HomeMy WebLinkAboutREVISION, MRO HANGAR Floor Trench Drain REVISION plan, 7.24.20
Treasure Coast International Airport
3000 Curtis King Boulevard
Fort Pierce, FL 34946
0BARC ENGINEER’S SUPPLEMENTAL INSTRUCTIONS
Project No: 2017.0259.01 ESI No: 06
Owner: St. Lucie County
2300 Virginia Avenue
Fort Pierce, FL 34982-5652
Date of Issuance August 12, 2019
Contractor: Ahrens Companies
1461 Kinetic Road
Lake Park, FL 33403-1911
Engineer: AVCON, Inc.
5555 E. Michigan Street
Orlando, FL 32822
Contract for: Maintenance, Repair, and Overhaul (MRO) Hangar with Associated Office/Shop Spaces
The Work shall be carried out in accordance with the following supplemental instructions issued in
accordance with the Contract Documents without change in Contract Sum or Contract Time. Proceeding
with the Work in accordance with these instructions indicates your acknowledgement that there will be no
change in the Contract Sum or Contract Time.
Description: Drawings C9.0.2 and C15.0.3 are being reissued to clarify details referring to the Hangar
Floor Trench Drain and Hangar Floor Slab Joint Dowels.
Issued by: Robert H. Palm, P.E. Date: 8-12-19
Accepted by: Date:
Treasure Coast International Airport
3000 Curtis King Boulevard
Fort Pierce, FL 34946
0BARC ENGINEER’S SUPPLEMENTAL INSTRUCTIONS
Project No: 2017.0259.01 ESI No: 06
Owner: St. Lucie County
2300 Virginia Avenue
Fort Pierce, FL 34982-5652
Date of Issuance August 12, 2019
Contractor: Ahrens Companies
1461 Kinetic Road
Lake Park, FL 33403-1911
Engineer: AVCON, Inc.
5555 E. Michigan Street
Orlando, FL 32822
Contract for: Maintenance, Repair, and Overhaul (MRO) Hangar with Associated Office/Shop Spaces
The Work shall be carried out in accordance with the following supplemental instructions issued in
accordance with the Contract Documents without change in Contract Sum or Contract Time. Proceeding
with the Work in accordance with these instructions indicates your acknowledgement that there will be no
change in the Contract Sum or Contract Time.
Description: Drawings C9.0.2 and C15.0.3 are being reissued to clarify details referring to the Hangar
Floor Trench Drain and Hangar Floor Slab Joint Dowels.
Issued by: Robert H. Palm, P.E. Date: 8-12-19
Accepted by: Date: