perform test pits. If different conditions are encountered,
Federal Engineering 8c Testing Inc., shall be notified to review the findings and make any recommendations as needed.
In accepting this report the client understands that all data from the soil borings is intended for foundation analysis only
and is not to be used for excavating, backfilling or pricing estimates. The site contractor -must familiarize themselves
with the job site conditions.
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for performing an environmental analysis of the soil materials. For Environmental
due diligence, a Phase I and/or Phase lI Environmental Site Assessment is recommended.
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of
clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved
pending our written approval.
Federal Engineering & Testing, Inc. appreciates the opportunity to be of service to you at this phase of your project.
Please feel free to contact us i. Nyp,nlay be of further service to you..
Sincerely,
Keith LeBlanc, PZ ro 1 2,5� *
Federal Engineering;gTestiF ;'�
Florida Reg. No. 50. ; ZoRtoP.'"
Certificate of-Authorizat49L
AA ,
Wednesday, Fcbruary 6, 2019
123 Oueen Frederika Court
Fort Pierce, FL 34949
Page 4
Appendices
ederai
® ngineering
8 esting, Inc.
O ederai Phone: 954.784.2941
E-Fax: 954-784-7875
OQegineering www.fed-ong.com
www.fed-eng.cam
®vesting, Inc.
SPT Test Boring Report
Client: Tanunie Cox Date of Test: February 4, 2019
Project: Proposed Residence and Pool Hole No.: B-1
Address: 123 Queen Frederika Court Location: See Attached Drawing
Fort Pierce, FL 34949
Depth (FT)
Soil Descriptions
Hammer Blows
'IN"
1
0" - 8"
Topsoil & Vegetation
7
8
14
2
8" - 3'
Brown Sand
6
5
3
7 9 '
17
4
3' - 6
Light Brown Sand with Shell
8
9
5
10 8
17
6
9
8
7
2 1
3
8
6' - 13'
Gray Silt with Traces of Organics
2
3
9
10
2
10
2
2
11
A A
A
12
A
A
13
A A
A
14
13' - 16'
Gray Sand with Shell
A
A
15
7 9
17
16
8
10
17
A A
A
18
16- 21'
Bluish Gray Clay
A
A
19
A A
A
20
A
A
21
12 11
25
22
21' - 25'
Bluish Gray Sand with Shell
14
15
23
A A
A
24
A
A
25
A A
26
27
28
29
30
Water Level: 3'6"
Below Land Surface
A = Auger
Phone: 954-784.2941
E-Fax: 954-784-7875
.anganeeren�, admln@fed-ong.com
_ .. o www.fdd.eng.com
OOesp.ii �Binge c..
SPT Test Boring Report
Client: Tammie Cox
Project: Proposed Residence and Pool
Address: 123 Queen Frederika Court
Fort Pierce, FL 34949
Date of Test: February 4, 201.9
Hole No.: B-2
Location: See Attached Drawing
Depth (FT)
Sol] Descriptions
Hammer Blows
"N"
1
0" - 6"
Topsoil & Vegetation
7
9
17
2
6" - 3'
Brown Sand
8
9
3
8 7
16
4
3' - 6'
Light Gray Sand with Shell
_ 9
10
5
8 9
16
6
7
9
7
2 1
3
8
6' - 11'
Gray Silt with Traces of Organics
2
0
9
1 2
3
10
1
I
11
A A
A
12
1 V - 15'
Gray Sand with Shell
A
,A
13
A
A
A
14
A
A
15
10 12
20
16
15'-20'
BlulshGrayClay
8
8
17
A A
A
18
A
A
19
A A
A
20
A
A
21
14 15
31
22
16
15
23'
_ A A
A
24
20'— 30'
Bluish Gray Sand with Shell
A
A
25
A A
A
26
A
A
27
16 15
29
28
14
15
29
A A
A
30
I
A
A
Water Level: 3'8" Below Land Surface
A = Auger
Phone: 954-784 2941
E-Fax: 954-784.7875
®nghmeering admin@fed-eng.com
www.fed-ang.com
®DesUng, Inc
SPT Test Boring Report
Client: Taounie Cox
Project: Proposed Residence and Pool
Address: 123 Queen Frederika Court
Fort Pierce, FL 34949
Date of Test: February 4, 2019
Hole No.: B-3
Location: See Attacked Drawing
Depth (FT
Soil Descriptions
Hammer Blows
'IN"
0" - 6"
Topsoil & Vegetation
7
9
19
2,
6" - 3'6"
Brown Sand
10
9
3
8 9
19
4
3'6" - 6'
Light Gray Sand with Shell
10
8
S
11 7
16
6
9
8
7
2 1
1
6'- 12'
Gray Silt with Traces of Organics
1
2
9
1
10
1
1
11
A A
A
12
12'- 15'
Gray Sand with Shell
A
A13
A A
A
14
15
14 12
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Water Level: 3'8" Below LandSurfce
A = Auger
Oed@f ag Phone:954-784.2941
E-Fax: 954-784.7875
On9ineee'eng admin@fed-eng.com
www.fed ong.corn
®Oestarog; Once.
Report of Organic Content ASTM-D 2974
Date: Monday, February 4, 2019
Tammie Cox
123 Queen Frederika Court
Fort Pierce, FL34949
Attn.: Jordan Kane
RE: Geotechnical Services
Proposed Residence and Pool
123 Queen Frederika Court
Fort Pierce, FL 34949
Results of Test
Sampled by:
Sample Location:
Material Description:
Job Oider Nwnber
Reported To: Client
I s• t-lj e
4
- % Sample Looahon arld.Deptli-- «-.+
-
- - Orgatiic Content Percentage%» —µ- -
BI
6' -13'
39%
B2
6' - 1 l'
1.8%
B3
6' -12'
B4
N/A
N/A
B5.
N/A
N/A
Tested By: SJ
Checked By: KL
.e `: "„: 33701NE:51h Avenue I Oakland Park, Florida 33334w.
v
lhk • IAM ® T
:Ounh
© ������ Phone: 954-784-2941
E-Fax: 954.784-7875
eriginoeiring admin@fed-eng.com
www.fed-eng.com
No. 200 Wash Sieve Analysis
Date: Monday, February 4, 2019
Tammie Cox
123 Queen Frederika Court
Fort Pierce, FL 34949
Aun.: Jordan Kane
RE: Geotechnical Services
Proposed Residence and Pool
123 Queen Frederika Court
Fort Pierce, FL 34949
Results of Test
Sampled by: b
Sample Location: E
Material Description:
Starting Sieve Weight B-1;
Starting Sieve Weight B-2:
Job Order Number 19SBO60
Sample Date:
Sample Number: B-1 & B-2
Bonng,#,
Sreve Sieze
Cumulative Weight
Retained (g)
'.Comulatrve,o
Passing':
Gti mulattve.%" <i
Retained . ,
B-1
#200 (0.075 mm)
102.57
39.9%
60.1%
B-1
Pan
-
-
B-2
#200 (0.075 mm)
132.14
19.20/,
80.8%
B-2
Pan
Tested By: Si
Checked By: KL
3370 NE 5th Avenue I Oakland Park, -Florida 33334
CMEC • � �� • ®�
_, 4 comet
_r
';•ry X • i�.� u.•. '
ationae,
Sid.•. 4 T1N•w
Site Loc
//}Sage
Irf
v 2018 Google
c r
Site Loc
//}Sage
Irf
v 2018 Google
c r
C�
Client: Tammie Cox
Test: Subsoil Investigation
(site map is not to scale)
® ri
edereaal
Q ngineeng
& esting,Ine.
Soil Boring Location Map
3370 NE 511i
Project: Proposed Residence and Pool
Project Address: 123 Queen Frederika Court
Fort Pierce, FL 34949 t;Q
I
d ederal
©ngineering
Resting, Inc.
Soil Classifications
Correlation of Penetration Resistance with Relative Density and Consistency
Sands ..
Dynamic Cone Penetrometer
Penetrometer Resistance
Standard Penetration
Hannner Blows
Relative Density
0 -10
0-4
Very Loose
11 -25
5 - 10
Loose
26 - 45
11 - 20
Firm
45 - 75
21 -30
Very Finn
76 -120
31 - 50
Dense
>120
> 50
Very Dense
Dynamic Cone Penetrometer
Penetrometer Resistance
Standard Penetration
Flammer Blows
Relative Density
w
0-6
T,
0-2
Very Soft
7-15
3-5
Soft
16 - 30
6 -'10
Firm
31- 45
11
- 15
Stiff
46 - 90
16 - 30
Very Stiff
91 - 150
31 - 50
Hard
Rock Hardness`Descnption `
Soft
Rock core crumbles when handled
Medium
Can break core with your hands
Moderately
Hard
Thin edges of rock core can be broken with fingers
Hard
Thin edges of rock core cannot be broken with fingers
Very Hard
Rock core rings when struck with a hammer.,
Sand Quantity Modifiers, ,
Very Slight Trace
0 = 2 %
SlightTrace
2 - 5 %
Trace
Little Trace
10 -15 %
Some
15 - 30 % '
With
>30%
Silt =`Clay Qnantity
Moditiers
Slightly Silty/Clayey
0 5%
Silty /Clayey
5 - 30 %
Very Silty / Clayey
30 - 50 %
Particle Size
Boulder
> 12 in
Cobble
3 -12 in
Gravel _
4.76 mm - 3 in
Sand
0.074 mm - 4.76 mm
Silt
0.005 nun - 0.074 nan.
