Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutTruss EngineeringLumber design values are in accordance with ANSI/TPI 1-2014 section 6.3
These truss designs rely on lumber values established by others.
RE: Job 81126
Page 1 of 2
A-1 Roof Trusses
4451 St Lucie Blvd
Fort Pierce, FL 34946Site Information:
Customer Info: COLE CONSTRUCTION Project Name: HUECK RESIDENCE
Lot/Block:Model:
Subdivision: Address: 2926 S HEADER CANAL ROAD, FORT PIERCE, FL 34945
City: County: St Lucie State: FL
Name Address and License # of Structural Engineer of Record, If there is one, for the building.
Name: License #:
Address:
City:
General Truss Engineering Criteria Design Loads (Individual Truss Design Drawings Show Special Loading
Conditions):
Design Code: FBC 2017 RES / TPI 2014 Design Program: Alpine Engineered Products
Wind Code: ASCE 7-10 Wind Speed: 160
Roof Load: 40.0 psf Floor Load: 0.0 psf
This package includes 53 individual, dated Truss Design Drawings and 16 Additional Drawings.
With my seal affixed to this sheet, I hereby certify that I am the Truss Design Engineer and this index sheet
conforms to 61G15-31.003,section 5 of the Florida Board of Professional Engineers Rules.
The truss drawing(s) referenced have been prepared by Alpine Engineered Products, Inc. under my direct supervision based on the parameters provided by A-1 Roof Trusses, Ltd.
Truss Design Engineer's Name: Manuel Martinez
My license renewal date for the state of Florida is February 28,2021.
NOTE: The seal on these drawings indicate acceptance of professional engineering
responsibility solely for the truss components shown.
The suitability and use of components for any particular building is the responsibility of the building
designer, per ANSI/TPI-1 Sec. 2.
The Truss Design Drawing(s)(TDD[s]) referenced have been prepared based on the construction
documents (also referred to at times as 'Structural Engineering Documents') provided by the Building
Designer indicating the nature and character of the work.
The design criteria therein have been transferred to Manuel Martinez PE by [A1 Roof Trusses or specific
location]. These TDDs (also referred to at times as 'Structural Delegated'
Engineering Documents') are specialty structural component designs and may be part of the project's
deferred or phased submittals. As a Truss Design Engineer (i.e., Specialty
Engineer), the seal here and on the TDD represents an acceptance of professional engineering
responsibility for the design of the single Truss depicted on the TDD only. The Building Designer is
responsible for and shall coordinate and review the TDDs for
compatibility with their written engineering requirements. Please review all TDDs and all related notes. Manuel Martinez, P.E.
4620 ParkView Dr.
St. Cloud, FL 34771
No.Seq #Truss Name Date
1 4072 A01 6/23/20
2 3911 A02 6/23/20
3 3887 A03 6/23/20
4 3872 A04 6/23/20
5 3805 A05 6/23/20
6 3793 A06 6/23/20
7 3862 A07 6/23/20
8 3890 A08 6/23/20
9 3852 A09 6/23/20
10 3845 A10 6/23/20
11 3839 A11 6/23/20
12 3833 A12 6/23/20
No.Seq #Truss Name Date
13 3893 A13 6/23/20
14 2478 A14 6/23/20
15 3780 B01 6/23/20
16 3677 B02 6/23/20
17 3674 B03 6/23/20
18 3671 B04 6/23/20
19 3622 B05 6/23/20
20 3626 B06 6/23/20
21 3648 B07 6/23/20
22 3642 B08 6/23/20
23 3654 B09 6/23/20
24 3818 B10 6/23/20
No.Seq #Truss Name Date
25 4038 B11 6/23/20
26 3616 B12 6/23/20
27 3607 B13 6/23/20
28 3603 B14 6/23/20
29 3597 B15 6/23/20
30 3899 D01 6/23/20
31 2489 D02 6/23/20
32 2492 D03 6/23/20
33 4044 HJ7 6/23/20
34 3714 HJ7P 6/23/20
35 4047 J1 6/23/20
36 3702 J1P 6/23/20
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
Lumber design values are in accordance with ANSI/TPI 1-2014 section 6.3
These truss designs rely on lumber values established by others.
RE: Job 81126
Page 2 of 2
No.Seq #Truss Name Date
37 4066 J2 6/23/20
38 4069 J2A 6/23/20
39 4041 J3 6/23/20
40 3705 J3P 6/23/20
41 4050 J5 6/23/20
42 3708 J5P 6/23/20
43 3774 J7 6/23/20
44 3664 J7C 6/23/20
45 3896 J7P 6/23/20
46 3732 PB01 6/23/20
47 3738 PB04 6/23/20
48 3741 PB05 6/23/20
49 3735 PB3 6/23/20
50 4033 V01 6/23/20
51 4030 V02 6/23/20
52 4027 V03 6/23/20
53 2486 V04 6/23/20
54 STDL01 STD. DETAIL 6/23/20
55 STDL02 STD. DETAIL 6/23/20
56 STDL03 STD. DETAIL 6/23/20
57 STDL04 STD. DETAIL 6/23/20
58 STDL05 STD. DETAIL 6/23/20
59 STDL06 STD. DETAIL 6/23/20
60 STDL07 STD. DETAIL 6/23/20
61 STDL08 STD. DETAIL 6/23/20
62 STDL09 STD. DETAIL 6/23/20
63 STDL10 STD. DETAIL 6/23/20
64 STDL11 STD. DETAIL 6/23/20
65 STDL12 STD. DETAIL 6/23/20
66 STDL13 STD. DETAIL 6/23/20
67 STDL14 STD. DETAIL 6/23/20
68 STDL15 STD. DETAIL 6/23/20
69 STDL16 STD. DETAIL 6/23/20
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2 :T2, T5 2x4 SP M-30:
Bot chord 2x4 SP #2 :B4 2x4 SP M-30:
Webs 2x4 SP #3 :W1, W6, W12 2x6 SP #2:
:W11 2x4 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 62 plf at 0.00 to 62 plf at 45.60
TC: From 31 plf at 45.60 to 31 plf at 50.35
BC: From 20 plf at 0.00 to 20 plf at 45.60
BC: From 10 plf at 45.60 to 10 plf at 50.35
TC: 70 lb Conc. Load at 45.60,46.48
TC: 45 lb Conc. Load at 47.48,49.48
BC: 46 lb Conc. Load at 45.60,46.48
BC: -14 lb Conc. Load at 47.48,49.48
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 10.88 36.54
TC 24 43.21 50.35
BC 63 0.00 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
Negative reaction(s) of -230# MAX. from a non-wind load case requires uplift
connection. See Maximum Reactions.
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
V 451 /-230 /- /- /54 /-
R 2975 /- /- /- /1495 /-
W 1093 /- /- /- /736 /-
Wind reactions based on MWFRS
V Brg Width = 8.0 Min Req = 1.5
R Brg Width = 8.0 Min Req = 3.5
W Brg Width = 5.8 Min Req = 1.5
Bearings V, R, & W are a rigid surface.
Bearings V, R, & W require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 129 -150
B - C 194 -205
C - D 1038 -503
D - E 2200 -1157
E - F 2200 -1157
Chords Tens. Comp.
F - G 91 -387
G - H 91 -387
H - I 718 -1496
I - J 846 -1694
J - K 1706 -3182
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - U 117 -96
U - T 118 -576
T - S 425 -942
S - R 425 -942
R - Q 189 -336
Chords Tens. Comp.
Q - P 189 -336
P - O 920 -437
O - N 920 -437
N - M 3287 -1780
M - L 153 -132
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - U 106 -129
U - C 683 -277
C - T 335 -532
D - T 407 -54
D - R 874 -1763
E - R 387 -485
R - F 1198 -2336
F - P 1213 -509
Webs Tens. Comp.
P - H 628 -987
H - N 730 -349
N - I 308 0
N - J 1098 -1860
J - M 459 -653
M - K 3132 -1627
K - L 629 -1032
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 5.04 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Varies by Ld Case
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.204 J 999 360
VERT(CL): 0.419 J 929 240
HORZ(LL): 0.026 F - -
HORZ(TL): 0.054 F - -
Creep Factor: 2.0
Max TC CSI: 0.936
Max BC CSI: 0.959
Max Web CSI: 0.793
Wgt: 264.6 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A01
Truss Type
COMN
Qty
1
Ply
1 4072
06/23/2020
T2
T5
B4
W1
W6
W11 W12
(a)(a)
(a)
(a)A
B
C
D E F G H I
J K
LMNOPQRSTUVW
5
12
3X6(A1)2X4
3X6
3X4
5X8
3X4 4X6
2X4
4X12
4X6
4X6 4X6
4X4
3X4
4X6 4X10
5X6
5X6
6X6
6X6
3X6
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
10'10"8 25'8"6'8"7'1"12
50'4"4
4"1
2'1"14'10"745'7"4
70#
10"870#1'
45#
2'
45#
46#46#-14#-14#
10"8
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2 :T2, T5 2x4 SP M-30:
Bot chord 2x4 SP #2 :B4 2x4 SP M-30:
Webs 2x4 SP #3 :W1, W6, W12 2x6 SP #2:
:W11 2x4 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 62 plf at 0.00 to 62 plf at 45.60
TC: From 31 plf at 45.60 to 31 plf at 50.35
BC: From 20 plf at 0.00 to 20 plf at 45.60
BC: From 10 plf at 45.60 to 10 plf at 50.35
TC: 70 lb Conc. Load at 45.60,46.48
TC: 45 lb Conc. Load at 47.48,49.48
BC: 46 lb Conc. Load at 45.60,46.48
BC: -14 lb Conc. Load at 47.48,49.48
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 10.88 36.54
TC 24 43.21 50.35
BC 63 0.00 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
Negative reaction(s) of -230# MAX. from a non-wind load case requires uplift
connection. See Maximum Reactions.
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
V 451 /-230 /- /- /54 /-
R 2975 /- /- /- /1495 /-
W 1093 /- /- /- /736 /-
Wind reactions based on MWFRS
V Brg Width = 8.0 Min Req = 1.5
R Brg Width = 8.0 Min Req = 3.5
W Brg Width = 5.8 Min Req = 1.5
Bearings V, R, & W are a rigid surface.
Bearings V, R, & W require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 129 -150
B - C 194 -205
C - D 1038 -503
D - E 2200 -1157
E - F 2200 -1157
Chords Tens. Comp.
F - G 91 -387
G - H 91 -387
H - I 718 -1496
I - J 846 -1694
J - K 1706 -3182
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - U 117 -96
U - T 118 -576
T - S 425 -942
S - R 425 -942
R - Q 189 -336
Chords Tens. Comp.
Q - P 189 -336
P - O 920 -437
O - N 920 -437
N - M 3287 -1780
M - L 153 -132
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - U 106 -129
U - C 683 -277
C - T 335 -532
D - T 407 -54
D - R 874 -1763
E - R 387 -485
R - F 1198 -2336
F - P 1213 -509
Webs Tens. Comp.
