Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutContract T-Mobile Contract/Values
Crown Castle Site Name:
6420 Congress Ave.#2000
Boca Raton,FL 33487 Site Address:
Conirador, Olin Wayne Companies,Inc.
-Matt. Daniel Ault
Pbone Number: 239-776 5884
Contractor Contact Name: Daniel Ault
Acceptance of Scope of\York:
Omer. T i /Cr«n Caste Contact Name: Derek Smith
Acce tanceof Scope of Work:
Bid Due Date&Time: Notes:
Quote Replace/add antennas and upgrade equipment per plans
Materials Labor Total
Ground Work Total 50.00 } S0.00 50.00"
Tower/Roof Work Total $0.00 $0.00 S0.00
Miscellaneous
r r
Ground Work
A.Site Work-Demolltion,Cleating,Excavation. $0.00
B.Access Road
$0.00
C.Building Moddications $0
.00
D.Grounding'&-Test $0:00
E.Power and Tetco, conduit and conductor installation 50.00
F.Concrete Pad-Forms,Rebar,Concrete $0.00
G.Steel Platforms, Structural Steel,and Foundations $0.00
H.Gas Une&Test $0.00
1.Fabric and Gravel $0.00
J.Fence and Gates
$0.00
K.Landscaping,Including Uri ation if needed $0.00
L.Equipment Installation $4,500.00 53,000.00 $7,500.00
M.Mounts&Antenna Installation $1.500.00 $1000.00 $2,500.00
N.Permits&Ins ons So.00
Electrical
U.Powerconduithdrin $0.00
V. Coax/FiberCables ndudeslnstallatidnofwave uide $1,000.00 $1000.00 $2000.00
' $0.00
Miscellaneous $0.00
$o.00
1.Pick-up and delivery. $0.00
2.Fuel $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
iferf rcglion
Of'otal $7,000.00 55,000.00 $12,000.00
Completion Schedule(calen ar days): 17
I.