Clay
< 0.0.05 mm
A©ederal
© glneering
esting, Inc.
Drilling & Sampling Procedures
The soil borings were installed in accordance with Standard Penetration Tests procedures as set forth in ASTM D-1586.
Representative samples were collected utilizing spilt -barrel techniques in accordance with the procedures set forth in
"Penetration Tests and Spilt -Barrel Sampling of Soil in ASTM D-1586. The following field tests, measurements and
laboratory analysis were performed/collected during the installation of each soil boring.
Penetration Tests
During the sampling procedures, Standard Penetration Tests were performed at five (5) foot intervals to obtain the
standard penetration value (l) of the subsurface soil. The standard penetration value (N) is identified as the number of
blows of a 140-pound hammer falling thirty (30) inches, required to advance the spilt -barrel sampler one (1) foot into the
subsurface soil. The sampler was lower into the bottom of the previously cleaned drill hole and advanced by blows from
the hammer. The number of blows was recorded for each of the three (3) successive increments of six (6) inches
penetration. The "N" value is obtained by adding the second and third incremental numbers.
Water Level Measurements
Water Level depths were obtained during the test boring operations. In relatively pervious soils, such as sandy soils, the
indicated depths are usually reliable groundwater levels. Seasonal variations, tidal conditions, temperature, land -use and
recent rainfall conditions may influence the depths to groundwater levels.
Soil Properties / Classification
All samples collected were classified in accordance with the Unified Soil Classification System criteria to determined
soil material properties and compared with published literature of the USDA Soil Conservation Survey.
Ground Surface Elevations
Ground surface elevations have not been provided for the proposed boring locations. Therefore, all references to depth
of the various strata and materials encountered were from existing grade at the time of the drilling operations.
Limitations of Liability
Warranty
We warrant that the services performed by Federal Engineering and Testing,
Inc. (F.E.T.) are conducted in a manner consistent with the level of skill and
care ordinarily exercised by members of the profession currently practicing
under similar conditions. No other warranties, expressed or implied, are
made. While the services of F.E.T. are an integral and valuable part of the
design and construction process, we do not warrant, guarantee, or insure the
quality or completeness of services or satisfactory performance provided by
other members of the construction pmcess and/or the construction plans and
specifications which we have not prepared, nor the ultimate performance of
building site materials. As mutual protection to clients, the public and
ourselves, all reports are submitted as the confidential property of clients, and
authorization for publication of statements, conclusions or extracts from or
regarding our reports is reserved pending our written approval. Reports are
not intended for 3rd party use.
Subsurface Exploration
Subsurface exploration is normally accomplished by test borings. The soil
boring log includes sampling information, description of the materials
recovered, approximate depths of boundaries between soil and rock strata and
groundwater data. The log represents conditions specifically at the location
and time the boring was made. The boundaries between different soil strata
are indicated at specific depths; however, these depths are in fact approximate
and dependent upon the frequency of sampling. The transitions between soil
stratum are often gradual. Water level readings are made at the time the
boring was performed and can change with time, precipitation, canal levels,
local well drawdown, and other factors. Regardless of the thoroughness of a
Geotwhnical exploration there is always a possibility That conditions may be
different from those of the test locations; therefore F.E.T. does not guarantee
any subsoil condition surrounding the bore lest holes. For a more accurate
portrayal of subsurface conditions, the site contractor should perform tests
pits. If different conditions am encountered, F.E.T. shall be notified to review
the findings and make any recommendations as needed.
Laboratory and Field Tests
Tests are performed in accordance with specific ASTM Standards unless
otherwise indicated. All criteria included in a given ASTM Standard are not
always required and performed. Each test report indicates the measurements
and determinations actually made.
Ownership of Tests /Reports
All lest results and/or reports prepared by F.E.T. pursuant to this agreement
and/or Addendum(s) thereto, shall remain the property of F.E.T. until all
monies due and owing to F.E.T. under this Agreement and/or Addendum(s)
thereto, are paid in full.
Analysis and Recommendations
The Geotechnical report is prepared primarily to aid in the design of site work
and structural foundations. Although the information in the report is expected
to be sufficient for these purposes, it is not intended to determine the cost of
construction or to stand alone as construction specifications.
Anederal
gineering
elating, Inc.
