Loading...
HomeMy WebLinkAboutBuilding PermitCode Compliance Division 2300 Virginia Avenue Ft. Pierce, FL 34982 Phone: (772) 462-1553 Fax: (772) 462-1148 httpJ/stiucleco.gov/ce Issued: 02/27/2007 Conf #: 760 "- ff AI RTMU 411lTi « Permit #: SLC- 0702-0460 Job Location: 9901 RANGELINE RD City: PORT ST LUCIE Permit Type: Electrical Job Description: 277-480 VOLTAGE OVERHEAD SERVICE DONE BY OTHERS. Subdiv: Lot: Block: Parcel: 4201-134-0003-010/5 Page 1 Contractor PANKRAZ JOHN A ELITE ELECTRIC INC (772) 340-3797 1691 SW SOUTH MACEDO BLVD PORT ST LUCIE, FL 34984 Property Owner WCA OF ST. LUCIE, LLC ( ) ONE RIVERWAY #1400 Setbacks Left: Number of Units: 1.00 Minimum Floor Elevation: Job Value: $1,899.00 HOUSTON, TX 77056 Right: Front: Rear: Zoning: IH Floors: 1 Buildings: 1 Square Footage: 0.00 Flood Map: 400 Flood Zone: X Elev: Permit holder acknowledges through acceptance of this permit that separate permits must be obtained as required by the Florida Building Code Including those for all electric, plumbing, mechanical, roofing, and structural work. Further, he/she acknowledges responsibility to comply with all requirements of the 2004 Florida Building Code. NOTICE: In addition to the requirements in this permit, there may be additional restrictions applicable to this property that may be found in the records of this County, and there may be additional permits required from other goJemmental entities such as water management districts, stale agencies, orfederal agencies. s:553.79(10), F.S. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR BUILDING IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. s.713.135, F.S. Raymond Wazriy Building Official Date For Automated Inspections, Call (772) 462-1261 For Questions, Call (772) 462-2172 St. Lucie County Land Development Code Section 11.05.01 (A) (2) states; Building Permits shall expire and become null and void if work authorized by such Building Permit is not commenced, having called for and received a satisfactory inspection, within six (6) months from the date of issuance of the permit, or if the work is not completed within 18 months (permit by contractor) or 24 months (permit by owner) from the date of issuance of the Building Permit. . I