Loading...
HomeMy WebLinkAboutStructural Analysis ReportDate: July 23, 2019 William Barrett Crown Castle 8000 Avalon Blvd Alpharetta, GA 30009 Subject: Carrier Designation: Crown Castle Designation: Engineering Firm Designation: Site Data: Dear William Barrett, FEB 10 ?V0 ST. Lucie County, Structural Opinion Letter T-Mobile Co -Locate Carrier Site Number: Carrier Site Name: i GPD GROUP, 520 South Main Street Akron, OH 44311 (216)927-8663 A2P0105A PJD/Fox Site Crown Castle BIJ Number: 5800245 Crown Castle Site Name: Fox Crown Castle JDE Job Number: 577526 Crown Castle Work Order Number: 1769248 Crown Castle Application Number: 495193 Rev. 0 INC- 30920 GPD Group Project Number: 2019777.5800245.02 6041 St. Lucie Blvd., Fort Pierce, St. Lucie County, FL 34996 Latitude 27° 28' 54.17", Longitude -80° 22' 32.68" 134 Foot —Sabre Monopole Tower: - We are pleased to submit this "Structural Analysis Report" to determine the structural integrity of the above mentioned tower. The, purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we have determined the tower stress level for the structure and foundation, under the following load case, to be: LC5: Proposed Equipment Configuration Sufficient Capacity This analysis utilizes an ultimate 3-second gust wind speed of 158 mph as required by the 2017 Florida Building Code, 611 Edition. Applicable Standard references and design, criteria are, listed in Section 2 -Analysis Criteria. Structural analysis prepared by: Laleh Jamshidifar Respectfully submitted by: \\\\1111H///CHRISTOPHER J. SCHEKS IER LICENSE No. 78737 cENg F'•.'S��� �I�� No , SE����ii��iS�. ,•� N FRONT ChristopherJ. Scheks, P.E.` -01 ; a $IDES Florida # 78737 13 % STATE OF 40 O CNR SID cCOR10P:''G\�\��\ 7/23/2019 REAR�— IZN,.;7rT 1. FILE COPY 520 Soutii Main Street. Suite 2531 . Akron, Ohio 44311 . 330-572-2100 . Fax 330-572.2101 . w .GPDGroup.com GPD Group, Inc. - 30920 134 Ft Monopole Tower Structural Analysis July 23, 2019 CCI BU No 5800245 Project Number 2019777.5800245.02, Application 495193, Revision 0 Page 2 TABLE OF CONTENTS 1) INTRODUCTION 2) ANALYSIS CRITERIA Table 1 — Proposed Equipment Configuration Table 2 — Other Considered Equipment 3) ANALYSIS PROCEDURE Table 3 — Documents Provided 3.1) Analysis Method 3.2) Assumptions 4) ANALYSIS RESULTS Table 4 — Section Capacity (Summary) Table 5 — Tower Component Stresses vs. Capacity — LC5 4.1) Recommendations 5) DISCLAIMER OF WARANTIES 6) APPENDIX A tnxTower Output 7) APPENDIX B Base Level Drawing 8) APPENDIX C Additional Calculations tnxTower Report - version 8.0.5.0 134 Ft Monopole Tower Structural Analysis Project Number 2019777.5800245.02, Application 495193, Revision 0 1) INTRODUCTION July 23, 2019 CC/ BU No 5800245 Page 3 The existing 134 foot monopole has 18 sides and consists of three major sections connected by slip joints. The shaft is evenly tapered from 16" (flat to flat) at the top to 56.84" (flat to flat) at the base. The structure is galvanized and has no tower lighting. This tower is designed by Sabre Towers and Poles in January of 2010. The tower was originally designed for a wind speed of 140 mph per TIA/EIA-222-G. 2) ANALYSIS CRITERIA TIA-222 Revision: TIA-222-H Risk Category: II Wind Speed: 158 mph Exposure Category: C Topographic Factor: 1 Service Wind Speed: 60 mph Table 1 -Proposed Equipment Configuration nting Center Line i Number!;Antenna Number Feed FLevel (ft)" Elevation r °f Manufacturer Antenna Model oflFeed Line Antennas £ Lines Size (in); 3 Cellmax Technologies CMA-BDHH/6520/EO-8 3 Nokia FRIG 1 Raycap SSU9338TYP01 120.0 123.0 1 1-1/4 3 Commscope FFHH-65C-R3 12 1-5/8 3 Nokia AHLOA 3 Commscope TMAT1921B78-21A 1 Site Pro 1 HRK 14-U 120.0 1 Site Pro 1 RMQP - NP Table 2 — Other Considered Equipment Mounting,Line Level ft ( )`; Center ` Elevation (ft) Nu her MO Antennas Antenna Manufacturer Antenna Model Number of Feed Lines ' Feed line Size (in)' 6 Kathrein ,80010122 3 Kathrein 80010764 3 Ericsson RRUS 11 132.0 133.0 I 1 2 3 I 3/8 I 315 5/ 516 6 Ericsson RRUS 11 B12 6 Ericsson RRUS 11 B2 3 Andrew CBC819-DF 6 Andrew ETB19G8-12UB 1 Raycap DC6-48-60-18-8F 132.0 1 Platform Mount [LP 303-1] tnxTower Report - version 8.0.5.0 134 Ft Monopole Tower Structural Analysis July 23, 2019 CCI BU No 5800245 Project Number 2019777.5800245.02, Application 495193, Revision 0 Page 4 3) ANALYSIS PROCEDURE Table 3 - Documents Provided Document