DIVISION OF ENGINEERING
MEMORANDUM
98-148
ZI
To: Martha Schurmann, Building Division
From: David Hays, Engineeri�
Date: April 6, 1998 L ��
Subject: C.A.T. Recycling
As -Built Acceptancjk
Building Permit # 47 osa C1550
Engineering has reviewed the paving and drainage as-builts for this project and are
excepting them for completion at this time. A copy of the Engineer's certification is
attached for your records.
If I can be of further assistance to you in this or any other matter, please let me know.
cc: Rawlins Collerain, Public Works Director
Donald West, County Engineer
Brian Barnes, Capital Projects Engineer
Edwin Arnold, Code Compliance Manager
Billy Hatcher, Community Development
r
s __7
lmhl
CIRCLE ENGINEERING INC.
Civil and Environmental Consulting, Engineering Support,
Site Improvement Management
April 2, 1998
St, Lucie County Engineering and Public Works Department
St. Lucie County Planning, Zoning and Building Department
St. Lucie, Florida
C.A.T. Recycling
St. Lucie Materials Reycling Facility
Site Development
Ladies and Gentlemen:
F'.V. bOX ouoZu
Palm Beach Gardens, FL 33420
(561)624-9539
EAPR31998 U
ENGINEERING
Personnel from Circle Engineering, Inc. have previously reviewed the subject facility's
constructed conditions at the request of Mr. Kerry McNamara of C.A.T. Recycling. The
visual review and comparison of the overall site area improvements, as identified on the
original design documents, reveals that the respective areas have been constructed in
substantial compliance with the design intentions as reflected within the approved design
documents as prepared by the firm of Lindahl, Browning, Ferrari & Hellstrom, Inc.
Please note that there were three (3) minor variations which are as outlined on the
attached signed and sealed Florida Department of Environmental Protection Substantial
Compliance Certification Form. In our opinion, the Item No. 1 and 2 minor variations as
outlined, have enhanced the frontage of the facilty by allowing for the preservation of the
respective cluster of pine trees thus resulting in a natural vegetative frontage area buffer.
In addition, the Item No. 3 variation was required to support the controlled discharge of
stormwater from the overall Site as intended by the design documents.
Please note that no destructive testing or construction phase observation of the below
grade conditions for this Project were performed by Circle Engineering, Inc. As such,
this substantial compliance certification is based upon and relative to the finished
conditions and the comparison of said conditions to the "Record Drawing" data and the
original design document intentions.
If you have any questions or require any additional information, please do not hesitate to
contact this office. Best regards.
Sincerely,
CIRCLE ENGINEERING, INC.
Eduardo E. Balbis, CFEA
President
Sincerely,
CIRCLE ENGINEERING, INC.
Gary R. Shea, P.E.
Vice President
Certificate No. 42079
Attachment: Signed and Sealed FDEP Substantial Compliance Certification Form
C. Mr. Kerry McNamara, C.A.T. Recycling
File (CAT.SLI)