Loading...
HomeMy WebLinkAboutCompaction testI-WdgWrtel Fs 11345 U.S. Highway 1 • Sebastian, FL. 329580 • Orlando 723 Progress Way Sanford, F10327710 DATE TESTED: PERMIT #: • CONTRACTO • JOB LOCATIOP T.Or L%I 49NME •ZZ Z ANDjESTING • SOIL COMPACTION REPORT* ASTM D 1557 and ASTM D 6938 July 17�, 2020 2003 0674 Wynne Development 2 ae a Ri rfront ai ing MPO Box 78-1377 stian, FL. 32978 hone: 772-589-0712 - C.A.# 5693 •KSMengineering.net KSM JOB #: NUC # uc Model: N• Serials. 203281-1d I CH/'o 417 3500% 1117 ITEM TESTED: SLu' e Florida Compacted Foundation Fill* TEST LOCATION *OF DEPTH PEN 0 DRY • 0 - 9MAX. DRY • PERCENT SAMPLE READ DENSITY PROCTOR VALUE (P.C.F) COMPACTION 1. S.E. 0" - 12" • • 47 109.10 111.7 097.7%• - • 2. S.W. "* 43 108.4 110 • 97.0% 3. Center 45 108.6 97.2% 197.3% • 4. N.E. • 45 108.7 " 405. N.WO 47 109.2 if 097.8% • ? De cr'�"1'io'PI: • B� Sad • In Place Moisture: 10.8 Proctor 0ptimum 0 sture: 12.0% Proctor Max. Dry Density: P.C.F. 111.7 TTest Locations t e Density • Penetrometer readings indicate t e • Degree of Co paction Meets Minimum Requirement • for Staked Foundation �Res ectfully Submitt z4 �iiil ,�•, Dry Weight •• Q,vc6 • • Disclaimer: Contractor is responsible to maintain thEWested area in the conditioWhat KSM completed the indicated passed compaction test. pATOF : W KSM is not responsible if the tested area has been 414OR1104-•����� fJJW d n d co . p" Iwo- 1, SOON A%- \\O,. • r Bryan E'ld�h1lkk�,%KE. V.P. of Engineering • PE # 8143 7/20/2020 *Email to: St Lucie Building Department 0 Proudly Serving Florida since 199FO