To the St. Lucie County Planning & Zoning Members:
After an onsite meeting with Kori Benson, and Grant Chambers, on Friday, July 10th to review the concerns that the County had with
the original permit application; the HOA decided to move forward with the project in a 2 phase approach.
The first phase that is reflected on the revised building permit form, reflects the use of a virtual guard system only. The arm barrier
gates, and the concrete pad are eliminated from this phase.
The second phase which will require a site plan modification, will be submitted at a future date; and will include the arm barrier gates,
and concrete pad. This phase is NOT being addressed at this time. However, because phase 2 will require additional electrical
conduit, we are including all the necessary underground mechanicals to be included in phase 1 of this project. Being proactive and
planning for the future to include the required electrical now, eliminates the need to remove and replace pavers when we begin the
phase 2 project.
The electrical plan that was submitted in the original building permit application remains the same; with NO modifications.
As President of the Board, I am asking for your approval for us to move forward with the Phase 1 component of this security project.
Please see attached drawings that have been revised, to eliminate the arm barrier gates.
I look forward to hearing from you soon.
Kindly submitted on behalf of the Diamond Sands Board,
Kimberly Warth