HomeMy WebLinkAboutFloor PlanNotes:
1. Remove all
flooring throughout
unit
2. Remove existing
kneewall in Bath 2
3.Provide and install
new island where
passthrough was
removed
4.Cover and protect
all building chases
and exhaust
5.Protect all
structural walls and
elements
6.AII equipment to
be kept in unit
7.All cutting to be
done in unit or
service parking area
8.Adhere to all
Admiral Association
rules
9.Parking and
unloading on in
service area
10.Contractor to
protect other units
and all common
areas from
construction debris
and dust.
11.Contractor to use
protective pad in
elevator for all
deliveries.
12.Contractor to
remove all debris
from premises each
day.
13.Contractor will
not use any of
Admiral's property,
le.grocery of
luggage carts
14.Contractor to
provide all workers
with face masks,
gloves and hand
sanitizer.
,1[11106,6
Width 8'
New flooring throughout using
Meg 90 sound proofing
Rernov6 all walls
frqm dining room to
foyer - protect and
maintain all building,
structural.elements,
MEP chases and
lines
Master Bath
Gallup
Width 8'
Pwdr./
Bath 2
•• PUU 1.1
Dining Room
Lobby
Remove
passthrough and
open into dining
room for new
island
Remove existing
soffit in kitchen
ceiling
Close in laundry and AC
closet doors, remove the
wall between laundry and
AC closet. Remove
existing closet and install
new door way to
enlarged Laundry/AC
Remove kneewall
for full length
shower glass
8750 S. Ocean Drive Unit #833 Jensen Beach, FL 34957
Luxury Renovations & Additions - CGC1523559 (2740 SW Martin Downs Blvd Palm City, FL 34990
Contact: Derrick Dukes @561-719-9709
Per FBC 2017