I 'Remarks Reference Source Geotechnical Universal Engineering Sciences Project #: Report 1930.1000003.0000: 2609348 CCISITES Dated 2/12/2010 Foundation UESProject#:0330.1000003.0000, Drawings Dated 2/10/2010 2604744 CCISITES Tower Sabre Towers & Poles Job #: 09-10100, Drawings Dated 1/18/2010 2604731 CCISITES 11i) Analysis method tnxTower (version 8.0.5.0), a commercially available analysis software package, was used to create a three-dimensional model of the tower and calculate member stresses for various loading cases. Selected output from the analysis is included in Appendix A. 3.2) Assumptions 1) Tower and structures were built and maintained in accordance with the manufacturer's specifications. 2) The configuration of antennas, transmission cables, mounts and other appurtenances are as specified in Tables 1 and 2 and the referenced drawings. This analysis may be affected if any assumptions are not valid or have been made in error. GPD should be notified to determine the effect on the structural integrity of the tower. tnxTower Report - version 8.0.5.0 July 23, 2019 134 Ft Monopole Tower Structural Analysis CC/ BU No 5800245 Project Number 2019777.5800245.02, Application 495193, Revision 0 Page 5 4) ANALYSIS RESULTS Table 4 - Section Capacity (Summary) Section i Critical Elevation (ft.) Component Type 'Size `Element No. I - (SF*P_allow P K 'O (K) i % Capacity` i Pass /Fail d L1 1 134 - 96.75 Pole TP27.77xl6x0.25 1 -9.228 1279.740 54.2 Pass L2 196.75-47.25 Pole TP42.91x26.006xn.5 2 -21.646 3949.386 36.0 Pass L3 47.25 - 0 Pole TP56.84x40.014x0.5 3 -42.153 5492.109 39.9 Pass Summary ELC: LC5 Pole (Lt) 54.2 Pass Rating = 54.2 Pass Table 5 - Tower Component Stresses vs. Capacity - LC5 Notes Component Elevation (ft.) % Capacity Pass / Fail 1,2 Anchor Rods 0 37.8 Pass 1,2 Base Plate 0 25.2 Pass 1,2 Base Foundation 0 Structural 36.3 Pass 1,2 Base Foundation 0 Soil Interaction 23.6 Pass Structure Rating (max from all components) = 64.2% II Notes: 1) See additional documentation in "Appendix C -Additional Calculations" for calculations supporting the % capacity consumed. 2) Tower capacities adjusted per TIA-222-H Section 15.5. 4.1) Recommendations The tower and its foundation have sufficient capacity to carry the proposed load configuration. No modifications are required at this time. tnxTower Report - version 8.0.5.0 July 23, 2019 134 Ft Monopole Tower Structural Analysis CC/ BU No 5800245 Project Number 2019777.5800245.02, Application 495193, Revision 0 Page 6 5) DISCLAIMER OF WARRANTIES GPD has not performed a site visit to the tower to verify the member sizes or antenna/coax loading. If the existing conditions are not as represented on the tower elevation contained in this report, we should be contacted immediately to evaluate the significance of the discrepancy. This is not a condition assessment of the tower or foundation. This report does not replace a full tower inspection. The tower and foundations are assumed to have been properly fabricated, erected, maintained, in good condition, twist free, and plumb. The engineering services rendered by GPD in connection with this Structural Analysis are limited to a computer analysis of the tower structure and theoretical capacity of its main structural members. No allowance was made for any damaged, bent, missing, loose, or rusted members (above and below ground). No allowance was made for loose bolts or cracked welds. This analysis is limited to the designated maximum wind and seismic conditions per the governing tower standards and code. Wind forces resulting in tower vibrations near the structure's resonant frequencies were not considered in this analysis and are outside the scope of this analysis. Lateral loading from any dynamic response was not evaluated under a time -domain based fatigue analysis. GPD does not analyze the fabrication of the structure (including welding). It is not possible to have all the very detailed information needed to perform a thorough analysis of every structural sub -component and connection of an existing tower. GPD provides a limited scope of service in that we cannot verify the adequacy of every weld, plate connection detail, etc. The purpose of this report is to assess the capability of adding appurtenances usually accompanied by transmission lines to the structure. It is the owner's responsibility to determine the