Loading...
HomeMy WebLinkAboutWeekly Report No. 4 Oct 28-Nov 1 FPR MRO Hangar_July 2020AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconinc.com CIVIL & STRUCTURAL  AIRPORT & AVIATION CONSULTING  TRANSPORTATION DESIGN & PLANNING AVCON Project No. 2017.159.01 November 1, 2019 St. Lucie County  2300 Virginia Avenue  Fort Pierce, Fl 34982  Attention:  Mr. Gary Stepalavich, Building Official  Reference: MRO FPR Hangar  Project No. 1907‐0552  St. Lucie County, Florida  THRESHOLD REPORT SUMMARY NO. 4  Dear Mr. Stepalavich:  As directed, representatives from AVCON, Inc. performed on‐site, threshold inspection services for the  MRO FPR  Hangar project.  This report summarizes our threshold inspection services performed during the inspection period of  October  5,  2019  through November 1, 2019.  Inspections took place on November 1, as the helical piles were installed, and the rebar for the footings was re-inspected.    Our inspections  were  performed  in  accordance  with  the  structural  documents,  signed,  and  sealed  by  the  Engineer  of Record, Luca DelVerme PE (AVCON INC), and  the project  specifications.  Our  special  inspector  and  his  duly  authorized  representative(s)  reported  their  observations  as  noted  on  the  attached  Daily  Threshold  Reports  with  all  structural  non‐compliance  items  noted  within  the  attached  Special  Inspection  Log  (SIL).    All  non‐compliance  items,  or  SIL’s,  previously  reported  as  non‐compliant  with  regard  to  the  plans or specifications, will be reevaluated by our Special Inspector after corrective action is taken by the General  Contractor or the deficient conditions have been approved through written approval by the Engineer of Record.  During  the  inspection  period  of  October 5, 2019 through November 1, 2019,  and  to  the  best  of  our  knowledge  and  belief,  the  construction  of  all  structural  load‐bearing  components  described  in  the  threshold  inspection plan complies with permitted documents, with revisions as approved by the Engineer of Record, except as  noted on the SIL.  Should you have any questions or concerns regarding these reports, or desire any additional information, please  contact us.  Sincerely,  AVCON, Inc.  Certificate of Authorization No. 5057  Rick V. Baldocchi, P.E.  Vice President  STATE OF FLORIDA  Professional Engineer No. 38092  Registered Special Inspector No. 1019      cc:   Addressee, Gary Stepalavich StepalavichG@stlucieco.org    County Project Manager, Scotty Beaulieu beaulieus@stlucieco.org    Chief Plans Examiner, William Durden DurdenW@stlucieco.org    Construction Project Manager, Robert Hatton rhatton@ahrenscompanies.com  AVCON, INC. ENGINEERS & PLANNERS 5555 E. Michigan St., Suite 200 Orlando, Florida 32822 Phone: (407) 599-1122 Fax: (407) 599-1133 www.avconinc.com Page 2 of 2 CIVIL & STRUCTURAL  AIRPORT & AVIATION CONSULTING  TRANSPORTATION DESIGN & PLANNING AVCON Project No. 2017.159.01 November 1, 2019 St. Lucie County  2300 Virginia Avenue  Fort Pierce, Fl 34982  Attention:  Mr. Gary Stepalavich, Building Official  Reference: MRO FPR Hangar  Project No. 1907‐0552  St. Lucie County, Florida  THRESHOLD REPORT SUMMARY NO. 4  INSPECTOR(S): Rick Baldocchi (AVCON, Inc.)  DAILY REPORT(S):  Threshold Inspection Daily Report(s):  11/01/19 [See attached report(s) for locations and observations.]  SPECIAL INSPECTION LOG:  Added this Summary Period: 0  Resolved this Summary Period: 4  Outstanding for the Project: 0  ATTACHMENT(S):  ‐ None.  AVCON, INC. ENGINEERS & PLANNERS The Special Inspector, Rick V. Baldocchi, P.E., acknowledges this deficiency. The Special Inspector, Rick V. Baldocchi, P.E., acknowledges resolution to this deficiency. This is a brief summary of the SIL. Refer to the daily report for a detailed description. Page 1 of 1 1 2 3 SPECIAL INSPECTION LOG Permitting Agency: St. Lucie County Permit No.: Project Name: FPR MRO Hangar 1907-0552 Project No.: 2017.0259.01 Update Period: 10-28-19 to 11-01-19 Attention: Ahrens Construction/St. Lucie County Project Location: Port St. Lucie, St. Lucie County, Florida Threshold Agent: Rick V. Baldocchi SIL No. Date Daily Report No. Structural Element Location Description S.I.Engineer of Record Response S.I.Date Closed Daily Report No. 1 8-26-19 SIL Summary 1 Helical Piles Submittals N/A The helical pile submittal on site does not have SEOR or County Building Department acceptance stamp. RVB EOR approved calculations and revised plans RVB 10/30/19 009 2 8-30-19 SIL Summary 2 Helical Piles Footings A-7 & L-7 The contract documents do not show helical piles within the footings. RVB EOR approved calculations and revised plans RVB 10/30/19 009 3 09/20/19 SIL Summary 3 Helical Piles Footings A-7 – C-7, F7 – L7, G-8 & L-8, G-9 – L-9 The contract documents do not show helical piles within the footings. RVB EOR approved calculations and revised plans RVB 10/30/19 009 4 10/02/19 SIL Summary 4 Foundations All locations The rebar in the top mat deviate from plans/shop drawings RVB Delegated engineer submitted letter regarding the removal of top mat hooks - EOR accepted RVB 11/01/19 009 2 1 3 5(325712 352-(&7'$7( /2&$7,21:25.25'(512 3(50,7$*(1&< &/,(17 ),(/'&217$&7 &200(1766&23(2):25. , ,163(&725  ),(/'&23,(672 BUILDING PERMIT NO.:______________________ INSPECTION DAILY REPORT 009 FPR MRO Hangar 11/01/19 Treasure Coast International Airport & Business St. Lucie County Permit No. 1812-0473 Robert Hatton Observed rebar that was placed prior over the helical pile caps. Plans for that have been approved from EOR for helical piles. EOR approved plans/letter for footings. Final elevations for anchor bolts will be corrected prior to the concrete placement, as well as general housekeeping as per the contract to ensure that excess debris that has sluffed in will be removed. Jason Teliszczak - w/Avcon AVCON