P - H 628 -987
H - N 730 -349
N - I 308 0
N - J 1098 -1860
J - M 459 -653
M - K 3132 -1627
K - L 629 -1032
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 5.04 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Varies by Ld Case
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.204 J 999 360
VERT(CL): 0.419 J 929 240
HORZ(LL): 0.026 F - -
HORZ(TL): 0.054 F - -
Creep Factor: 2.0
Max TC CSI: 0.936
Max BC CSI: 0.959
Max Web CSI: 0.793
Wgt: 264.6 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A01
Truss Type
COMN
Qty
1
Ply
1 4072
06/23/2020
T2
T5
B4
W1
W6
W11 W12
(a)(a)
(a)
(a)A
B
C
D E F G H I
J K
LMNOPQRSTUVW
5
12
3X6(A1)2X4
3X6
3X4
5X8
3X4 4X6
2X4
4X12
4X6
4X6 4X6
4X4
3X4
4X6 4X10
5X6
5X6
6X6
6X6
3X6
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
10'10"8 25'8"6'8"7'1"12
50'4"4
4"1
2'1"14'10"745'7"4
70#
10"870#1'
45#
2'
45#
46#46#-14#-14#
10"8
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x6 SP #2 :T1 2x4 SP #2:
:T2 2x6 SP 2400f-2.0E:
Bot chord 2x6 SP #2 :B2 2x6 SP 2400f-2.0E:
:B3 2x4 SP 2400f-2.0E:
Webs 2x4 SP #3 :W2, W4 2x4 SP M-30:
:W3 2x8 SP 2400f-1.8E:
:Lt Slider 2x6 SP #2: BLOCK LENGTH = 2.200'
:Rt Slider 2x6 SP #2: BLOCK LENGTH = 1.500'
Bracing
(a) Continuous lateral restraint equally spaced on member.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 62 plf at 0.00 to 62 plf at 8.88
TC: From 31 plf at 8.88 to 31 plf at 38.54
TC: From 62 plf at 38.54 to 62 plf at 45.54
BC: From 20 plf at 0.00 to 20 plf at 8.91
BC: From 10 plf at 8.91 to 10 plf at 38.51
BC: From 20 plf at 38.51 to 20 plf at 45.54
TC: 285 lb Conc. Load at 8.91
TC: 175 lb Conc. Load at 10.94,12.94,14.94,16.94
18.94,20.94,22.94,24.48,26.48,28.48,30.48,32.48
34.48,36.48
TC: 290 lb Conc. Load at 38.51
BC: 302 lb Conc. Load at 8.91
BC: 109 lb Conc. Load at 10.94,12.94,14.94,16.94
18.94,20.94,22.94,24.48,26.48,28.48,30.48,32.48
34.48,36.48
BC: 315 lb Conc. Load at 38.51
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 8.88 38.54
BC 58 0.00 45.54
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads and reactions based on MWFRS.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
P 650 /- /- /- /508 /-
M 5223 /- /- /- /4684 /-
Q 1853 /- /- /- /1361 /-
Wind reactions based on MWFRS
P Brg Width = 8.0 Min Req = 1.5
M Brg Width = 8.0 Min Req = 4.3
Q Brg Width = 8.0 Min Req = 1.5
Bearings P, M, & Q are a rigid surface.
Bearings P, M, & Q require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 200 0
B - C 627 -476
C - D 2734 -2598
D - E 2732 -2596
Chords Tens. Comp.
E - F 1643 -2833
F - G 2364 -3136
G - H 2652 -3487
H - I 2810 -3665
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 366 -515
A - P 0 -130
O - N 344 -491
N - M 344 -491
Chords Tens. Comp.
M - L 1485 -795
L - K 3502 -2542
K - J 3501 -2542
J - I 3075 -2338
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
O - C 565 -614
C - M 3326 -3232
D - M 1357 -1179
M - E 3808 -4722
Webs Tens. Comp.
E - L 1986 -1242
L - F 1316 -986
F - J 204 -415
J - G 766 -318
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Varies by Ld Case
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.211 F 999 360
VERT(CL): 0.312 F 999 240
HORZ(LL): -0.093 H - -
HORZ(TL): 0.128 H - -
Creep Factor: 2.0
Max TC CSI: 0.939
Max BC CSI: 0.971
Max Web CSI: 0.898
Wgt: 262.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A02
Truss Type
HIPS
Qty
1
Ply
1 3911
06/23/2020
T1
T2
B2 B3
W2
W3 W4(a)(a)
A
B
C D E F G
H I
JKLMNOP Q
5
12
4X6(C6)
3X6(C6)
3X4
3X4
7X6
5X6
3X8
8X14
8X10
4X6 H0510
4X6
3X4
5X8(R)
4X6
3X4(E3)
3X10(E3)
1'10"8 16'27'8"
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
8'10"8 29'8"7'
45'6"8
4"1
1'1"74'0"78'10"14
285#
2'0"6175#
2'
175#
2'
175#
2'
175#
2'
175#
2'
175#
2'
175#1'6"8
175#
2'
175#
2'
175#
2'
175#
2'
175#
2'
175#
2'
175#
2'0"6290#
302#109#109#109#109#109#109#109#109#109#109#109#109#109#109#315#
7'0"6
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x6 SP #2 :T1 2x4 SP #2:
:T2 2x6 SP 2400f-2.0E:
Bot chord 2x6 SP #2 :B2 2x6 SP 2400f-2.0E:
:B3 2x4 SP 2400f-2.0E:
Webs 2x4 SP #3 :W2, W4 2x4 SP M-30:
:W3 2x8 SP 2400f-1.8E:
:Lt Slider 2x6 SP #2: BLOCK LENGTH = 2.200'
:Rt Slider 2x6 SP #2: BLOCK LENGTH = 1.500'
Bracing
(a) Continuous lateral restraint equally spaced on member.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 62 plf at 0.00 to 62 plf at 8.88
TC: From 31 plf at 8.88 to 31 plf at 38.54
TC: From 62 plf at 38.54 to 62 plf at 45.54
BC: From 20 plf at 0.00 to 20 plf at 8.91
BC: From 10 plf at 8.91 to 10 plf at 38.51
BC: From 20 plf at 38.51 to 20 plf at 45.54
TC: 285 lb Conc. Load at 8.91
TC: 175 lb Conc. Load at 10.94,12.94,14.94,16.94
18.94,20.94,22.94,24.48,26.48,28.48,30.48,32.48
34.48,36.48
TC: 290 lb Conc. Load at 38.51
BC: 302 lb Conc. Load at 8.91
BC: 109 lb Conc. Load at 10.94,12.94,14.94,16.94
18.94,20.94,22.94,24.48,26.48,28.48,30.48,32.48
34.48,36.48
BC: 315 lb Conc. Load at 38.51
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 8.88 38.54
BC 58 0.00 45.54
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads and reactions based on MWFRS.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
P 650 /- /- /- /508 /-
M 5223 /- /- /- /4684 /-
Q 1853 /- /- /- /1361 /-
Wind reactions based on MWFRS
P Brg Width = 8.0 Min Req = 1.5
M Brg Width = 8.0 Min Req = 4.3
Q Brg Width = 8.0 Min Req = 1.5
Bearings P, M, & Q are a rigid surface.
Bearings P, M, & Q require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 200 0
B - C 627 -476
C - D 2734 -2598
D - E 2732 -2596
Chords Tens. Comp.
E - F 1643 -2833
F - G 2364 -3136
G - H 2652 -3487
H - I 2810 -3665
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 366 -515
A - P 0 -130
O - N 344 -491
N - M 344 -491
Chords Tens. Comp.
M - L 1485 -795
L - K 3502 -2542
K - J 3501 -2542
J - I 3075 -2338
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
O - C 565 -614
C - M 3326 -3232
D - M 1357 -1179
M - E 3808 -4722
Webs Tens. Comp.
E - L 1986 -1242
L - F 1316 -986
F - J 204 -415
J - G 766 -318
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Varies by Ld Case
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.211 F 999 360
VERT(CL): 0.312 F 999 240
HORZ(LL): -0.093 H - -
HORZ(TL): 0.128 H - -
Creep Factor: 2.0
Max TC CSI: 0.939
Max BC CSI: 0.971
Max Web CSI: 0.898
Wgt: 262.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A02
Truss Type
HIPS
Qty
1
Ply
1 3911
06/23/2020
T1
T2
B2 B3
W2
W3 W4(a)(a)
A
B
C D E F G
H I
JKLMNOP Q
5
12
4X6(C6)
3X6(C6)
3X4
3X4
7X6
5X6
3X8
8X14
8X10
4X6 H0510
4X6
3X4
5X8(R)
4X6
3X4(E3)
3X10(E3)
1'10"8 16'27'8"
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
8'10"8 29'8"7'
45'6"8
4"1
1'1"74'0"78'10"14
285#
2'0"6175#
2'
175#
2'
175#
2'
175#
2'
175#
2'
175#
2'
175#1'6"8
175#
2'
175#
2'
175#
2'
175#
2'
175#
2'
175#
2'
175#
2'0"6290#
302#109#109#109#109#109#109#109#109#109#109#109#109#109#109#315#
7'0"6
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2 :T2 2x4 SP M-30:
Bot chord 2x4 SP #2 :B4 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Plating Notes
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 12.88 34.54
TC 24 41.21 50.35
BC 57 0.00 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
T 525 /-81 /- /746 /404 /217
Q 2745 /- /- /1659 /1259 /-
U 1093 /- /- /614 /518 /-
Wind reactions based on MWFRS
T Brg Width = 8.0 Min Req = 1.5
Q Brg Width = 8.0 Min Req = 3.2
U Brg Width = 5.8 Min Req = 1.5
Bearings T, Q, & U are a rigid surface.
Bearings T, Q, & U require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 214 -218
B - C 774 -635
C - D 877 -497
D - E 1466 -986
E - F 445 -559
Chords Tens. Comp.
F - G 445 -559
G - H 445 -559
H - I 1053 -1561
I - J 1667 -2534
J - K 4 -24
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - T 227 -171
T - S 94 -226
S - R 660 -670
R - Q 575 -790
Q - P 1139 -1373
Chords Tens. Comp.
P - O 1139 -1373
O - N 1377 -851
N - M 2581 -1715
M - L 1569 -1117
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
T - B 736 -517
B - S 644 -696
S - C 263 -309
C - R 819 -660
D - R 628 -860
D - Q 1428 -1210
Q - E 1285 -1705
E - O 2243 -1486
Webs Tens. Comp.
O - H 792 -1002
G - O 513 -538
H - N 654 -274
N - I 928 -1294
I - M 436 -427
M - J 1133 -645
J - L 1285 -1790
K - L 142 -120
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 6.50 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.132 I 999 360
VERT(CL): 0.273 I 999 240
HORZ(LL): -0.018 K - -
HORZ(TL): 0.041 K - -
Creep Factor: 2.0
Max TC CSI: 0.759
Max BC CSI: 0.979
Max Web CSI: 0.983
Wgt: 275.1 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A03
Truss Type
COMN
Qty
1
Ply
1 3887
06/23/2020
T2
B4
W1
(a)(a)(a)
(a)
A
B
C
D E F G H
I J K
LMNOPQRST U
5
12
3X6(A1)
3X6
5X6
5X6
4X6(R)
4X6
4X6
4X6
1.5X4
5X10
5X8
5X8
5X6 4X4 1.5X4
4X6(R)
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
12'10"8 21'8"6'8"9'1"12
50'4"4
4"1 2'11"15'8"7**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2 :T2 2x4 SP M-30:
Bot chord 2x4 SP #2 :B4 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Plating Notes
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 12.88 34.54
TC 24 41.21 50.35
BC 57 0.00 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
T 525 /-81 /- /746 /404 /217
Q 2745 /- /- /1659 /1259 /-
U 1093 /- /- /614 /518 /-
Wind reactions based on MWFRS
T Brg Width = 8.0 Min Req = 1.5
Q Brg Width = 8.0 Min Req = 3.2
U Brg Width = 5.8 Min Req = 1.5
Bearings T, Q, & U are a rigid surface.
Bearings T, Q, & U require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 214 -218
B - C 774 -635
C - D 877 -497
D - E 1466 -986
E - F 445 -559
Chords Tens. Comp.
F - G 445 -559
G - H 445 -559
H - I 1053 -1561
I - J 1667 -2534
J - K 4 -24
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - T 227 -171
T - S 94 -226
S - R 660 -670
R - Q 575 -790
Q - P 1139 -1373
Chords Tens. Comp.
P - O 1139 -1373
O - N 1377 -851
N - M 2581 -1715
M - L 1569 -1117
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
T - B 736 -517
B - S 644 -696
S - C 263 -309
C - R 819 -660
D - R 628 -860
D - Q 1428 -1210
Q - E 1285 -1705
E - O 2243 -1486
Webs Tens. Comp.
O - H 792 -1002
G - O 513 -538
H - N 654 -274
N - I 928 -1294
I - M 436 -427
M - J 1133 -645
J - L 1285 -1790
K - L 142 -120
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 6.50 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.132 I 999 360
VERT(CL): 0.273 I 999 240
HORZ(LL): -0.018 K - -
HORZ(TL): 0.041 K - -
Creep Factor: 2.0
Max TC CSI: 0.759
Max BC CSI: 0.979
Max Web CSI: 0.983
Wgt: 275.1 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A03
Truss Type
COMN
Qty
1
Ply
1 3887
06/23/2020
T2
B4
W1
(a)(a)(a)
(a)
A
B
C
D E F G H
I J K
LMNOPQRST U
5
12
3X6(A1)
3X6
5X6
5X6
4X6(R)
4X6
4X6
4X6
1.5X4
5X10
5X8
5X8
5X6 4X4 1.5X4
4X6(R)
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
12'10"8 21'8"6'8"9'1"12
50'4"4
4"1 2'11"15'8"7Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2 :B2, B4 2x4 SP 2400f-2.0E:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 14.88 32.54
TC 24 39.21 50.35
BC 59 0.00 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
V 508 /-84 /- /718 /371 /254
S 2762 /- /- /1721 /1263 /-
W 1092 /- /- /607 /519 /-
Wind reactions based on MWFRS
V Brg Width = 8.0 Min Req = 1.5
S Brg Width = 8.0 Min Req = 2.3
W Brg Width = 5.8 Min Req = 1.5
Bearings V, S, & W are a rigid surface.