amount of ice accumulation in excess of the code specified amount, if any, that should be considered in the structural analysis. The attached sketches are a schematic representation of the analyzed tower. If any material is fabricated from these sketches, the contractor shall be responsible for field verifying the existing conditions, proper fit, and clearance in the field. Any mentions of structural modifications are reasonable estimates and should not be used as a precise construction document. Precise modification drawings are obtainable from GPD, but are beyond the scope of this report. Miscellaneous items such as antenna mounts, etc., have not been designed or detailed as a part of our work. We recommend that material of adequate size and strength be purchased from a reputable tower manufacturer. Towers are designed to carry gravity, wind, and ice loads. All members, legs, diagonals, struts, and redundant members provide structural stability to the tower with little redundancy. Absence or removal of a member can trigger catastrophic failure unless a substitute is provided before any removal. Legs carry axial loads and derive their strength from shorter unbraced lengths by the presence of redundant members and their connection to the diagonals with bolts or welds. If the bolts or welds are removed without providing any substitute to the frame, the leg is subjected to a higher unbraced length that immediately reduces its load carrying capacity. If a diagonal is also removed in addition to the connection, the unbraced length of the leg is greatly increased, jeopardizing its load carrying capacity. Failure of one leg can result in a tower collapse because there is no redundancy. Redundant members and diagonals are critical to the stability of the tower. GPD makes no warranties, expressed and/or implied, in connection with this report and disclaims any liability arising from material, fabrication, and erection of this tower. GPD will not be responsible whatsoever for, or on account of, consequential or incidental damages sustained by any person, firm, or organization as a result of any data or conclusions contained in this report. The maximum liability of GPD pursuant to this report will be limited to the total fee received for preparation of this report. tnxTower Report - version 8.0.5.0 July 23, 2019 134 Ft Monopole Tower Structural Analysis CCI BU No 5800245 Project Number 2019777.5800245.02, Application 495193, Revision 0 Page 7 APPENDIX A TNXTOWER OUTPUT tnxTower Report - version 8.0.5.0 Mon %.a ft 47.3 ft 0.0 ft TOWER DESIGN NOTES 1. Tower is located in St. Lucie County, Florida. 2. Tower designed for Exposure C to the TIA-222-H Standard. 3. Tower designed for a 158 mph basic wind in accordance with the TIA-222-H Standard. 4. Deflections are based upon a 60 mph wind. 5. Tower Risk Category II. 6. Topographic Category 1 with Crest Height of 0.000 It 7. TOWER RATING: 54.2% ALL REACTIONS AREFACTORED AXIAL �4-2IrKK EAR \ MOMENT K y 3017 kip-ft TORQUE 1 kip-R REACTIONS -158 mph WIND GPD "" BU#. 520 South Main Street Suite 2531 Project 2019 Akron, Ohio 44" 1c"e"` Crow Phone:(555) 555-1: 1 code: TIA-2 Feed Line Distribution Chart 0' - 134' Reuna Flat App In Face App Oul Face Truee Leg W 134.000 Face A sa.Tsg -- -- ------ ------ ----- ----- ------ ------ -- --- a F � o a u �>c 5 R aT.zso __ ______ _____ ______ __ 0.ggo Face B Face C 520 South Main Street Suite 2531 Projen: Y019777, Akron, Ohio 44311 0°an° crown Ca. Phone: (555) 555-1234 c:IZ222-H ode: July 23, 2019 134 Ft Monopole Tower Structural Analysis CCI BU No 5800245 Project Number 2019777.5800245.02, Application 495193, Revision 0 Page 8 Tower Input Data The tower is a monopole. This tower is designed using the TIA-222-H standard. The following design criteria apply: 1) Tower is located in St. Lucie County, Florida. 2) Tower base elevation above sea level: 19.000 ft. 3) Basic wind speed of 158 mph. 4) Risk Category IL 5) Exposure Category C. 6) Simplified Topographic Factor Procedure for wind speed-up calculations is used. 7) Topographic Category: 1. 8) Crest Height: 0.000 ft. 9) Deflections calculated using a wind speed of 60 mph. to) A non -linear (P-delta) analysis was used. 11) Pressures are calculated at each section. 12) Stress ratio used in pole design is 1.05. 13) Tower analysis based on target reliabilities in accordance with Annex S. 14) Load Modification Factors used: Kes (Fw) = 0.95. 