Loading...
HomeMy WebLinkAboutCompact testHeadquarters 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando 723 Progress Way Sanford, FL. 32771 DATE TESTED: PERMIT #: CONTRACTOR: JOB LOCATION: 'P Cam.— IL S ENGINEERING �11i7AVL AND TESTING SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 6938 July 22, 2020 2005-0215 D & M Concrete 9410 Carlton Road Ft. Pierce, Florida Mailing PO Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A.# 5693 KSMengineering.net KSM JOB #: 203390-1d/SH/ct NUC # 528 Nuc Model: MC-10R-P Nuc Serial #: MD049528 ITEM TESTED: Addition TEST LOCATION PEN DRY MAX. DRY PERCENT OF SAMPLE DEPTH READ DENSITY PROCTOR VALUE (P.C.F) COMPACTION 1. N.E. 0" - 12" 39 108.1 110.9 97.5% 2. N.W. 39 107.8 97.2% 3. S.W. 38 107.1 96.6% 4. South 40 108.6 97.9% Soil Description: 112.0 Yellowish Brown Sand W E j I I I I I I " In Place Moisture: 111.0 4—"•—. I— — I — —I — I — I — I I I I 98% H I I I I I I T Proctor Optimum Moisture: 110.0 1-- — �— — — —I — — • 1 • — 12.0% P I I I I Proctor Max. Dry Density: P.C.F. C 110.9 109.0—.1.—..-4.—..�.. �..—... F I I I I I @ Test Locations the Density & I I I I Penetrometer readings indicate the 108.0 I — — — j — —f'— —j — t — Degree of Compaction Meets D I Minimum Requirement Y I I I I I for Staked Foundation 107.0 — ;— — ; — —� —""—• T — , RespOW111VS(lbipitted: 9 10 11 12 13 14 15 • �.NGEN&, i Moisture - % of Dry Weight Disclaimer: Contractor is responsible to maintain y.J1E3 the tested area in the condition that KSM ;' '. gE 'U= completed the indicated passed compaction test. •RWP•. m\ KSM is not responsible if the tested area has been �, ' • rl. �� altered from the approved inspected condition. Bryan E. Dahlke, P.E. V.P. of Engineering PE # 81439 7/23/2020 Proudly Serving Florida since 1990