Bearings V, S, & W require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 208 -230
B - C 737 -664
C - D 852 -651
D - E 868 -637
E - F 1303 -893
F - G 321 -309
Chords Tens. Comp.
G - H 321 -309
H - I 321 -310
I - J 860 -1252
J - K 1361 -2114
K - L 4 -27
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - V 230 -165
V - U 109 -279
U - T 109 -279
T - S 683 -918
S - R 1059 -1226
Chords Tens. Comp.
R - Q 1059 -1226
Q - P 1088 -670
P - O 2137 -1391
O - N 2137 -1391
N - M 1390 -995
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
V - B 715 -502
B - T 660 -663
C - T 557 -471
T - E 1069 -1536
E - S 1040 -1015
S - F 1223 -1653
F - Q 1943 -1324
Q - I 844 -1047
Webs Tens. Comp.
G - Q 457 -471
I - P 676 -329
P - J 812 -1182
J - N 352 -269
N - K 866 -438
K - M 1167 -1613
L - M 169 -143
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.105 J 999 360
VERT(CL): 0.220 J 999 240
HORZ(LL): -0.018 L - -
HORZ(TL): 0.037 L - -
Creep Factor: 2.0
Max TC CSI: 0.796
Max BC CSI: 0.993
Max Web CSI: 0.950
Wgt: 283.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A04
Truss Type
COMN
Qty
1
Ply
1 3872
06/23/2020
B2 B4
W1
(a)(a)(a)(a)
(a)(a)
A
B
C
D
E F G H I
J K L
MNOPQRSTUVW
5
12
3X6(A1)
3X4
3X6
3X6
1.5X4
3X10
3X6
5X6
4X6(R)
4X6
4X6
1.5X4
5X8
4X6
5X8
3X4 4X6
5X6
3X4
4X4 1.5X4
4X6(R)
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
14'10"8 17'8"6'8"11'1"12
50'4"4
4"1 3'9"16'6"7**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2 :B2, B4 2x4 SP 2400f-2.0E:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 14.88 32.54
TC 24 39.21 50.35
BC 59 0.00 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
V 508 /-84 /- /718 /371 /254
S 2762 /- /- /1721 /1263 /-
W 1092 /- /- /607 /519 /-
Wind reactions based on MWFRS
V Brg Width = 8.0 Min Req = 1.5
S Brg Width = 8.0 Min Req = 2.3
W Brg Width = 5.8 Min Req = 1.5
Bearings V, S, & W are a rigid surface.
Bearings V, S, & W require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 208 -230
B - C 737 -664
C - D 852 -651
D - E 868 -637
E - F 1303 -893
F - G 321 -309
Chords Tens. Comp.
G - H 321 -309
H - I 321 -310
I - J 860 -1252
J - K 1361 -2114
K - L 4 -27
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - V 230 -165
V - U 109 -279
U - T 109 -279
T - S 683 -918
S - R 1059 -1226
Chords Tens. Comp.
R - Q 1059 -1226
Q - P 1088 -670
P - O 2137 -1391
O - N 2137 -1391
N - M 1390 -995
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
V - B 715 -502
B - T 660 -663
C - T 557 -471
T - E 1069 -1536
E - S 1040 -1015
S - F 1223 -1653
F - Q 1943 -1324
Q - I 844 -1047
Webs Tens. Comp.
G - Q 457 -471
I - P 676 -329
P - J 812 -1182
J - N 352 -269
N - K 866 -438
K - M 1167 -1613
L - M 169 -143
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.105 J 999 360
VERT(CL): 0.220 J 999 240
HORZ(LL): -0.018 L - -
HORZ(TL): 0.037 L - -
Creep Factor: 2.0
Max TC CSI: 0.796
Max BC CSI: 0.993
Max Web CSI: 0.950
Wgt: 283.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A04
Truss Type
COMN
Qty
1
Ply
1 3872
06/23/2020
B2 B4
W1
(a)(a)(a)(a)
(a)(a)
A
B
C
D
E F G H I
J K L
MNOPQRSTUVW
5
12
3X6(A1)
3X4
3X6
3X6
1.5X4
3X10
3X6
5X6
4X6(R)
4X6
4X6
1.5X4
5X8
4X6
5X8
3X4 4X6
5X6
3X4
4X4 1.5X4
4X6(R)
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
14'10"8 17'8"6'8"11'1"12
50'4"4
4"1 3'9"16'6"7Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2 :T1 2x4 SP M-30:
Bot chord 2x4 SP #2 :B2 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Plating Notes
All plates are 3X6 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 16.88 30.54
TC 24 37.21 50.35
BC 64 0.00 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
V 499 /-92 /- /718 /365 /290
S 2776 /- /- /1756 /1283 /-
W 1088 /- /- /597 /508 /-
Wind reactions based on MWFRS
V Brg Width = 8.0 Min Req = 1.5
S Brg Width = 8.0 Min Req = 3.3
W Brg Width = 5.8 Min Req = 1.5
Bearings V, S, & W are a rigid surface.
Bearings V, S, & W require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 175 -116
B - C 602 -601
C - D 708 -586
D - E 732 -577
E - F 1187 -801
Chords Tens. Comp.
F - G 217 -100
G - H 217 -100
H - I 668 -967
I - J 1135 -1728
J - K 841 -1300
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - V 124 -134
V - U 175 -289
U - T 175 -289
T - S 909 -1074
S - R 970 -1117
R - Q 970 -1117
Chords Tens. Comp.
Q - P 821 -490
P - O 1737 -1151
O - N 1737 -1151
N - M 1350 -884
M - L 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
V - B 549 -401
B - T 525 -446
C - T 631 -547
T - E 1174 -1687
E - S 950 -941
S - F 1280 -1674
F - Q 1748 -1196
G - Q 390 -398
Webs Tens. Comp.
Q - H 851 -1101
H - P 731 -374
P - I 787 -1089
I - N 244 -137
N - J 461 -306
J - M 636 -728
M - K 1564 -1012
K - L 746 -1035
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.099 I 999 360
VERT(CL): 0.207 I 999 240
HORZ(LL): -0.022 K - -
HORZ(TL): 0.044 K - -
Creep Factor: 2.0
Max TC CSI: 0.848
Max BC CSI: 0.972
Max Web CSI: 0.997
Wgt: 304.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A05
Truss Type
COMN
Qty
1
Ply
1 3805
06/23/2020
T1
B2
W1
(a)(a)(a)(a)
(a)(a)
A
B
C
D
E F G H
I J K
LMNOPQRSTUVW
5
12
3X6(A1)
2X4
1.5X4
3X10
5X6
4X6(R)
4X6
4X6
1.5X4
5X8
6X6
3X4 4X6
5X6
3X4
3X4
4X4
4X4
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
16'10"8 13'8"6'8"13'1"12
50'4"4
4"1 4'7"17'4"7**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2 :T1 2x4 SP M-30:
Bot chord 2x4 SP #2 :B2 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Plating Notes
All plates are 3X6 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 16.88 30.54
TC 24 37.21 50.35
BC 64 0.00 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
V 499 /-92 /- /718 /365 /290
S 2776 /- /- /1756 /1283 /-
W 1088 /- /- /597 /508 /-
Wind reactions based on MWFRS
V Brg Width = 8.0 Min Req = 1.5
S Brg Width = 8.0 Min Req = 3.3
W Brg Width = 5.8 Min Req = 1.5
Bearings V, S, & W are a rigid surface.
Bearings V, S, & W require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 175 -116
B - C 602 -601
C - D 708 -586
D - E 732 -577
E - F 1187 -801
Chords Tens. Comp.
F - G 217 -100
G - H 217 -100
H - I 668 -967
I - J 1135 -1728
J - K 841 -1300
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - V 124 -134
V - U 175 -289
U - T 175 -289
T - S 909 -1074
S - R 970 -1117
R - Q 970 -1117
Chords Tens. Comp.
Q - P 821 -490
P - O 1737 -1151
O - N 1737 -1151
N - M 1350 -884
M - L 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
V - B 549 -401
B - T 525 -446
C - T 631 -547
T - E 1174 -1687
E - S 950 -941
S - F 1280 -1674
F - Q 1748 -1196
G - Q 390 -398
Webs Tens. Comp.
Q - H 851 -1101
H - P 731 -374
P - I 787 -1089
I - N 244 -137
N - J 461 -306
J - M 636 -728
M - K 1564 -1012
K - L 746 -1035
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.099 I 999 360
VERT(CL): 0.207 I 999 240
HORZ(LL): -0.022 K - -
HORZ(TL): 0.044 K - -
Creep Factor: 2.0
Max TC CSI: 0.848
Max BC CSI: 0.972
Max Web CSI: 0.997
Wgt: 304.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A05
Truss Type
COMN
Qty
1
Ply
1 3805
06/23/2020
T1
B2
W1
(a)(a)(a)(a)
(a)(a)
A
B
C
D
E F G H
I J K
LMNOPQRSTUVW
5
12
3X6(A1)
2X4
1.5X4
3X10
5X6
4X6(R)
4X6
4X6
1.5X4
5X8
6X6
3X4 4X6
5X6
3X4
3X4
4X4
4X4
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
16'10"8 13'8"6'8"13'1"12
50'4"4
4"1 4'7"17'4"7Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2 :B1, B4 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Plating Notes
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 18.88 28.54
TC 24 35.21 48.21
BC 72 0.00 18.21
BC 75 18.21 28.50
BC 103 28.50 38.79
BC 100 38.79 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
V 501 /-125 /- /739 /392 /321
W 2863 /- /- /1809 /1325 /-
X 1040 /- /- /598 /482 /-
Wind reactions based on MWFRS
V Brg Width = 8.0 Min Req = 1.5
W Brg Width = 8.0 Min Req = 3.4
X Brg Width = 5.8 Min Req = 1.5
Bearings V, W, & X are a rigid surface.
Bearings V, W, & X require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 161 -110
B - C 216 -72
C - D 723 -559
D - E 749 -547
E - F 1417 -965
F - G 1183 -754
Chords Tens. Comp.
G - H 570 -664
H - I 517 -798
I - J 877 -1319
J - K 882 -1325
K - L 354 -452
L - M 337 -506
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - U 119 -122
U - T 551 -510
T - S 492 -839
S - R 493 -839
Chords Tens. Comp.
R - Q 472 -329
Q - P 1599 -1063
P - O 1024 -691
O - N 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - U 298 -195
U - C 580 -568
C - T 375 -354
T - E 702 -974
E - R 1076 -775
R - F 644 -805
R - G 1106 -1559
G - Q 1297 -794
Q - H 307 -126
Webs Tens. Comp.
Q - I 831 -933
I - P 380 -360
P - J 220 -214
P - K 446 -170
K - O 621 -860
O - L 148 -40
O - M 951 -592
M - N 696 -1063
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.073 I 999 360
VERT(CL): 0.156 I 999 240
HORZ(LL): 0.021 O - -
HORZ(TL): 0.044 O - -
Creep Factor: 2.0
Max TC CSI: 0.951
Max BC CSI: 0.993
Max Web CSI: 0.952
Wgt: 297.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A06
Truss Type
COMN
Qty
1
Ply
1 3793
06/23/2020
B1
B4W1
(a)
A
B
C
D
E
F G H
I J K L
M
NOP
Q
RSTUVW X
5
12
3
12
3X6(A1)
2X4
3X6
3X6
4X6 6X12
5X6 4X4
5X10
5X6
5X6
6X8
1.5X4
4X8
5X6
3X6
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
18'10"8 9'8"6'8"13'2'1"12
18'2"8 10'3"8 10'3"8 11'6"12
50'4"4
4"1 4'6"65'5"12'6"148'2"7**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2 :B1, B4 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Plating Notes
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 18.88 28.54
TC 24 35.21 48.21
BC 72 0.00 18.21
BC 75 18.21 28.50
BC 103 28.50 38.79
BC 100 38.79 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
V 501 /-125 /- /739 /392 /321
W 2863 /- /- /1809 /1325 /-
X 1040 /- /- /598 /482 /-
Wind reactions based on MWFRS
V Brg Width = 8.0 Min Req = 1.5
W Brg Width = 8.0 Min Req = 3.4
X Brg Width = 5.8 Min Req = 1.5
Bearings V, W, & X are a rigid surface.