15) Local bending stresses due to climbing loads, feed line supports, and appurtenance mounts are not considered. Consider Moments - Legs Consider Moments - Horizontals Consider Moments - Diagonals Use Moment Magnification Use Code Stress Ratios Use Code Safety Factors - Guys Escalate Ice Always Use Max Kz Use Special Wind Profile Include Bolts In Member Capacity Leg Bolts Are At Top Of Section Secondary Horizontal Braces Leg Use Diamond Inner Bracing (4 Sided) SR Members Have Cut Ends SR Members Are Concentric Options Distribute Leg Loads As Uniform Assume Legs Pinned Assume Rigid Index Plate Use Clear Spans For Wind Area Use Clear Spans For KUr Retension Guys To Initial Tension Bypass Mast Stability Checks Use Azimuth Dish Coefficients Project Wind Area of Appurt. Autocalc Torque Arm Areas Add IBC .6D+W Combination Sort Capacity Reports By Component Triangulate Diamond Inner Bracing Treat Feed Line Bundles As Cylinder Ignore KUry For 60 Deg. Angle Legs Use ASCE 10 X-Brace Ly Rules Calculate Redundant Bracing Forces Ignore Redundant Members in FEA SR Leg Bolts Resist Compression All Leg Panels Have Same Allowable Offset Girt At Foundation Consider Feed Line Torque Include Angle Block Shear Check Use TIA-222-H Bracing Resist. Exemption Use TIA-222-H Tension Splice Exemption Poles —"1 Include Shear -Torsion Interaction Always Use Sub -Critical Flow Use Top Mounted Sockets q Pole Without Linear Attachments Pole Win Shroud Or No Appurtenances Outside and Inside Corner Radii Are Known tnxTower Report - version 8.0.5.0 July 23, 2019 134 Ft Monopole Tower Structural Analysis CCI BU No 5800245 Project Number 2019777.5800245.02, Application 495193, Revision 0 Page 9 Tapered, Pole Section Geometry Section Elevation Section Splice Number Top Bottom Wall Bend Pole Grade Length Length of Diameter Diameter Thickness Radius R ft @ Sides in in in in L1 134.000- 37.250 4.000 18 16.000 27.770 0.250 1.000 A572-65 96.750 (65 ksi) L2 96.75047.250 53.500 6.000 18 26.006 42.910 0.500 2.000 A572-65 (65 ksi) L3 47.250-0.000 53.250 18 40.014 56.840 0.600 2.000 A572-65 (65 ksi) Ta ered Pole Properties oecnon np ura. Area I r C I/C J lt/Q w w/t in irt3 W in in in3 in4 in3 in L1 16.208 12.498 391.675 5.591 8.128 48.188 783.866 6.250 2.376 9.504 28.160 21.837 2089.439 9.770 14.107 148.112 4181.627 10.921 4.448 17.79 L2 27.613 40.478 3326.955 9.055 13.211 251.830 6658.288 20.243 3.697 7.394 43.495 67.305 15293.933 15.056 21.798 701.612 30607.991 33.659 6.672 13.344 L3 42.479 62.709 12370.155 14.028 20.327 608.551 24756.588 31.361 6.163 12.325 57.640 89.412 35856.253 20.001 28.875 1241.787 71759.687 44.714 9.124 18.248 Tower Gusset Gusset Gusset Grade Adjust Factor Adjust Weight Mult. Double Angle Double Angle Double Angle Elevation Area Thickness At Factor Stitch Bolt Stitch Bolt Stitch Bolt (per face) A, Spacing Spacing Spacing Diagonals Hodzontals Redundants B in in in in 96.750 L2 96.750- 1 1 1 47.250 L3 47.250- 1 1 1 0.000 Feed Line/Linear Appurtenances - Entered As Area Weight Description Face Allow Exclude Componen Placement Total CAAA or Shield From t Number Leg Torque Type It R /R klf Calculation Safety Line (3/8") C No No CaAa (Out 134.000 - 1 No Ice 0.037 0.000 Of Face) 8.000 5/8"Step Bolts C No No CaAa (Out 134.000 - 1 No Ice 0.042 0.001 Of Face) 8.000 LDF7-50A(1-518") A No No Inside Pole 132.000 - 15 No Ice 0.000 0.001 0.000 12 PAIR(3/8") A No No Inside Pole 132.000 - 1 No Ice 0.000 0.000 0.000 WR-VG86ST- A No No Inside Pole 132.000- 2 No Ice 0.000 0.001 BRD(3/4) 0.000 9207 (5/16 FOEM) A No No Inside Pole 132.000 - 3 No Ice 0.000 0.001 0.000 EC7-50A( 1 5/8") C No No Inside Pole 120.000 - 12 No Ice 0.000 0.001 0.000 LDF6-50A (1-1/4 C No No Inside Pale 120.000 - 1 No Ice 0.000 0.001 FOAM) 0.000 tnxTower Report - version 8.0.5.0 July 23, 2019 134 Ft Monopole Tower Structural Analysis CC/ BU No 5800245 Project Number 2019777.5800245.02, Application 495193, Revision 0 Page 10 Discrete Tower Loads Weight Descnption Face Offset Offsets: Azimuth Placement CAAA CAAA or Type Horz Adjustmen Front Side Leg Lateral t Vert re re ttz re K reo re Lighting Rod 3/4" x 3' C From Leg 0.000 0.000 134.000 No Ice 0.225 0.225 0.030 0.000 1.500 (2) 800 10122 w/ Mount A From 4.000 0.000 132.000 No Ice 6.240 4.890 0.086 Pipe Centroid- 0.000 Leg 1.000 (2) 800 10122 w/ Mount B From 4.000 