Loading...
HomeMy WebLinkAboutFloor PlanNotes: 1. Remove all flooring throughout unit 2. Remove existing kneewall in Bath 2 3.Provide and install new island where passthrough was removed 4.Cover and protect all building chases and exhaust 5.Protect all structural walls and elements 6.AII equipment to be kept in unit 7.All cutting to be done in unit or service parking area 8.Adhere to all Admiral Association rules 9.Parking and unloading on in service area 10.Contractor to protect other units and all common areas from construction debris and dust. 11.Contractor to use protective pad in elevator for all deliveries. 12.Contractor to remove all debris from premises each day. 13.Contractor will not use any of Admiral's property, le.grocery of luggage carts 14.Contractor to provide all workers with face masks, gloves and hand sanitizer. ,1[11106,6 Width 8' New flooring throughout using Meg 90 sound proofing Rernov6 all walls frqm dining room to foyer - protect and maintain all building, structural.elements, MEP chases and lines Master Bath Gallup Width 8' Pwdr./ Bath 2 •• PUU 1.1 Dining Room Lobby Remove passthrough and open into dining room for new island Remove existing soffit in kitchen ceiling Close in laundry and AC closet doors, remove the wall between laundry and AC closet. Remove existing closet and install new door way to enlarged Laundry/AC Remove kneewall for full length shower glass 8750 S. Ocean Drive Unit #833 Jensen Beach, FL 34957 Luxury Renovations & Additions - CGC1523559 (2740 SW Martin Downs Blvd Palm City, FL 34990 Contact: Derrick Dukes @561-719-9709 Per FBC 2017