Analysis and Recommendations cant
In accepting this report the client understands that all data from the will boring
is intended for foundation analysis only and is not to be used for excavating,
backfilling or pricing estimates. In accepting this report the client understands
that all data front the soil boring is intended for foundation analysis only and
is not to be used for excavating, backfilling or pricing estimates. The site
contractor must familiarize themselves with the job site conditions. Soil
boring(s) on unmarked vacant pmperty, or existing structure(s) to be
demolished is considered preliminary with further boring(s) to be performed
after proposed building pad is staked out. Report recommendations are based
primarily on data from lest borings made at the locations shown on the test
boring reports. Soil variations may exist between borings and may not
become evident until construction. If variations are then noted, F.E.T. must
be contacted so that field conditions can be examined and recommendations
revised if necessary. The Geotechnical report states our understanding as to
the location, dimensions, and structural features proposed of the site. Any
significant changes in the nature, design, or location of the site improvements
must be communicated to F.E.T. so that the Geotechnical analysis,
conclusions, and recommendations can be appropriately adjusted.
Construction Observations
Construction observation and testing is an important element of Geotechnical
services: The Geotechnical Engineer's Field Representative (Field Rep.) is the
'.owner's representative' observing the work of the contractor, performing
tests, and reporting data from such tests and observations. The Geotechnical
Engineer's Field Representative does not direct the contractor's construction
means, methods, operations, or personnel. The Field Rep. does not interfere
with the relationship between the owner and the contractor, and except as an
observer, does not become a substitute owner on site. The Field Rep. is only
collecting data for our Engineer to review. The Field Rep. is responsible for
his/her safety only, but has no responsibility for the safety of other personnel
and/or the general public at the site. If the Field Rep. does not feel that the
site is offering a safe environment for him/her, the Field Rep. will stop his/her
observation/ testing until he/she deems llte site is safe. The Field Rep. is an
important member of a team whose responsibility is to observe the test and
work being done and report to the client whether that work is being carried
out in general conformance with the plans and specifications.
Limitations of Report
Federal Engineering & Testing, Inc. shall have an liability, in contract, tort or
otherwise, for any inaccuracy, defect, or omission in interpreting this report
and shall not in any event have any liability for lost profits or any other
indirect, special, incidental, consequential, exemplary or punitive damages. In
the event of future conflict between owners and contractors the following
applies: F.E.T.(s) legal and/or company representation and preparation for
representation fees will be billed on an hourly rate, i.e. deposition, expert
witness, etc. F.E.T. has no obligation to amend its conclusions or
recommendations after the date of this report. Any alterations or changes in
the location of the project should be brought to our attention at the earliest
convenience for review and applicability of this report.
©edera8 Phone: 064.784.2041
E-Fax:',954-7847875
Ag
g, ineee�eng admin@fed-eng.com
www.fe`d-ong.com
estin Inc.
Partial List of Services
Geotechnical Enaineerina Services
Soil I Aggregate Tests
Field Inspection Services
Asphalt Services
Soil Borings
Fill & Quality Control Inspections
Backscatter Density Tests
Density Compaction Tests
Demucking Inspections
Extractions & Gradations
Grain Size Analysis
Building Inspections
Marshall Limits
Moisture Contents
Pile Driving Inspections
Bulk Specific Gravity
Soil,Classfications
Pile Load Tests
Cores for Thickness Determination
Limerock Bearing Ratios
$feel Inspection
Asphalt Pavement Monitoring
Florida Bearing Values
Threshold Inspection
Asphalt Assessment
Specific Gravity
Bolt inspection
Carbonate Analysis
Weld Inspection
Concrete Tests
Hydraulic Conductivity
Vibration.Monitoring
Concrete Strength Testing
Organic Contents
Slump Tests
L.A. Abrasion
Geotechnical Engineering
Windsor Probe Testing
Schmidt Hammer Testin
FOOT Inspections
QC Management
Foundaton Engineering
Foundation Design & Recommendation
. 9
Core Testing
Earthwork Inspections
p
Subsoil Investigation
Pile Load Calculations
AtrConlent
Concrete Unit Weight
QC Concrete Inspections
QC Asphalt Inspections
Piling Installation Monitoring
Flexual Strength Testing
Environmental Engineering Services
Phase I Site Assessments
Phase II Site Assessments
Lead Base Paint Surveys
Site Inspections
Phase I Follow up on Contaminated Sites
Report and Analysis
Research of Properly Records
Installation of Monitoring Wells
Air Monitoring
SoifBorings
Soil and. GroundWaterAnalysis
Roof Testing & Inspection Services
TAS 105 Field Fastener Withdraw_ al Test
TAS 106 Tile Uplift Test
TAS 124 Bell Chamber I Bonded Pull Test
TAS 126 Moisture Survey
Windload Calculation
Drainage Calculations
Lightweight Concrete placement Inspection
Roof Assessment / Evaluation
Cap Sheet Inspection
Fastener Spacing Inspection.
711e1 Shingle/ Standing Seam Inspection
Base Sheet Instellation Inspection