0.000 132.000 No Ice 6.240 4.890 0.086 Pipe Centroid- 0.000 Leg 1.000 (2) 800 10122 w/ Mount C From 4.000 0.000 132.000 No Ice 6.240 4.890 0.086 Pipe Centroid- 0.000 Leg 1.000 800 10764 w/ Mount Pipe A From 4.000 0.000 132.000 No Ice 4.330 3.120 0.066 Centroid- 0.000 Leg 1.000 800 10764 w/ Mount Pipe B From 4.000 0.000 132.000 No Ice 4.330 3.120 0.066 Centroid- 0.000 Leg 1.000 800 10764 w/ Mount Pipe C From 4.000 0.000 132.000 No Ice 4.330 3.120 0.066 Centroid- 0.000 Leg 1.000 RRUS 11 A From 4.000 0.000 132.000 No Ice 2.784 1.187 0.051 Centroid- 0.000 Leg 1.000 RRUS 11 B From 4.000 0.000 132.000 No Ice 2.784 1.187 0.051 Centroid- 0.000 Leg 1.000 RRUS 11 C From 4.000 0.000 132,000 No Ice 2.784 1.187 0.051 Centroid- 0.000 Leg 1.000 (2) RRUS 11 B12 A From 4.000 0.000 132.000 No Ice 2.833 1.182 0.051 Centroid- 0.000 Leg 1.000 (2) RRUS 11 B12 B From 4.000 0.000 132.000 No Ice 2.833 1.182 0.051 Centroid- 0.000 Leg 1.000 (2) RRUS 11 B12 C From 4.000 0.000 132.000 No Ice 2.833 1.182 0.051 Centroid- 0.000 Leg 1.000 (2) RRUS 11 B2 A From 4.000 0.000 132.000 No Ice 2.833 1.182 0.051 Centroid- 0.000 Leg 1.000 (2) RRUS 11 B2 B From 4.000 0.000 132.000 No Ice 2.833 1.182 0.051 Centroid- 0.000 Leg 1.000 (2) RRUS 11 B2 C From 4.000 0.000 132.000 No Ice 2.833 1.182 0.051 Centroid- 0.000 Leg 1.000 CBC819-DF A From 4.000 0.000 132.000 No Ice 0.447 0.070 0.004 Centroid- 0.000 Leg 1.000 CBC819-DF B From 4.000 0.000 132.000 No Ice 0.447 0.070 0.004 Centroid- 0.000 Leg 1.000 CBC819-DF C From 4.000 0.000 132.000 No Ice 0.447 0.070 0.004 Centroid- 0.000 Leg 1.000 (2) ETB19G8-12UB A From 4.000 0.000 132.000 No Ice 0.909 0.424 0.020 Centroid- 0.000 Leg 1.000 (2) ETB19G8-12UB B From 4.000 0.000 132.000 No Ice 0.909 0.424 0.020 Centroid- 0.000 Leg 1.000 tnxTower Report - version 8.0.5.0 July 23, 2019 134 Ft Monopole Tower Structural Analysis CCI BU No 5800245 Project Number 2019777.5800245.02, Application 495193, Revision 0 Page 11 Description Face Offset Offsets: Azimuth Placement CAAA CAAA Weight or Type Norz Adjustmen Front Side Leg Lateral t Vert R ft @' ftz K R re (2) ETB19G8-12UB C From 4.000 0.000 132.000 No Ice 0.909 0.424 0.020 Centroid- 0.000 Leg 1.000 DC6-48-60-18-8F Surge B From 4.000 0.000 132.000 No Ice 0.917 0.917 0.019 Suppression Unit Centroid- 0.000 Leg 1.000 8'x2" Mount Pipe A From 4.000 0.000 132.000 No Ice 1.900 1.900 0.030 Centroid- 0.000 Leg 1.000 8'x2" Mount Pipe B From 4.000 0.000 132.000 No Ice 1.900 1.900 0.030 Centroid- 0.000 Leg 1.000 8'x2" Mount Pipe C From 4.000 0.000 132.000 No Ice 1.900 1.900 0.030 Centroid- 0.000 Leg 1.000 Platform Mount [LP 303-1] B None 0.000 132.000 No Ice 14.660 14.660 1.250 HRK 14-U B None 0.000 123.000 No Ice 6.000 6.000 0.339 FFHH-65C-R3 w/ Mount A From 4.000 0.000 120.000 No Ice 12.970 6.200 0.161 Pipe Centroid- 0.000 Face 3.000 FFHH-65C-R3 w/ Mount B From 4.000 0.000 120.000 No Ice 12.970 6.200 0.161 Pipe Centroid- 0.000 Face 3.000 FFHH-65C-R3 w/ Mount C From 4.000 0.000 120.000 No Ice 12.970 6.200 0.161 Pipe Centroid- 0.000 Face 3.000 AHLOA A From 4.000 0.000 120.000 No Ice 2.229 1.391 0.084 Centroid- 0.000 Face 3.000 AHLOA B From 4.000 0.000 120.000 No Ice 2.229 1.391 0.084 Centroid- 0.000 Face 3.000 AHLOA C From 4.000 0.000 120.000 No Ice 2.229 1.391 0.084 Centroid- 0.000 Face 3.000 TMAT1921B78-21A A From 4.000 0.000 120.000 No Ice 0.652 0.300 0.018 Centroid- 0.000 Face 3.000 TMAT1921B78-21A B From 4.000 0.000 120.000 No Ice 0.652 0.300 0.018 Centroid- 0.000 Face 3.000 TMAT19211378-21A C From 4.000 0.000 120.000 No Ice 0.652 0.300 0.018 Centroid- 0.000 Face 3.000 RMOP-NP B None 0.000 120.000 No Ice 16.780 16.780 1.205 CMA-BDHH16520/EO-8 w/ A From 4.000 0.000 120.000 No Ice 9.292 5.099 0.085 Mount Pipe Centroid- 0.000 Face 3.000 CMA-BDHH/6520/EO-8w/ B From 4.000 0.000 120.000 NO Ice 9.292 5.099 0.085 Mount Pipe Centroid- 0.000 Face 3.000 CMA-BDHH/6520/EO-8 w/ C From 4.000 0.000 120.000 No Ice 9.292 5.099 0.085 Mount Pipe Centroid- 0.000 Face 3.000 FRIG A From 4.000 0.000 120.000 No Ice 3.411 1.579 0.055 Centroid- 0.000 Face 3.000 FRIG B From 4.000 0.000 120.000 No Ice 3.411 1.579 0.055 Centroid- 0.000 Face 3.000 FRIG C From 4.000 0.000 120.000 No Ice 3.411 1.679 0.055 Centroid- 0.000 Face 3.000 ASU9338TYP0I B From 4.000 0.000 120.000 No Ice 3.203 1.027 0.019 Centroid- 0.000 Face 3.000 tnxTower Report - version 8.0.5.0 July 23, 2019 134 Ft Monopole Tower Structural