Bearings V, W, & X require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 161 -110
B - C 216 -72
C - D 723 -559
D - E 749 -547
E - F 1417 -965
F - G 1183 -754
Chords Tens. Comp.
G - H 570 -664
H - I 517 -798
I - J 877 -1319
J - K 882 -1325
K - L 354 -452
L - M 337 -506
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - U 119 -122
U - T 551 -510
T - S 492 -839
S - R 493 -839
Chords Tens. Comp.
R - Q 472 -329
Q - P 1599 -1063
P - O 1024 -691
O - N 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - U 298 -195
U - C 580 -568
C - T 375 -354
T - E 702 -974
E - R 1076 -775
R - F 644 -805
R - G 1106 -1559
G - Q 1297 -794
Q - H 307 -126
Webs Tens. Comp.
Q - I 831 -933
I - P 380 -360
P - J 220 -214
P - K 446 -170
K - O 621 -860
O - L 148 -40
O - M 951 -592
M - N 696 -1063
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.073 I 999 360
VERT(CL): 0.156 I 999 240
HORZ(LL): 0.021 O - -
HORZ(TL): 0.044 O - -
Creep Factor: 2.0
Max TC CSI: 0.951
Max BC CSI: 0.993
Max Web CSI: 0.952
Wgt: 297.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A06
Truss Type
COMN
Qty
1
Ply
1 3793
06/23/2020
B1
B4W1
(a)
A
B
C
D
E
F G H
I J K L
M
NOP
Q
RSTUVW X
5
12
3
12
3X6(A1)
2X4
3X6
3X6
4X6 6X12
5X6 4X4
5X10
5X6
5X6
6X8
1.5X4
4X8
5X6
3X6
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
18'10"8 9'8"6'8"13'2'1"12
18'2"8 10'3"8 10'3"8 11'6"12
50'4"4
4"1 4'6"65'5"12'6"148'2"7Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2 :B1 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Plating Notes
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 20.88 26.54
TC 24 33.21 46.21
BC 75 0.00 28.50
BC 89 28.50 38.79
BC 120 38.79 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
V 515 /-92 /- /734 /397 /353
W 2819 /- /- /1818 /1312 /-
X 1057 /- /- /627 /484 /-
Wind reactions based on MWFRS
V Brg Width = 8.0 Min Req = 1.5
W Brg Width = 8.0 Min Req = 3.3
X Brg Width = 5.8 Min Req = 1.5
Bearings V, W, & X are a rigid surface.
Bearings V, W, & X require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 165 -111
B - C 225 -74
C - D 666 -533
D - E 684 -517
E - F 1318 -920
F - G 1279 -789
Chords Tens. Comp.
G - H 386 -293
H - I 552 -804
I - J 874 -1194
J - K 884 -1205
K - L 535 -745
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - U 121 -126
U - T 564 -493
T - S 531 -784
S - R 531 -784
R - Q 760 -683
Chords Tens. Comp.
Q - P 360 -76
P - O 1409 -907
O - N 658 -433
N - M 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - U 288 -186
U - C 586 -546
C - T 413 -364
T - E 709 -971
E - R 1000 -706
F - R 406 -299
R - G 1216 -1797
G - Q 1354 -894
Q - H 940 -1198
Webs Tens. Comp.
H - P 1099 -622
P - I 793 -835
I - O 207 -216
O - J 411 -422
O - K 701 -388
K - N 500 -555
N - L 940 -618
L - M 750 -1028
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.079 I 999 360
VERT(CL): 0.169 I 999 240
HORZ(LL): 0.024 N - -
HORZ(TL): 0.050 N - -
Creep Factor: 2.0
Max TC CSI: 0.726
Max BC CSI: 0.996
Max Web CSI: 0.931
Wgt: 305.9 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A07
Truss Type
COMN
Qty
1
Ply
1 3862
06/23/2020
B1
W1
(a)
(a)
(a)
(a)
A
B
C
D
E
F
G H
I J K
L
MNO
P
Q
RSTUVW X
5
12
3
12
3X6(A1)
2X4
3X6 4X6
3X6
1.5X4
6X8
5X6
4X4
5X6
5X6
5X6
6X8
1.5X4 6X6
3X3(R)
3X6
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
20'10"8 5'8"6'8"13'4'1"12
18'2"8 10'3"8 10'3"8 11'6"12
50'4"4
4"1 4'6"66'3"12'6"149'0"7**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2 :B1 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Plating Notes
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 20.88 26.54
TC 24 33.21 46.21
BC 75 0.00 28.50
BC 89 28.50 38.79
BC 120 38.79 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
V 515 /-92 /- /734 /397 /353
W 2819 /- /- /1818 /1312 /-
X 1057 /- /- /627 /484 /-
Wind reactions based on MWFRS
V Brg Width = 8.0 Min Req = 1.5
W Brg Width = 8.0 Min Req = 3.3
X Brg Width = 5.8 Min Req = 1.5
Bearings V, W, & X are a rigid surface.
Bearings V, W, & X require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 165 -111
B - C 225 -74
C - D 666 -533
D - E 684 -517
E - F 1318 -920
F - G 1279 -789
Chords Tens. Comp.
G - H 386 -293
H - I 552 -804
I - J 874 -1194
J - K 884 -1205
K - L 535 -745
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - U 121 -126
U - T 564 -493
T - S 531 -784
S - R 531 -784
R - Q 760 -683
Chords Tens. Comp.
Q - P 360 -76
P - O 1409 -907
O - N 658 -433
N - M 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - U 288 -186
U - C 586 -546
C - T 413 -364
T - E 709 -971
E - R 1000 -706
F - R 406 -299
R - G 1216 -1797
G - Q 1354 -894
Q - H 940 -1198
Webs Tens. Comp.
H - P 1099 -622
P - I 793 -835
I - O 207 -216
O - J 411 -422
O - K 701 -388
K - N 500 -555
N - L 940 -618
L - M 750 -1028
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.079 I 999 360
VERT(CL): 0.169 I 999 240
HORZ(LL): 0.024 N - -
HORZ(TL): 0.050 N - -
Creep Factor: 2.0
Max TC CSI: 0.726
Max BC CSI: 0.996
Max Web CSI: 0.931
Wgt: 305.9 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A07
Truss Type
COMN
Qty
1
Ply
1 3862
06/23/2020
B1
W1
(a)
(a)
(a)
(a)
A
B
C
D
E
F
G H
I J K
L
MNO
P
Q
RSTUVW X
5
12
3
12
3X6(A1)
2X4
3X6 4X6
3X6
1.5X4
6X8
5X6
4X4
5X6
5X6
5X6
6X8
1.5X4 6X6
3X3(R)
3X6
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
20'10"8 5'8"6'8"13'4'1"12
18'2"8 10'3"8 10'3"8 11'6"12
50'4"4
4"1 4'6"66'3"12'6"149'0"7Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2 :B2 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Plating Notes
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 22.88 24.54
TC 24 31.21 44.21
BC 75 0.00 28.50
BC 98 28.50 38.79
BC 120 38.79 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
V 541 /-45 /- /731 /406 /385
W 2747 /- /- /1811 /1282 /-
X 1080 /- /- /656 /492 /-
Wind reactions based on MWFRS
V Brg Width = 8.0 Min Req = 1.5
W Brg Width = 8.0 Min Req = 3.2
X Brg Width = 5.8 Min Req = 1.5
Bearings V, W, & X are a rigid surface.
Bearings V, W, & X require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 166 -104
B - C 224 -67
C - D 594 -504
D - E 1131 -832
E - F 1210 -822
F - G 1196 -678
Chords Tens. Comp.
G - H 277 -87
H - I 680 -911
I - J 847 -1084
J - K 855 -1092
K - L 644 -910
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - U 114 -126
U - T 574 -480
T - S 574 -480
S - R 490 -698
R - Q 512 -253
Chords Tens. Comp.
Q - P 327 -71
P - O 1261 -753
O - N 783 -489
N - M 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - U 287 -188
U - C 621 -524
C - S 409 -346
S - D 713 -957
D - R 977 -688
F - R 450 -359
R - G 1197 -1908
G - Q 1195 -807
Q - H 922 -1175
Webs Tens. Comp.
H - P 1357 -842
P - I 827 -820
I - O 146 -155
O - J 388 -409
O - K 497 -250
N - L 950 -593
K - N 392 -430
L - M 773 -1026
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.079 I 999 360
VERT(CL): 0.168 I 999 240
HORZ(LL): 0.030 N - -
HORZ(TL): 0.062 N - -
Creep Factor: 2.0
Max TC CSI: 0.706
Max BC CSI: 0.983
Max Web CSI: 0.971
Wgt: 318.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A08
Truss Type
COMN
Qty
1
Ply
1 3890
06/23/2020
B2
W1
(a)
(a)
(a)(a)
(a)
(a)
A
B
C
D
E
F
G H
I J K
L
MNO
P
Q
RSTUVW X
5
12
3
12
3X6(A1)
2X4
3X6 3X6
4X6
1.5X4
6X8
5X6
4X4
5X6
5X6
5X6
6X8
1.5X4 6X6
3X4(R)
3X6
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
22'10"8 1'8"6'8"13'6'1"12
18'2"8 10'3"8 10'3"8 11'6"12
50'4"4
4"1 4'6"67'1"12'6"149'10"7**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2 :B2 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Plating Notes
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 22.88 24.54
TC 24 31.21 44.21
BC 75 0.00 28.50
BC 98 28.50 38.79
BC 120 38.79 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
V 541 /-45 /- /731 /406 /385
W 2747 /- /- /1811 /1282 /-
X 1080 /- /- /656 /492 /-
Wind reactions based on MWFRS
V Brg Width = 8.0 Min Req = 1.5
W Brg Width = 8.0 Min Req = 3.2
X Brg Width = 5.8 Min Req = 1.5
Bearings V, W, & X are a rigid surface.
Bearings V, W, & X require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 166 -104
B - C 224 -67
C - D 594 -504
D - E 1131 -832
E - F 1210 -822
F - G 1196 -678
Chords Tens. Comp.
G - H 277 -87
H - I 680 -911
I - J 847 -1084
J - K 855 -1092
K - L 644 -910
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - U 114 -126
U - T 574 -480
T - S 574 -480
S - R 490 -698
R - Q 512 -253
Chords Tens. Comp.
Q - P 327 -71
P - O 1261 -753
O - N 783 -489
N - M 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - U 287 -188
U - C 621 -524
C - S 409 -346
S - D 713 -957
D - R 977 -688
F - R 450 -359
R - G 1197 -1908
G - Q 1195 -807
Q - H 922 -1175
Webs Tens. Comp.
H - P 1357 -842
P - I 827 -820
I - O 146 -155
O - J 388 -409
O - K 497 -250
N - L 950 -593
K - N 392 -430
L - M 773 -1026
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.079 I 999 360
VERT(CL): 0.168 I 999 240
HORZ(LL): 0.030 N - -
HORZ(TL): 0.062 N - -
Creep Factor: 2.0
Max TC CSI: 0.706
Max BC CSI: 0.983
Max Web CSI: 0.971
Wgt: 318.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A08
Truss Type
COMN
Qty
1
Ply
1 3890
06/23/2020
B2
W1
(a)
(a)
(a)(a)
(a)
(a)
A
B
C
D
E
F
G H
I J K
L
MNO
P
Q
RSTUVW X
5
12
3
12
3X6(A1)
2X4
3X6 3X6
4X6
1.5X4
6X8
5X6
4X4
5X6
5X6
5X6
6X8
1.5X4 6X6
3X4(R)
3X6
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
22'10"8 1'8"6'8"13'6'1"12
18'2"8 10'3"8 10'3"8 11'6"12
50'4"4
4"1 4'6"67'1"12'6"149'10"7Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2 :T5 2x4 SP M-30:
Bot chord 2x4 SP #2 :B2, B4 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 29.21 42.21
BC 75 0.00 28.50
BC 120 28.50 38.79
BC 118 38.79 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
T 571 /- /- /730 /411 /398
U 2740 /- /- /1810 /1261 /-
V 1096 /- /- /679 /498 /-
Wind reactions based on MWFRS
T Brg Width = 8.0 Min Req = 1.5
U Brg Width = 8.0 Min Req = 3.2
V Brg Width = 5.8 Min Req = 1.5
Bearings T, U, & V are a rigid surface.
