HomeMy WebLinkAboutBuilding PermitCode Compliance Division
2300 Virginia Avenue
Ft. Pierce, FL 34982
Phone: (772) 462-1553 Fax: (772) 462-1148
httpJ/stiucleco.gov/ce
Issued: 02/27/2007
Conf #: 760
"- ff AI RTMU 411lTi «
Permit #: SLC- 0702-0460
Job Location: 9901 RANGELINE RD City: PORT ST LUCIE
Permit Type: Electrical
Job Description: 277-480 VOLTAGE OVERHEAD SERVICE DONE BY OTHERS.
Subdiv:
Lot:
Block:
Parcel: 4201-134-0003-010/5
Page 1
Contractor PANKRAZ JOHN A ELITE ELECTRIC INC (772) 340-3797
1691 SW SOUTH MACEDO BLVD PORT ST LUCIE, FL 34984
Property Owner WCA OF ST. LUCIE, LLC ( )
ONE RIVERWAY #1400
Setbacks Left:
Number of Units: 1.00
Minimum Floor Elevation:
Job Value: $1,899.00
HOUSTON, TX 77056
Right: Front: Rear: Zoning: IH
Floors: 1 Buildings: 1 Square Footage: 0.00
Flood Map: 400 Flood Zone: X Elev:
Permit holder acknowledges through acceptance of this permit that separate permits must be obtained as required by the Florida Building Code
Including those for all electric, plumbing, mechanical, roofing, and structural work. Further, he/she acknowledges responsibility to comply with all
requirements of the 2004 Florida Building Code.
NOTICE: In addition to the requirements in this permit, there may be additional restrictions applicable to this property that may be found in the
records of this County, and there may be additional permits required from other goJemmental entities such as water management districts, stale
agencies, orfederal agencies. s:553.79(10), F.S.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR
BUILDING IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. s.713.135, F.S.
Raymond Wazriy
Building Official
Date
For Automated Inspections, Call (772) 462-1261
For Questions, Call (772) 462-2172
St. Lucie County Land Development Code Section 11.05.01 (A) (2) states; Building Permits shall expire and
become null and void if work authorized by such Building Permit is not commenced, having called for and
received a satisfactory inspection, within six (6) months from the date of issuance of the permit, or if the
work is not completed within 18 months (permit by contractor) or 24 months (permit by owner) from the date
of issuance of the Building Permit. . I