Analysis CCI BU No 5800245 Project Number 2019777.5800245.02, Application 495193, Revision 0 Page 12 Description Face Offset Offsets., Azimuth Placement CAAA CAAA Weight or Type Horz Adjustmen Front Side Leg Lateral t Vert ft ft ft2 ltz K ft It 8'x2" Mount Pipe A From 4.000 0.000 120.000 No Ice 1.900 1.900 0.030 Centroid- 0.000 Face 0.000 8'x2" Mount Pipe B From 4.000 0.000 120.000 No Ice 1.900 1.900 0.030 Centroid- 0.000 Face 0.000 8'x2" Mount Pipe C From 4.000 0.000 120.000 No Ice 1.900 1.900 0.030 Centroid- 0.000 Face 0.000 Load Combinations Comb. Description 2 1.2 Dead+1.0 Wind 0 deg - No Ice 3 0.9 Dead+1.0 Wind 0 deg - No Ice 4 1.2 Dead+1.0 Wind 30 deg - No Ice 5 0.9 Dead+1.0 Wind 30 deg - No Ice 6 1.2 Dead+1.0 Wind 60 deg - No Ice 7 0.9 Dead+1.0 Wind 60 deg - No Ice 8 1.2 Dead+1.0 Wind 90 deg - No Ice 9 0.9 Dead+1.0 Wind 90 deg - No Ice 10 1.2 Dead+1.0 Wind 120 deg - No Ice 11 0.9 Dead+1.0 Wind 120 deg - No Ice 12 1.2 Dead+1.0 Wind 150 deg - No Ice 13 0.9 Dead+1.0 Wind 150 deg - No Ice 14 1.2 Dead+1.0 Wind 180 deg - No Ice 15 0.9 Dead+1.0 Wind 180 deg - No Ice 16 1.2 Dead+1.0 Wind 210 deg - No Ice 17 0.9 Dead+1.0 Wind 210 deg - No Ice 18 1.2 Dead+1.0 Wind 240 deg - No Ice 19 0.9 Dead+1.0 Wind 240 deg - No Ice 20 1.2 Dead+1.0 Wind 270 deg - No Ice 21 0.9 Dead+1.0 Wind 270 deg - No Ice 22 1.2 Dead+1.0 Wind 300 deg - No Ice 23 0.9 Dead+1.0 Wind 300 deg - No Ice 24 1.2 Dead+1.0 Wind 330 deg - No Ice 25 0.9 Dead+1.0 Wind 330 deg - No Ice 26 Dead+Wind 0 deg - Service 27 Dead+Wind 30 deg - Service 28 Dead+Wind 60 deg - Service 29 Dead+Wind 90 deg - Service 30 Dead+Wind 120 deg - Service 31 Dead+Wind 150 deg - Service 32 Dead+Wind 180 deg - Service 33 Dead+Wind 210 deg - Service 34 Dead+Wind 240 deg - Service 35 Dead+Wintl 270 deg - Service 36 Dead+Wind 300 deg - Service 37 Dead+Wind 330 deg - Service Maximum Tower Deflections - Service Wind Horz. Gov. Tilt Twist Section Elevation No. Deflection Load ft in Comb. ° L1 134 - 96.75 7.880 28 0.618 0.001 L2 100.75 - 47.25 4.081 34 0.416 0.000 L3 53.25 - 0 1.070 34 0.191 0.000 tnxTower Report - version 8.0.5.0 July 23, 2019 134 Ft Monopole Tower Structural Analysis CCI BU No 5800245 Project Number 2019777.5800245.02, Application 495193, Revision 0 Page 13 Critical Deflections and Radius of Curvature - Service Wind Elevation Appurtenance Gov. Deflection Tilt Twist Radius of Load Curvature Is4.000 Lighting Rod 3/4" x 3' 28 7.880 0.618 0.001 49061 132.000 (2) 800 10122 w/ Mount Pipe 28 7.634 0.605 0.001 49061 123.000 HRK 14-U 28 6.535 0.549 0.000 22300 120.000 FFHH-65C-R3 w/ Mount Pipe 28 6.176 0.530 0.000 17522 Maximum Tower Deflections - Design Wind Section Elevation Horz. Gov, Tilt Twist No. Deflection Load R in Comb L1 134 - 96.75 58.173 6 4.565 0.005 L2 100.75 - 47.25 30.138 18 3.074 0.001 L3 53.25 - 0 7.905 18 1.413 0.000 Critical Deflections and Radius of Curvature - Design Wi d Elevation Appurtenance Gov. Deflection Tilt Twist Radius of Load Curvature 134.000 132.000 123.000 120.000 Lighting Rod 3/4" x 3' (2) 800 10122 wl Mount Pipe HRK 14-U FFHH-65C-R3 w/ Mount Pipe 6 58.173 4.565 6 56.354 4.472 6 48.248 4.054 6 45.604 3.917 0.005 0.004 0.003 0.003 6724 6724 3055 2400 Compression Checks Pole Desi n Data Section No. Elevation Size R L L„ KUr A it R W P. K @P� Ratio P K r L1 134 - 96.75 TP27.77x16x0.25 (1) 37.250 0.000 0.0 20.834 -9.228 1218.800 0.008 L2 96.75 - 47.25 TP42.91x26.006x0.5 (2) 53.500 0.000 0.0 64.296 -21.646 3761.320 0.006 L3 47.25-0(3) TP56.84x40.014x0.5 53.250 0.000 0.0 89.412 -42.153 5230.580 0.008 Pole Bendin Desi n Data Section Elevation Size M. ¢X, Ratio My �Mr Ratio No. M. My it k/p-R kip-R TM-,x kip-R kip -it AM,,, �i 1n-ao. to i rnr,rixlbxu.z5 455.091 813.498 0.559 (1) L2 96.75-47.25 TP42.91x26.006x0.5 1474.033 3962.025 0.372 (2) L3 47.25-0(3) TP56.84x4o.0144.5 3016.808 7348.558 0.411 0.000 3962.025 0.000 0.000 7348.558 0.000 tnxTower Report - version 8.0.5.0 134 Ft Monopole Tower Structural Analysis Project Number 2019777.5800245.02, Application 495193, Revision 0 Pole Shear Design Data July 23, 2019 CC/ BU No 5800245 Page 14 Section Elevation Size Actual oV Ratio Actual $ Ratio No. Vu V T T. tt K K mV kip-R kip-R 0T L1 134 - 96.75 TP27.77x16x0.25 1A95n ARF ae1 n nFn n vnn nen �cn (1) L2 96.75 - 47.25 TP42.91x26.006x0.5 24.932 1128.400 0.022 0.243 4003.592 0.000 (2) L3 47.25 - 0 (3) TP56.84x40.014x0.5 32.870 1569.170 0.021 0.243 