Bearings T, U, & V require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 176 -111
B - C 234 -74
C - D 597 -488
D - E 1050 -799
E - F 1128 -789
Chords Tens. Comp.
F - G 1122 -633
G - H 797 -1002
H - I 710 -952
I - J 768 -937
J - K 702 -1033
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - S 121 -135
S - R 575 -500
R - Q 575 -500
Q - P 449 -608
Chords Tens. Comp.
P - O 396 -151
O - N 1166 -665
N - M 881 -514
M - L 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - S 287 -190
S - C 654 -521
C - Q 402 -323
Q - D 711 -974
D - P 976 -697
F - P 479 -394
P - G 1240 -1888
G - O 1559 -995
Webs Tens. Comp.
O - H 668 -676
O - I 398 -266
I - N 242 -314
N - J 157 -33
J - M 332 -329
M - K 993 -579
K - L 771 -1027
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.067 H 999 360
VERT(CL): 0.141 H 999 240
HORZ(LL): 0.029 G - -
HORZ(TL): 0.061 G - -
Creep Factor: 2.0
Max TC CSI: 0.949
Max BC CSI: 0.997
Max Web CSI: 0.952
Wgt: 300.3 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A09
Truss Type
COMN
Qty
1
Ply
1 3852
06/23/2020
T5
B2
B4W1
(a)
(a)(a)
(a)
A
B
C
D
E
F
G
H I J
K
LMN
O
PQRSTU V
5
12
3
12
3X6(A1)
2X4
3X6 3X6
3X4
3X4
3X4
4X6
1.5X4
6X8
5X6
6X10
5X6
3X4
5X6
7X8
3X4
3X4(R)
3X6
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
23'8"8 5'6"13'8'1"12
18'2"8 10'3"8 10'3"8 11'6"12
50'4"4
4"1 4'6"67'11"12'6"1410'2"9**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2 :T5 2x4 SP M-30:
Bot chord 2x4 SP #2 :B2, B4 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 29.21 42.21
BC 75 0.00 28.50
BC 120 28.50 38.79
BC 118 38.79 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
T 571 /- /- /730 /411 /398
U 2740 /- /- /1810 /1261 /-
V 1096 /- /- /679 /498 /-
Wind reactions based on MWFRS
T Brg Width = 8.0 Min Req = 1.5
U Brg Width = 8.0 Min Req = 3.2
V Brg Width = 5.8 Min Req = 1.5
Bearings T, U, & V are a rigid surface.
Bearings T, U, & V require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 176 -111
B - C 234 -74
C - D 597 -488
D - E 1050 -799
E - F 1128 -789
Chords Tens. Comp.
F - G 1122 -633
G - H 797 -1002
H - I 710 -952
I - J 768 -937
J - K 702 -1033
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - S 121 -135
S - R 575 -500
R - Q 575 -500
Q - P 449 -608
Chords Tens. Comp.
P - O 396 -151
O - N 1166 -665
N - M 881 -514
M - L 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - S 287 -190
S - C 654 -521
C - Q 402 -323
Q - D 711 -974
D - P 976 -697
F - P 479 -394
P - G 1240 -1888
G - O 1559 -995
Webs Tens. Comp.
O - H 668 -676
O - I 398 -266
I - N 242 -314
N - J 157 -33
J - M 332 -329
M - K 993 -579
K - L 771 -1027
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.067 H 999 360
VERT(CL): 0.141 H 999 240
HORZ(LL): 0.029 G - -
HORZ(TL): 0.061 G - -
Creep Factor: 2.0
Max TC CSI: 0.949
Max BC CSI: 0.997
Max Web CSI: 0.952
Wgt: 300.3 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A09
Truss Type
COMN
Qty
1
Ply
1 3852
06/23/2020
T5
B2
B4W1
(a)
(a)(a)
(a)
A
B
C
D
E
F
G
H I J
K
LMN
O
PQRSTU V
5
12
3
12
3X6(A1)
2X4
3X6 3X6
3X4
3X4
3X4
4X6
1.5X4
6X8
5X6
6X10
5X6
3X4
5X6
7X8
3X4
3X4(R)
3X6
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
23'8"8 5'6"13'8'1"12
18'2"8 10'3"8 10'3"8 11'6"12
50'4"4
4"1 4'6"67'11"12'6"1410'2"9Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2 :B2, B4 2x4 SP M-30:
:B5 2x4 SP 2400f-2.0E:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Plating Notes
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 27.21 40.21
BC 75 0.00 28.50
BC 120 28.50 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
U 573 /- /- /730 /406 /398
V 2637 /- /- /1813 /799 /-
W 1118 /- /- /706 /266 /-
Wind reactions based on MWFRS
U Brg Width = 8.0 Min Req = 1.5
V Brg Width = 8.0 Min Req = 3.1
W Brg Width = 5.8 Min Req = 1.5
Bearings U, V, & W are a rigid surface.
Bearings U, V, & W require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 159 -110
B - C 217 -73
C - D 604 -468
D - E 957 -766
E - F 1035 -756
F - G 1029 -601
Chords Tens. Comp.
G - H 930 -1149
H - I 631 -852
I - J 753 -893
J - K 756 -1022
K - L 104 -48
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - T 120 -120
T - S 560 -522
S - R 560 -522
R - Q 382 -548
Chords Tens. Comp.
Q - P 362 -115
P - O 1092 -577
O - N 886 -437
N - M 726 -466
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - T 288 -188
T - C 660 -520
C - R 392 -320
R - D 711 -973
D - Q 973 -674
F - Q 479 -394
Q - G 1213 -1844
G - P 1716 -1113
Webs Tens. Comp.
H - P 691 -752
P - I 487 -330
I - O 215 -272
O - J 53 -157
J - N 240 -14
N - K 283 -44
K - M 750 -1167
L - M 184 -124
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.065 H 999 360
VERT(CL): 0.139 H 999 240
HORZ(LL): 0.028 M - -
HORZ(TL): 0.058 M - -
Creep Factor: 2.0
Max TC CSI: 0.756
Max BC CSI: 0.783
Max Web CSI: 0.929
Wgt: 315.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A10
Truss Type
COMN
Qty
1
Ply
1 3845
06/23/2020
B2
B4
B5
W1
(a)
(a)(a)
(a)(a)(a)
(a)
A
B
C
D
E
F
G
H I J
K
L
MNO
P
QRSTUV W
5
12
3
12
3X6(A1)
2X4
3X6 3X6
4X6
1.5X4
6X8
5X6
5X6
6X10
5X6
5X8
1.5X3
3X6(R)
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
23'8"8 3'6"13'10'1"12
18'2"8 10'3"8 10'3"8 11'6"12
50'4"4
4"1 4'6"68'9"12'6"1410'2"9**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2 :B2, B4 2x4 SP M-30:
:B5 2x4 SP 2400f-2.0E:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Plating Notes
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 27.21 40.21
BC 75 0.00 28.50
BC 120 28.50 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
U 573 /- /- /730 /406 /398
V 2637 /- /- /1813 /799 /-
W 1118 /- /- /706 /266 /-
Wind reactions based on MWFRS
U Brg Width = 8.0 Min Req = 1.5
V Brg Width = 8.0 Min Req = 3.1
W Brg Width = 5.8 Min Req = 1.5
Bearings U, V, & W are a rigid surface.
Bearings U, V, & W require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 159 -110
B - C 217 -73
C - D 604 -468
D - E 957 -766
E - F 1035 -756
F - G 1029 -601
Chords Tens. Comp.
G - H 930 -1149
H - I 631 -852
I - J 753 -893
J - K 756 -1022
K - L 104 -48
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - T 120 -120
T - S 560 -522
S - R 560 -522
R - Q 382 -548
Chords Tens. Comp.
Q - P 362 -115
P - O 1092 -577
O - N 886 -437
N - M 726 -466
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - T 288 -188
T - C 660 -520
C - R 392 -320
R - D 711 -973
D - Q 973 -674
F - Q 479 -394
Q - G 1213 -1844
G - P 1716 -1113
Webs Tens. Comp.
H - P 691 -752
P - I 487 -330
I - O 215 -272
O - J 53 -157
J - N 240 -14
N - K 283 -44
K - M 750 -1167
L - M 184 -124
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.065 H 999 360
VERT(CL): 0.139 H 999 240
HORZ(LL): 0.028 M - -
HORZ(TL): 0.058 M - -
Creep Factor: 2.0
Max TC CSI: 0.756
Max BC CSI: 0.783
Max Web CSI: 0.929
Wgt: 315.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A10
Truss Type
COMN
Qty
1
Ply
1 3845
06/23/2020
B2
B4
B5
W1
(a)
(a)(a)
(a)(a)(a)
(a)
A
B
C
D
E
F
G
H I J
K
L
MNO
P
QRSTUV W
5
12
3
12
3X6(A1)
2X4
3X6 3X6
4X6
1.5X4
6X8
5X6
5X6
6X10
5X6
5X8
1.5X3
3X6(R)
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
23'8"8 3'6"13'10'1"12
18'2"8 10'3"8 10'3"8 11'6"12
50'4"4
4"1 4'6"68'9"12'6"1410'2"9Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2 :B2, B4 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Plating Notes
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 22.21 38.21
BC 75 0.00 28.50
BC 120 28.50 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
W 607 /- /- /727 /397 /399
X 2513 /- /- /1794 /757 /-
Y 1163 /- /- /744 /260 /-
Wind reactions based on MWFRS
W Brg Width = 8.0 Min Req = 1.5
X Brg Width = 8.0 Min Req = 3.0
Y Brg Width = 5.8 Min Req = 1.5
Bearings W, X, & Y are a rigid surface.
Bearings W, X, & Y require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 157 -106
B - C 210 -68
C - D 659 -431
D - E 776 -641
E - F 854 -630
F - G 848 -512
G - H 57 -72
Chords Tens. Comp.
G - I 727 -916
H - I 17 -32
I - J 725 -927
J - K 725 -927
K - L 792 -898
L - M 793 -1057
M - N 625 -959
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - V 115 -118
V - U 550 -590
U - T 550 -590
T - S 302 -370
Chords Tens. Comp.
S - R 367 -169
R - Q 1058 -522
Q - P 854 -495
P - O 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - V 292 -189
V - C 706 -543
C - T 354 -280
T - D 711 -962
D - S 982 -681
F - S 334 -294
S - G 1113 -1714
G - R 1304 -744
Webs Tens. Comp.
J - R 400 -367
R - K 341 -178
K - Q 185 -202
L - Q 159 0
Q - M 138 -55
M - P 419 -515
P - N 1045 -600
N - O 770 -1115
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.089 I 999 360
VERT(CL): 0.180 I 999 240
HORZ(LL): 0.032 H - -
HORZ(TL): 0.066 H - -
Creep Factor: 2.0
Max TC CSI: 0.634
Max BC CSI: 0.800
Max Web CSI: 0.927
Wgt: 318.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A11
Truss Type
COMN
Qty
1
Ply
1 3839
06/23/2020
B2
B4W1
(a)
(a)(a)
(a)
A
B
C
D
E
F
G
H
I J K L
M
N
OPQ
R
STUVWX Y
5
12
3
12
3X6(A1)
2X4
3X6 3X6
4X6
1.5X4
6X8
4X8
4X6
1.5X4 1.5X4
5X8
5X6
5X10
3X4(R)
3X6
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
23'8"8 2'2"14 13'12'1"12
18'2"8 10'3"8 10'3"8 11'6"12
50'4"4
4"1 4'6"62'6"1410'2"9**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2 :B2, B4 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Plating Notes
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 22.21 38.21
BC 75 0.00 28.50
BC 120 28.50 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
W 607 /- /- /727 /397 /399
X 2513 /- /- /1794 /757 /-
Y 1163 /- /- /744 /260 /-
Wind reactions based on MWFRS
W Brg Width = 8.0 Min Req = 1.5
X Brg Width = 8.0 Min Req = 3.0
Y Brg Width = 5.8 Min Req = 1.5
Bearings W, X, & Y are a rigid surface.
Bearings W, X, & Y require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 157 -106
B - C 210 -68
C - D 659 -431
D - E 776 -641
E - F 854 -630
F - G 848 -512
G - H 57 -72
Chords Tens. Comp.