7742.258 0.000 Pole Interaction Desi n .Data Section Elevation Ratio Ratio Ratio Ratio Ratio Comb. Allow. Criteria No. P. M. MW V. T. Stress Stress R 0P rDM,,. OM„y mV 0Tn Ratio Ratio L1 134 - 96.75 0.008 0.559 0.000 0.050 0.000 0.570 1.050 4.8.2 (1) L2 96.75 -47.25 0.006 0.372 0.000 0.022 0.000 0.378 1.050 4.8.2 (2) L3 47.25 - 0 (3) 0.008 0.411 0.000 0.021 0.000 0.419 1.050 4.8.2 Section Capacity Table Pass Section Elevation Component Size Critical P oP.H . % No. R TYpa Element K K Capacity Fail L1 134-96.75 Pole TP27.77xl6x0.25 1 -9.228 1279.740 54.2 Pass L2 96.75-47.25 Pole TP42.91x26.006x0.5 2-21.646 3949.386 36.0 Pass L3 47.25 - 0 Pole TP56.84x40.014x0.5 3-42.153 5492.109 39.9 Pass Summary ELC: LC5 Pole (1-1) 54.2 Pass Rating = 54.2 Pass tnxTower Report - version 8.0.5.0 July 23, 2019 134 Ft Monopole Tower Structural Analysis CC/ BU No 5800245 Project Number 2019777.5800245.02, Application 495193, Revision 0 Page 15 APPENDIX B BASE LEVEL DRAWING tnxTower Report - version 8.0.5.0 July 23, 2019 134 Ft Monopole Tower Structural Analysis CCI BU No 5800245 Project Number 2019777.5800245.02, Application 495193, Revision 0 Page 16 APPENDIX C ADDITIONAL CALCULATIONS tnxTower Report - version 8.0.5.0 (Mm COµ51Dmm mUIP DM (3) 5/15' TO, R IEreL ,/, TO 1. R 1EVE Li�L (15) 1-5/8' TD 132 ET IM.L— PROPMS) F F1J 1-1/." OUSMMS UNR;5500245 TOWER �O;C_BASE1£NEL PLOT OpiE N]R010 F0.ENAY.E SBBM[5 BpSELEV¢.YWS CAOMSOSWNADDP uv. 9 Bd Rae i Sa DN BY. MM CxECNED W. WAS oxpmxcopre moEno 0 SRENYYBER: SREXANE: REN E mx BYSWE66YNRNIMBE0. 680MA 6REA0[IRE34 .d C. C BLVD, SST.LUCIE.P PLNae3 C0Y11TY USA SXEETiRIE BASE LEVEL DRAWING xEEr xYNBEN ' A1.O Monopole Base Plate Connection Bl1 #1 5800245 Site Name I Fox Ord r#1 495193 Rev. 0: nmfflflr. ... . TIA-222 Revision H' Grout Considered: No I., (in)l p Moment (kip-k) 3016.81 Axial Farce (kips) 42.15 Shear Force (kips) 32.87 'TIA-122-HSecdon 15.5 Applied CCCROWN v CASTLE 0 010, -------`----� �. Q b O Connection Properties Analysis Results Anchor Rod Data Anchor Rod Summary (units of kips, kip -in) (24) 2-1/4" o baits (A615-75 N; Fy=75 ksi, Fu=300 ksi) on 63.5" BC Pu_c = 96.73 cl Pn_c = 243.75 Stress Rating Anchor5pocing: 6 in Vu=1.37 mVn=73.13 37.8% Mu = n/a bMn = n/a Pass Base Plate Data 66.5" OD x 3" Plate (A572-50; Fy=50 ksi, Fu=65 ksi) Base Plate Summary Max Stress(ksi): 11.91 (Flexural) Stiffener Data Allowable Stress (ksi): 45 N/A Stress Rating: 25.2% Pass Pole Data 56.84" x 0.5" 18-sided pole (A572-65; Fy=65 ksi, Fu=80 ksi) CClplate - version 3.6.0 Analysis Date: 7/23/2019 Drilled Pier Foundation BU # : 5800245 Site Name: I FOX Order Number: 495193 Rev. 0 TIA-222 RevrType:� wer Type To: Mono ole • Comp. Uplift Mamenl ki -ft 3016.81 11 Axial Force kips 42.15 Shear Force ki s 32.87 Concrete Siren th, fc 4 ksi Reber Stren th, F : 1 60 ksi iggL'�. De th ". -40 ft Ed. Above Gradel 0:5 ft Pier Section 1 Fmm 0.5'above g.d. l0 40'belowgra4e PierDianaterl 7ft Reber Quantityl 36 Reber Sizel 11 Sail Lateral Capacity Corrmoression IIn1ift _ _ _Dp ftfrom TOC 10.35 - •.: Soil Safety Factor 8.55 Max Moment (kip-ft) 3266.31 1- - '.Rating -I 14.8% Soil Vertical Capacity Compression Unliff Skin Friction(kips) 809.40 1- "" lEnd Bearinglkipa) .,., 90.02 tWeight of.Concrete:(kips) 181.13 !Total Capacity Ikipa) 899.42 - ':'.Axial'(kips) 223.28 - _' "'-�Rating-1 23.6% Reinforced Concrete Capacity Compression U lift - 'Critical Depthl(ftfrdm70C) 10.43 ___. critical 'Moment .(kip-ft) 3266.29 - '..CrlticaLMomentCapaci[y 8567.46 I Ratini,-I 36.3%- CROWN v CASTLE Apply TIA-222-H Section 15.5A W' - NIA Layer - Top .Bottom Thickness y,ii, V .e. 'Cohesmn CalculatedCalculate Ultimate Skin- Ultimate Skin Ultimatein .Friction Com p Ultimate Skin a . UI[. Grass Bearing' Blow ,.,. ." ' _ (ft1� (tt) (path (Pcf)" (ksf) c on C Fdction Comp''Frtction Updtt Frction Uplift, " .SPT �- S .Soil Type - .Fri (degrees! (ks, .�. -,.(ksfl ,' (ksfl - �� Override.