G - I 727 -916
H - I 17 -32
I - J 725 -927
J - K 725 -927
K - L 792 -898
L - M 793 -1057
M - N 625 -959
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - V 115 -118
V - U 550 -590
U - T 550 -590
T - S 302 -370
Chords Tens. Comp.
S - R 367 -169
R - Q 1058 -522
Q - P 854 -495
P - O 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - V 292 -189
V - C 706 -543
C - T 354 -280
T - D 711 -962
D - S 982 -681
F - S 334 -294
S - G 1113 -1714
G - R 1304 -744
Webs Tens. Comp.
J - R 400 -367
R - K 341 -178
K - Q 185 -202
L - Q 159 0
Q - M 138 -55
M - P 419 -515
P - N 1045 -600
N - O 770 -1115
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.089 I 999 360
VERT(CL): 0.180 I 999 240
HORZ(LL): 0.032 H - -
HORZ(TL): 0.066 H - -
Creep Factor: 2.0
Max TC CSI: 0.634
Max BC CSI: 0.800
Max Web CSI: 0.927
Wgt: 318.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A11
Truss Type
COMN
Qty
1
Ply
1 3839
06/23/2020
B2
B4W1
(a)
(a)(a)
(a)
A
B
C
D
E
F
G
H
I J K L
M
N
OPQ
R
STUVWX Y
5
12
3
12
3X6(A1)
2X4
3X6 3X6
4X6
1.5X4
6X8
4X8
4X6
1.5X4 1.5X4
5X8
5X6
5X10
3X4(R)
3X6
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
23'8"8 2'2"14 13'12'1"12
18'2"8 10'3"8 10'3"8 11'6"12
50'4"4
4"1 4'6"62'6"1410'2"9Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2 :T3 2x6 SP 2400f-2.0E:
:T4 2x4 SP M-30:
Bot chord 2x4 SP #2 :B2, B4 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 24.21 36.21
BC 75 0.00 18.21
BC 118 18.21 28.50
BC 120 28.50 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
S 658 /- /- /739 /384 /405
T 2351 /- /- /1733 /727 /-
U 1218 /- /- /786 /277 /-
Wind reactions based on MWFRS
S Brg Width = 8.0 Min Req = 1.5
T Brg Width = 8.0 Min Req = 2.8
U Brg Width = 5.8 Min Req = 1.5
Bearings S, T, & U are a rigid surface.
Bearings S, T, & U require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 155 -105
B - C 207 -67
C - D 709 -454
D - E 526 -500
E - F 604 -490
Chords Tens. Comp.
F - G 600 -328
G - H 672 -857
H - I 837 -1132
I - J 650 -1014
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - R 114 -116
R - Q 592 -647
Q - P 592 -647
P - O 288 -242
Chords Tens. Comp.
O - N 481 -122
N - M 1063 -514
M - L 907 -520
L - K 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - R 290 -190
R - C 754 -631
C - P 336 -243
P - D 708 -957
D - O 942 -655
F - O 496 -417
O - G 1040 -1655
Webs Tens. Comp.
G - N 846 -344
N - H 515 -269
H - M 194 -155
M - I 154 -56
I - L 437 -553
L - J 1109 -630
J - K 795 -1171
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.040 H 999 360
VERT(CL): 0.084 H 999 240
HORZ(LL): 0.025 L - -
HORZ(TL): 0.052 L - -
Creep Factor: 2.0
Max TC CSI: 0.724
Max BC CSI: 0.971
Max Web CSI: 0.892
Wgt: 308.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A12
Truss Type
COMN
Qty
1
Ply
1 3833
06/23/2020
T3
T4
B2
B4W1
(a)
(a)(a)
(a)
A
B
C
D
E
F
G H
I
J
KLM
N
OPQRST U
5
12
3
12
3X6(A1)
2X4
3X6 3X6
3X4
3X4
3X4
4X6
1.5X4
6X8
6X6
5X6
7X6
5X6
3X4
3X4
3X4(R)
3X6
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
24'2"8 12'14'1"12
18'2"8 10'3"8 10'3"8 11'6"12
50'4"4
4"1 4'6"62'6"1410'5"1**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2 :T3 2x6 SP 2400f-2.0E:
:T4 2x4 SP M-30:
Bot chord 2x4 SP #2 :B2, B4 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 24.21 36.21
BC 75 0.00 18.21
BC 118 18.21 28.50
BC 120 28.50 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
S 658 /- /- /739 /384 /405
T 2351 /- /- /1733 /727 /-
U 1218 /- /- /786 /277 /-
Wind reactions based on MWFRS
S Brg Width = 8.0 Min Req = 1.5
T Brg Width = 8.0 Min Req = 2.8
U Brg Width = 5.8 Min Req = 1.5
Bearings S, T, & U are a rigid surface.
Bearings S, T, & U require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 155 -105
B - C 207 -67
C - D 709 -454
D - E 526 -500
E - F 604 -490
Chords Tens. Comp.
F - G 600 -328
G - H 672 -857
H - I 837 -1132
I - J 650 -1014
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - R 114 -116
R - Q 592 -647
Q - P 592 -647
P - O 288 -242
Chords Tens. Comp.
O - N 481 -122
N - M 1063 -514
M - L 907 -520
L - K 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - R 290 -190
R - C 754 -631
C - P 336 -243
P - D 708 -957
D - O 942 -655
F - O 496 -417
O - G 1040 -1655
Webs Tens. Comp.
G - N 846 -344
N - H 515 -269
H - M 194 -155
M - I 154 -56
I - L 437 -553
L - J 1109 -630
J - K 795 -1171
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.040 H 999 360
VERT(CL): 0.084 H 999 240
HORZ(LL): 0.025 L - -
HORZ(TL): 0.052 L - -
Creep Factor: 2.0
Max TC CSI: 0.724
Max BC CSI: 0.971
Max Web CSI: 0.892
Wgt: 308.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A12
Truss Type
COMN
Qty
1
Ply
1 3833
06/23/2020
T3
T4
B2
B4W1
(a)
(a)(a)
(a)
A
B
C
D
E
F
G H
I
J
KLM
N
OPQRST U
5
12
3
12
3X6(A1)
2X4
3X6 3X6
3X4
3X4
3X4
4X6
1.5X4
6X8
6X6
5X6
7X6
5X6
3X4
3X4
3X4(R)
3X6
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
24'2"8 12'14'1"12
18'2"8 10'3"8 10'3"8 11'6"12
50'4"4
4"1 4'6"62'6"1410'5"1Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2 :T2, T5 2x4 SP M-30:
Bot chord 2x4 SP M-30 :B1, B4 2x4 SP #2:
Webs 2x4 SP #3 :W1 2x6 SP #2:
:W7 2x4 SP M-30:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 26.21 34.21
BC 75 0.00 18.21
BC 120 18.21 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
T 660 /- /- /732 /384 /437
U 2435 /- /- /1755 /721 /-
V 1204 /- /- /786 /270 /-
Wind reactions based on MWFRS
T Brg Width = 8.0 Min Req = 1.5
U Brg Width = 8.0 Min Req = 2.9
V Brg Width = 5.8 Min Req = 1.5
Bearings T, U, & V are a rigid surface.
Bearings T, U, & V require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 171 -107
B - C 226 -70
C - D 667 -440
D - E 580 -556
E - F 659 -546
Chords Tens. Comp.
F - G 668 -347
G - H 690 -796
H - I 851 -1020
I - J 830 -1109
J - K 693 -1105
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - S 117 -131
S - R 604 -609
R - Q 604 -609
Q - P 315 -271
Chords Tens. Comp.
P - O 626 -162
O - N 978 -421
N - M 975 -534
M - L 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - S 285 -190
S - C 720 -664
C - Q 359 -249
Q - D 710 -961
D - P 910 -636
F - P 589 -514
P - G 1060 -1762
Webs Tens. Comp.
G - O 821 -355
O - H 509 -280
H - N 165 -81
N - J 249 -139
J - M 373 -459
M - K 1119 -608
K - L 782 -1143
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.043 H 999 360
VERT(CL): 0.089 H 999 240
HORZ(LL): 0.025 M - -
HORZ(TL): 0.051 M - -
Creep Factor: 2.0
Max TC CSI: 0.935
Max BC CSI: 0.679
Max Web CSI: 0.971
Wgt: 304.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A13
Truss Type
COMN
Qty
1
Ply
1 3893
06/23/2020
T2
T5
B1
B4
W1
W7
(a)
(a)
(a)
A
B
C
D
E
F
G H
I
J
K
LMN
O
PQRSTU V
5
12
3
12
3X6(A1)
2X4
3X6
3X6
3X4
3X4
3X4
4X6
1.5X4
6X8
5X6
5X6
7X6
5X6
3X6
3X4
3X4
3X4(R)
3X6
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
26'2"8 8'16'1"12
18'2"8 10'3"8 10'3"8 11'6"12
50'4"4
4"1 4'6"62'6"1411'3"1**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2 :T2, T5 2x4 SP M-30:
Bot chord 2x4 SP M-30 :B1, B4 2x4 SP #2:
Webs 2x4 SP #3 :W1 2x6 SP #2:
:W7 2x4 SP M-30:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 26.21 34.21
BC 75 0.00 18.21
BC 120 18.21 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
T 660 /- /- /732 /384 /437
U 2435 /- /- /1755 /721 /-
V 1204 /- /- /786 /270 /-
Wind reactions based on MWFRS
T Brg Width = 8.0 Min Req = 1.5
U Brg Width = 8.0 Min Req = 2.9
V Brg Width = 5.8 Min Req = 1.5
Bearings T, U, & V are a rigid surface.
Bearings T, U, & V require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 171 -107
B - C 226 -70
C - D 667 -440
D - E 580 -556
E - F 659 -546
Chords Tens. Comp.
F - G 668 -347
G - H 690 -796
H - I 851 -1020
I - J 830 -1109
J - K 693 -1105
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - S 117 -131
S - R 604 -609
R - Q 604 -609
Q - P 315 -271
Chords Tens. Comp.
P - O 626 -162
O - N 978 -421
N - M 975 -534
M - L 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - S 285 -190
S - C 720 -664
C - Q 359 -249
Q - D 710 -961
D - P 910 -636
F - P 589 -514
P - G 1060 -1762
Webs Tens. Comp.
G - O 821 -355
O - H 509 -280
H - N 165 -81
N - J 249 -139
J - M 373 -459
M - K 1119 -608
K - L 782 -1143
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.043 H 999 360
VERT(CL): 0.089 H 999 240
HORZ(LL): 0.025 M - -
HORZ(TL): 0.051 M - -
Creep Factor: 2.0
Max TC CSI: 0.935
Max BC CSI: 0.679
Max Web CSI: 0.971
Wgt: 304.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A13
Truss Type
COMN
Qty
1
Ply
1 3893
06/23/2020
T2
T5
B1
B4
W1
W7
(a)
(a)
(a)
A
B
C
D
E
F
G H
I
J
K
LMN
O
PQRSTU V
5
12
3
12
3X6(A1)
2X4
3X6
3X6
3X4
3X4
3X4
4X6
1.5X4
6X8
5X6
5X6
7X6
5X6
3X6
3X4
3X4
3X4(R)
3X6
1'10"8 16'32'5"12
SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ.
26'2"8 8'16'1"12
18'2"8 10'3"8 10'3"8 11'6"12
50'4"4
4"1 4'6"62'6"1411'3"1Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2 :T1 2x4 SP M-30:
Bot chord 2x4 SP #2 :B3 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 24.39 36.02
BC 75 0.00 18.21
BC 118 18.21 28.50
BC 120 28.50 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
R 300 /-118 /- /386 /276 /409
P 2376 /- /- /1584 /747 /-
S 1633 /- /- /950 /392 /-
Wind reactions based on MWFRS
R Brg Width = 8.0 Min Req = 1.5
P Brg Width = 8.0 Min Req = 2.8
S Brg Width = 5.8 Min Req = 1.9
Bearings R, P, & S are a rigid surface.
Bearings R, P, & S require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 160 -77
B - C 678 -500
C - D 998 -1624
D - E 1012 -1496
E - F 1238 -1594
Chords Tens. Comp.
F - G 1600 -2164
G - H 1600 -2164
H - I 1218 -1703
I - J 913 -1404
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - R 68 -117
R - Q 308 -385
Q - P 308 -385
P - O 238 -433
Chords Tens. Comp.