(ksfJ- Capacity Count , , - 1 0 3.5 3.5 120 150 -- 0 - 0 0.000 0.000 - ss -18 2 - 120 150 0 - 30 0.655 0.655 - 18.5 Cohesionle ss z.3 5.5 12.5 58 87.6 0 .30 0.919 0.919 - 13 Cohesionless _ - 4 181 40 22 68 87.6 - 0 - 34 1.649 1.649 - 3.119 46 Cohesionless Version 2.1.1 ASCE nn,eccna SOCctt ar ova � Address: No Address at This Location Wind Results: ASCE 7 Hazards Report Standard: ASCE/SEI 7-10 Elevation: 18.54 It (NAVD 88) Risk Category: II Latitude: 27.481714 Soil Class: D - Stiff Soil Longitude: -80.375744 Wind Speed: 158 Vmph 10-year MRI 87 Vmph 25-year MRI 106 Vmph 50-year MRI 118 Vmph 100-year MRI 129 Vmph Data Source: ASCE/SEI 7-10, Fig. 26.5.1A and Figs. CC-1—CC-4, incorporating errata of March 12, 2014 Date Accessed: Fri Jul 19 2019 Value provided is 3-second gust wind speeds at 33 ft above ground for Exposure C Category, based on linear interpolation between contours. Wind speeds are interpolated in accordance with the 7-10 Standard. Wind speeds correspond to approximately a 7% probability of exceedance in 50 years (annual exceedance probability = 0.00143, MRI = 700 years). Site is in a hurricane -prone region as defined in ASCE/SEI 7-10 Section 26.2. Glazed openings shall be protected against wind-borne debris as specified in Section 26.10.3. Mountainous terrain, gorges, ocean promontories, and special wind regions should be examined for unusual wind conditions. httos:/Iasce7hazardtool.onlinel Page 1 of 3 Fd Jul 19 2019 -SCE AMniMSGDDYofM&'ffl 6 Seismic Site Sall Class: D - Stiff Soil Results: Ss : 0.056 SDs : S, 0.029 SDI : Fa : 1.6 TL F� 2.4 PGA: SMs : 0.09 PGA M SMi 0.071 FpGA la : Seismic Design Category A 0.09 MCER Response Spectrum 0.06 0,07 i 0,05 0.06 I 0.04 0.04 I. ( 0,03- 0.03 o:02 - 0.02- 0.01 0.01 1 Sa (9)vs T(s) 5 8 7 0 0.06 0.047 8 0.027 0.043 1.6 1 resign Response Spectrum _ 1 Data Accessed: Fri Jul 19 2019 Date Source: USGS Seismic Design Maps based on ASCE/SEI 7-10, incorporating Supplement 1 and errata of March 31, 2013, and ASCE/SEI 7-10 Table 1.5-2: Additional data for site -specific ground motion procedures in accordance with ASCE/SEI 7-10 Ch. 21 are available from USGS. httos:/Iasee7hazardtool.onlinel Page 2 of 3 Fri Jul 19 2019 ASCE u�moras soonr or ow w�inens Ice Results: Ice Thickness: Concurrent Temperature: Gust Speed: Data Source: Date Accessed: 0.00 in. 25 F 30 mph Standard ASCE/SEI 7-10, Figs. 10-2 through 10-8 Fri Jul 19 2019 Ice thicknesses on structures in exposed locations at elevations higher than the surrounding terrain and in valleys and gorges may exceed the mapped values. Values provided are equivalent radial ice thicknesses due to freezing rain with concurrent 3-second gust speeds, for a 50-year mean recurrence interval, and temperatures concurrent with ice thicknesses due to freezing rain. Thicknesses for ice accretions caused by other sources shall be obtained from local meteorological studies. Ice thicknesses in exposed locations at elevations higher than the surrounding terrain and in valleys and gorges may exceed the mapped values. The ASCE 7 Hazard Tool Is provided for your convenience, for informational purposes only, and is provided 'as is' and without warranties of any kind. The location data Included herein has been obtained from Information developed, produced, and maintained by third party providers; or has been extrapolated from maps incorporated In the ASCE 7 standard. While ASCE has made every effort to use data obtained from reliable sources or methodologies, ASCE does not make any representations or warranties as to the accuracy, completeness, reliability, currency, or quality of any data provided herein. Any third -party links provided by this Tool should not be construed as an endorsement, affiliation, relationship, or sponsorship of such third -party content by or from ASCE. ASCE does not Intend, nor should anyone Interpret, the results provided by this Tool to replace the sound judgment of a competent professional, having knowledge and experience In the appropriate field(s) of practice,.. nor to substitute for the standard of care required of such professionals In Interpreting and applying the contents of this Tool or the ASCE 7 standard. In using this Tool, you expressly assume all risks associated with your use. Under no circumstances shall ASCE or Its officers, directors, employees, members, affiliates, or agents be liable to you or any other person for any direct, Indirect, special, Incidental, or consequential damages arising from or related to your use of, or reliance on, the Tool or any information obtained therein. To the fullest extent permitted by law, you agree to release and hold harmless ASCE from any and all liability of any nature arising out of or resulting from any use of data provided by the ASCE 7 Hazard Tool. httos://asce7hazardtool.onifne/ Page 3 of 3 Fri Jul 19 2019