O - N 1789 -1003
N - M 1681 -935
M - L 1281 -773
L - K 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - B 217 -211
B - P 636 -562
P - C 1464 -2125
C - O 1998 -1162
E - O 556 -506
O - F 322 -623
F - N 960 -517
Webs Tens. Comp.
G - N 358 -362
N - H 798 -422
H - M 359 -478
M - I 305 -99
I - L 623 -827
L - J 1564 -939
J - K 1072 -1584
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.118 G 999 360
VERT(CL): 0.242 G 999 247
HORZ(LL): 0.046 L - -
HORZ(TL): 0.095 L - -
Creep Factor: 2.0
Max TC CSI: 0.836
Max BC CSI: 0.994
Max Web CSI: 0.939
Wgt: 310.1 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A14
Truss Type
COMN
Qty
6
Ply
1 2478
06/23/2020
T1
B3 B3W1
(a)
(a)(a)
A
B
C
D
E
F G H
I
J
KLM
N
OPQR S
5
12
3
12
3X6(A1)
2X4
3X6
3X6 4X6
4X6
4X6
1.5X4
5X10
5X6 1.5X4
5X8
5X6
5X6
3X4
4X4
4X4(R)
3X6
1'10"8 7'4"41'1"12
SEAT PLATE REQ. SEAT PLATE REQ.SEAT PLATE REQ.
24'4"11 11'7"10 14'3"15
18'2"8 10'3"8 10'3"8 11'6"12
50'4"4
4"1 4'6"62'6"1410'6"**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2 :T1 2x4 SP M-30:
Bot chord 2x4 SP #2 :B3 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 24.39 36.02
BC 75 0.00 18.21
BC 118 18.21 28.50
BC 120 28.50 50.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
WARNING: Furnish a copy of this DWG to the installation contractor. Special care
must be taken during handling, shipping and installation of trusses. See
"WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
R 300 /-118 /- /386 /276 /409
P 2376 /- /- /1584 /747 /-
S 1633 /- /- /950 /392 /-
Wind reactions based on MWFRS
R Brg Width = 8.0 Min Req = 1.5
P Brg Width = 8.0 Min Req = 2.8
S Brg Width = 5.8 Min Req = 1.9
Bearings R, P, & S are a rigid surface.
Bearings R, P, & S require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 160 -77
B - C 678 -500
C - D 998 -1624
D - E 1012 -1496
E - F 1238 -1594
Chords Tens. Comp.
F - G 1600 -2164
G - H 1600 -2164
H - I 1218 -1703
I - J 913 -1404
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - R 68 -117
R - Q 308 -385
Q - P 308 -385
P - O 238 -433
Chords Tens. Comp.
O - N 1789 -1003
N - M 1681 -935
M - L 1281 -773
L - K 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - B 217 -211
B - P 636 -562
P - C 1464 -2125
C - O 1998 -1162
E - O 556 -506
O - F 322 -623
F - N 960 -517
Webs Tens. Comp.
G - N 358 -362
N - H 798 -422
H - M 359 -478
M - I 305 -99
I - L 623 -827
L - J 1564 -939
J - K 1072 -1584
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 5.04 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.118 G 999 360
VERT(CL): 0.242 G 999 247
HORZ(LL): 0.046 L - -
HORZ(TL): 0.095 L - -
Creep Factor: 2.0
Max TC CSI: 0.836
Max BC CSI: 0.994
Max Web CSI: 0.939
Wgt: 310.1 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
A14
Truss Type
COMN
Qty
6
Ply
1 2478
06/23/2020
T1
B3 B3W1
(a)
(a)(a)
A
B
C
D
E
F G H
I
J
KLM
N
OPQR S
5
12
3
12
3X6(A1)
2X4
3X6
3X6 4X6
4X6
4X6
1.5X4
5X10
5X6 1.5X4
5X8
5X6
5X6
3X4
4X4
4X4(R)
3X6
1'10"8 7'4"41'1"12
SEAT PLATE REQ. SEAT PLATE REQ.SEAT PLATE REQ.
24'4"11 11'7"10 14'3"15
18'2"8 10'3"8 10'3"8 11'6"12
50'4"4
4"1 4'6"62'6"1410'6"Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP M-30 :T1 2x4 SP #2:
Bot chord 2x4 SP #2 :B2 2x6 SP 2400f-2.0E:
Webs 2x4 SP #3 :W1, W10 2x6 SP #2:
:W2, W4 2x4 SP #2:
:W8 2x4 SP M-30:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 62 plf at 0.00 to 62 plf at 8.88
TC: From 31 plf at 8.88 to 31 plf at 26.54
BC: From 20 plf at 0.00 to 20 plf at 8.91
BC: From 10 plf at 8.91 to 10 plf at 26.08
BC: From 20 plf at 26.08 to 20 plf at 26.54
TC: 290 lb Conc. Load at 8.91
TC: 175 lb Conc. Load at 10.94,12.94,24.94,25.81
TC: 183 lb Conc. Load at 14.94,16.94,18.94,20.94
22.94
BC: 315 lb Conc. Load at 8.91
BC: 109 lb Conc. Load at 10.94,12.94,24.94,25.81
BC: 117 lb Conc. Load at 14.94,16.94,18.94,20.94
22.94
Plating Notes
All plates are 3X6 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 8.88 26.54
BC 75 0.00 13.65
BC 60 13.69 26.54
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
P 2196 /- /- /- /1655 /-
Q 2499 /- /- /- /1695 /-
Wind reactions based on MWFRS
P Brg Width = 8.0 Min Req = 2.6
Q Brg Width = 8.0 Min Req = 2.9
Bearings P & Q are a rigid surface.
Bearings P & Q require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 63 -177
B - C 2715 -3494
C - D 3815 -5335
Chords Tens. Comp.
D - E 2918 -4475
E - F 2918 -4475
F - G 2918 -4475
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - P 186 -59
P - O 519 -344
O - N 176 -132
M - L 5389 -3853
Chords Tens. Comp.
L - J 134 -113
K - H 12 -35
J - I 169 -125
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
P - B 1712 -2088
B - O 2724 -2111
C - O 562 -591
C - M 2524 -1608
O - M 3029 -2335
M - N 152 -11
M - D 263 -248
Webs Tens. Comp.
D - L 1019 -995
F - L 799 -867
L - G 4680 -3025
K - J 98 0
I - G 1669 -2213
I - H 1678 -2348
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Varies by Ld Case
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.279 D 999 360
VERT(CL): 0.430 D 679 240
HORZ(LL): -0.078 K - -
HORZ(TL): 0.129 K - -
Creep Factor: 2.0
Max TC CSI: 0.997
Max BC CSI: 0.966
Max Web CSI: 0.961
Wgt: 164.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B01
Truss Type
HIPM
Qty
1
Ply
1 3780
06/23/2020
T1
B2W1W2W4
W8
W10(a)
(a)
A
B
C D E F G
HIJKL
M NOP Q
5
12
2X4(A1)
5X6
5X14
7X8
H0710
3X4 4X6 3X4
8X12
1.5X4
1.5X3
3X3
6X8
1'10"8 24'8"
SEAT PLATE REQ.SEAT PLATE REQ.
8'10"8 17'8"
13'9"8 10'7"8 2'1"8
26'6"8
4"1 4'0"71'8'10"14
290#
2'0"6
175#
2'
175#
2'
183#
2'
183#
2'
183#
2'
183#
2'
183#
2'
175#
10"8175#
315#109#109#117#117#117#117#117#109#109#
8"12
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP M-30 :T1 2x4 SP #2:
Bot chord 2x4 SP #2 :B2 2x6 SP 2400f-2.0E:
Webs 2x4 SP #3 :W1, W10 2x6 SP #2:
:W2, W4 2x4 SP #2:
:W8 2x4 SP M-30:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 62 plf at 0.00 to 62 plf at 8.88
TC: From 31 plf at 8.88 to 31 plf at 26.54
BC: From 20 plf at 0.00 to 20 plf at 8.91
BC: From 10 plf at 8.91 to 10 plf at 26.08
BC: From 20 plf at 26.08 to 20 plf at 26.54
TC: 290 lb Conc. Load at 8.91
TC: 175 lb Conc. Load at 10.94,12.94,24.94,25.81
TC: 183 lb Conc. Load at 14.94,16.94,18.94,20.94
22.94
BC: 315 lb Conc. Load at 8.91
BC: 109 lb Conc. Load at 10.94,12.94,24.94,25.81
BC: 117 lb Conc. Load at 14.94,16.94,18.94,20.94
22.94
Plating Notes
All plates are 3X6 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 8.88 26.54
BC 75 0.00 13.65
BC 60 13.69 26.54
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
P 2196 /- /- /- /1655 /-
Q 2499 /- /- /- /1695 /-
Wind reactions based on MWFRS
P Brg Width = 8.0 Min Req = 2.6
Q Brg Width = 8.0 Min Req = 2.9
Bearings P & Q are a rigid surface.
Bearings P & Q require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 63 -177
B - C 2715 -3494
C - D 3815 -5335
Chords Tens. Comp.
D - E 2918 -4475
E - F 2918 -4475
F - G 2918 -4475
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - P 186 -59
P - O 519 -344
O - N 176 -132
M - L 5389 -3853
Chords Tens. Comp.
L - J 134 -113
K - H 12 -35
J - I 169 -125
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
P - B 1712 -2088
B - O 2724 -2111
C - O 562 -591
C - M 2524 -1608
O - M 3029 -2335
M - N 152 -11
M - D 263 -248
Webs Tens. Comp.
D - L 1019 -995
F - L 799 -867
L - G 4680 -3025
K - J 98 0
I - G 1669 -2213
I - H 1678 -2348
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 13.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Varies by Ld Case
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.279 D 999 360
VERT(CL): 0.430 D 679 240
HORZ(LL): -0.078 K - -
HORZ(TL): 0.129 K - -
Creep Factor: 2.0
Max TC CSI: 0.997
Max BC CSI: 0.966
Max Web CSI: 0.961
Wgt: 164.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B01
Truss Type
HIPM
Qty
1
Ply
1 3780
06/23/2020
T1
B2W1W2W4
W8
W10(a)
(a)
A
B
C D E F G
HIJKL
M NOP Q
5
12
2X4(A1)
5X6
5X14
7X8
H0710
3X4 4X6 3X4
8X12
1.5X4
1.5X3
3X3
6X8
1'10"8 24'8"
SEAT PLATE REQ.SEAT PLATE REQ.
8'10"8 17'8"
13'9"8 10'7"8 2'1"8
26'6"8
4"1 4'0"71'8'10"14
290#
2'0"6
175#
2'
175#
2'
183#
2'
183#
2'
183#
2'
183#
2'
183#
2'
175#
10"8175#
315#109#109#117#117#117#117#117#109#109#
8"12
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Plating Notes
All plates are 1.5X3 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 10.88 26.12
BC 72 0.00 13.65
BC 64 13.68 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
Q 1177 /- /- /753 /711 /334
H 962 /- /- /504 /666 /-
Wind reactions based on MWFRS
Q Brg Width = 8.0 Min Req = 1.5
H Brg Width = 3.5 Min Req = 1.5
Bearings Q & H are a rigid surface.
Bearing Q requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 113 -300
B - C 144 -275
C - D 856 -1335
Chords Tens. Comp.
D - E 1223 -1674
E - F 932 -1333
F - G 932 -1333
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - P 291 -94
P - O 1089 -973
O - N 23 -27
M - L 1686 -1233
Chords Tens. Comp.
L - J 17 -10
K - H 1 -24
J - I 38 -11
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - P 226 -160
P - C 1007 -1422
C - O 203 -32
D - O 392 -392
D - M 810 -591
O - M 1240 -895
M - N 0 -25
Webs Tens. Comp.
M - E 171 -51
E - L 348 -409
F - L 457 -438
L - G 1512 -1060
K - J 22 0
I - G 689 -907
I - H 675 -934
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.082 E 999 360
VERT(CL): 0.141 E 999 240
HORZ(LL): -0.033 K - -
HORZ(TL): 0.067 K - -
Creep Factor: 2.0
Max TC CSI: 0.667
Max BC CSI: 0.992
Max Web CSI: 0.861
Wgt: 154.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B02
Truss Type
HIPM
Qty
1
Ply
1 3677
06/23/2020
W1
(a)
A
B
C
D E F G
HIJKL
M NOPQ
5
12
2X4(A1)
3X6
3X4
5X6
3X10
6X6
3X4 1.5X4
4X8
3X3
4X4
3X6
1'10"8 24'3"
SEAT PLATE REQ.
10'10"8 15'3"
13'9"8 10'7"8 1'8"8
26'1"8
4"1 4'10"71'**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Plating Notes
All plates are 1.5X3 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 10.88 26.12
BC 72 0.00 13.65
BC 64 13.68 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
Q 1177 /- /- /753 /711 /334
H 962 /- /- /504 /666 /-
Wind reactions based on MWFRS
Q Brg Width = 8.0 Min Req = 1.5
H Brg Width = 3.5 Min Req = 1.5
Bearings Q & H are a rigid surface.
Bearing Q requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 113 -300
B - C 144 -275
C - D 856 -1335
Chords Tens. Comp.
D - E 1223 -1674
E - F 932 -1333
F - G 932 -1333
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - P 291 -94
P - O 1089 -973
O - N 23 -27
M - L 1686 -1233
Chords Tens. Comp.
L - J 17 -10
K - H 1 -24
J - I 38 -11
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - P 226 -160
P - C 1007 -1422
C - O 203 -32
D - O 392 -392
D - M 810 -591
O - M 1240 -895
M - N 0 -25
Webs Tens. Comp.
M - E 171 -51
E - L 348 -409
F - L 457 -438
L - G 1512 -1060
K - J 22 0
I - G 689 -907
I - H 675 -934
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.082 E 999 360
VERT(CL): 0.141 E 999 240
HORZ(LL): -0.033 K - -
HORZ(TL): 0.067 K - -
Creep Factor: 2.0
Max TC CSI: 0.667
Max BC CSI: 0.992
Max Web CSI: 0.861
Wgt: 154.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B02
Truss Type
HIPM
Qty
1
Ply
1 3677
06/23/2020
W1
(a)
A
B
C
D E F G
HIJKL
M NOPQ
5
12
2X4(A1)
3X6
3X4
5X6
3X10
6X6
3X4 1.5X4
4X8
3X3
4X4
3X6
1'10"8 24'3"
SEAT PLATE REQ.
10'10"8 15'3"
13'9"8 10'7"8 1'8"8
26'1"8
4"1 4'10"71'Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Plating Notes
All plates are 1.5X3 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 12.88 26.12
BC 75 0.00 13.65
BC 81 13.65 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
Q 1165 /- /- /757 /399 /281
G 972 /- /- /521 /596 /-
Wind reactions based on MWFRS
Q Brg Width = 8.0 Min Req = 1.5
G Brg Width = 3.5 Min Req = 1.5
Bearings Q & G are a rigid surface.
Bearing Q requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 182 -254
B - C 810 -1456
C - D 965 -1540
Chords Tens. Comp.
D - E 763 -1131
E - F 762 -1131
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - Q 252 -140
Q - P 162 -410
P - O 71 -49
N - M 1321 -968
O - L 42 -23
Chords Tens. Comp.
M - K 1374 -990
K - I 10 0
J - G 0 -28
I - H 37 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
Q - B 750 -1095
B - P 1219 -634
P - C 362 -383
P - N 1263 -971
C - N 141 -88
D - N 412 -128
D - K 273 -292
Webs Tens. Comp.
N - O 223 0
M - L 28 -129
E - K 495 -468
K - F 1351 -917
J - I 20 0
H - F 688 -910
H - G 675 -944
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.061 O 999 360
VERT(CL): 0.126 O 999 240
HORZ(LL): 0.031 J - -
HORZ(TL): 0.065 J - -
Creep Factor: 2.0
Max TC CSI: 0.751
Max BC CSI: 1.000
Max Web CSI: 0.993
Wgt: 163.1 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B03
Truss Type
HIPM
Qty
1
Ply
1 3674
06/23/2020
W1
(a)
A
B
C
D E F
GHIJK
LMNOPQ
5
12
2X4(A1)
3X4
3X6
4X8
3X4
6X6
5X6
1.5X4
4X8
3X3
4X4
3X6
1'10"8 24'3"
SEAT PLATE REQ.
12'10"8 13'3"
13'9"8 10'7"8 1'8"8
26'1"8
4"1 5'8"71'**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Plating Notes
All plates are 1.5X3 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 12.88 26.12
BC 75 0.00 13.65
BC 81 13.65 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
Q 1165 /- /- /757 /399 /281
G 972 /- /- /521 /596 /-
Wind reactions based on MWFRS
Q Brg Width = 8.0 Min Req = 1.5
G Brg Width = 3.5 Min Req = 1.5
Bearings Q & G are a rigid surface.
Bearing Q requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 182 -254
B - C 810 -1456
C - D 965 -1540
Chords Tens. Comp.
D - E 763 -1131
E - F 762 -1131
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - Q 252 -140
Q - P 162 -410
P - O 71 -49
N - M 1321 -968
O - L 42 -23
Chords Tens. Comp.
M - K 1374 -990
K - I 10 0
J - G 0 -28
I - H 37 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
Q - B 750 -1095
B - P 1219 -634
P - C 362 -383
P - N 1263 -971
C - N 141 -88
D - N 412 -128
D - K 273 -292
Webs Tens. Comp.
N - O 223 0
M - L 28 -129
E - K 495 -468
K - F 1351 -917
J - I 20 0
H - F 688 -910
H - G 675 -944
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.061 O 999 360
VERT(CL): 0.126 O 999 240
HORZ(LL): 0.031 J - -
HORZ(TL): 0.065 J - -
Creep Factor: 2.0
Max TC CSI: 0.751
Max BC CSI: 1.000
Max Web CSI: 0.993
Wgt: 163.1 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B03
Truss Type
HIPM
Qty
1
Ply
1 3674
06/23/2020
W1
(a)
A
B
C
D E F
GHIJK
LMNOPQ
5
12
2X4(A1)
3X4
3X6
4X8
3X4
6X6
5X6
1.5X4
4X8
3X3
4X4
3X6
1'10"8 24'3"
SEAT PLATE REQ.
12'10"8 13'3"
13'9"8 10'7"8 1'8"8
26'1"8
4"1 5'8"71'Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3 :W1 2x6 SP #2:
Plating Notes
All plates are 3X6 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 14.88 26.12
BC 75 0.00 13.63
BC 91 13.63 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
Q 1165 /- /- /765 /387 /325
I 972 /- /- /533 /576 /-
Wind reactions based on MWFRS
Q Brg Width = 8.0 Min Req = 1.5
I Brg Width = 3.5 Min Req = 1.5
Bearings Q & I are a rigid surface.
Bearing Q requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 174 -250
B - C 763 -1479
C - D 889 -1477
D - E 907 -1433
Chords Tens. Comp.
E - F 1061 -1447
F - G 595 -868
G - H 594 -868
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - Q 247 -135
Q - P 180 -476
P - O 40 -28
N - M 1135 -839
Chords Tens. Comp.
M - K 4 0
L - I 0 -13
K - J 17 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
Q - B 725 -1086
B - P 1216 -590
P - C 357 -356
P - N 1308 -991
C - N 108 -54
E - N 384 -298
N - O 111 0
Webs Tens. Comp.
N - F 695 -551
F - M 337 -367
G - M 427 -409
M - H 1170 -803
L - K 28 0
J - H 698 -927
J - I 687 -950
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.054 E 999 360
VERT(CL): 0.111 E 999 240
HORZ(LL): 0.023 L - -
HORZ(TL): 0.049 L - -
Creep Factor: 2.0
Max TC CSI: 0.551
Max BC CSI: 0.992
Max Web CSI: 0.884
Wgt: 170.1 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B04
Truss Type
HIPM
Qty
1
Ply
1 3671
06/23/2020
W1A
B
C
D
E
F G H
IJKLM
N OPQ
5
12
2X4(A1)
3X3 5X8
3X4
1.5X3
5X6
1.5X4
5X6 1.5X4
4X8
1.5X3
1.5X3 3X3
4X4
1'10"8 24'3"
SEAT PLATE REQ.
14'10"8 11'3"
13'9"8 10'7"8 1'8"8
26'1"8
4"1 6'6"71'**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3 :W1 2x6 SP #2:
Plating Notes
All plates are 3X6 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 14.88 26.12
BC 75 0.00 13.63
BC 91 13.63 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
Q 1165 /- /- /765 /387 /325
I 972 /- /- /533 /576 /-
Wind reactions based on MWFRS
Q Brg Width = 8.0 Min Req = 1.5
I Brg Width = 3.5 Min Req = 1.5
Bearings Q & I are a rigid surface.
Bearing Q requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 174 -250
B - C 763 -1479
C - D 889 -1477
D - E 907 -1433
Chords Tens. Comp.
E - F 1061 -1447
F - G 595 -868
G - H 594 -868
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - Q 247 -135
Q - P 180 -476
P - O 40 -28
N - M 1135 -839
Chords Tens. Comp.
M - K 4 0
L - I 0 -13
K - J 17 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
Q - B 725 -1086
B - P 1216 -590
P - C 357 -356
P - N 1308 -991
C - N 108 -54
E - N 384 -298
N - O 111 0
Webs Tens. Comp.
N - F 695 -551
F - M 337 -367
G - M 427 -409
M - H 1170 -803
L - K 28 0
J - H 698 -927
J - I 687 -950
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.054 E 999 360
VERT(CL): 0.111 E 999 240
HORZ(LL): 0.023 L - -
HORZ(TL): 0.049 L - -
Creep Factor: 2.0
Max TC CSI: 0.551
Max BC CSI: 0.992
Max Web CSI: 0.884
Wgt: 170.1 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B04
Truss Type
HIPM
Qty
1
Ply
1 3671
06/23/2020
W1A
B
C
D
E
F G H
IJKLM
N OPQ
5
12
2X4(A1)
3X3 5X8
3X4
1.5X3
5X6
1.5X4
5X6 1.5X4
4X8
1.5X3
1.5X3 3X3
4X4
1'10"8 24'3"
SEAT PLATE REQ.
14'10"8 11'3"
13'9"8 10'7"8 1'8"8
26'1"8
4"1 6'6"71'Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2 :B2 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 16.88 26.12
BC 75 0.00 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
L 1163 /- /- /771 /374 /368
H 971 /- /- /547 /550 /-
Wind reactions based on MWFRS
L Brg Width = 8.0 Min Req = 1.5
H Brg Width = 3.5 Min Req = 1.5
Bearings L & H are a rigid surface.
Bearing L requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 134 -245
B - C 738 -1508
C - D 499 -993
Chords Tens. Comp.
D - E 524 -942
E - F 588 -824
F - G 0 0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - L 238 -106
L - K 250 -550
K - J 1334 -1012
Chords Tens. Comp.
J - I 1334 -1012
I - H 510 -385
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - B 725 -1060
B - K 1156 -526
K - C 171 -53
C - I 461 -559
Webs Tens. Comp.
E - I 249 -61
I - F 588 -380
F - H 704 -931
G - H 138 -119
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.042 C 999 360
VERT(CL): 0.085 C 999 240
HORZ(LL): -0.012 H - -
HORZ(TL): 0.026 H - -
Creep Factor: 2.0
Max TC CSI: 0.674
Max BC CSI: 0.655
Max Web CSI: 0.509
Wgt: 153.3 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B05
Truss Type
HIPM
Qty
2
Ply
1 3622
06/23/2020
B2
W1
(a)
(a)
A
B
C
D
E F G
HIJKL
5
12
2X4(A1)
3X3
3X6
4X4
3X4
3X6
3X6
5X6
3X8
3X4 1.5X4
3X6(R)
1'10"8 24'3"
SEAT PLATE REQ.
16'10"8 9'3"
26'1"8
4"1 7'4"7**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2 :B2 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 16.88 26.12
BC 75 0.00 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
L 1163 /- /- /771 /374 /368
H 971 /- /- /547 /550 /-
Wind reactions based on MWFRS
L Brg Width = 8.0 Min Req = 1.5
H Brg Width = 3.5 Min Req = 1.5
Bearings L & H are a rigid surface.
Bearing L requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 134 -245
B - C 738 -1508
C - D 499 -993
Chords Tens. Comp.
D - E 524 -942
E - F 588 -824
F - G 0 0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - L 238 -106
L - K 250 -550
K - J 1334 -1012
Chords Tens. Comp.
J - I 1334 -1012
I - H 510 -385
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - B 725 -1060
B - K 1156 -526
K - C 171 -53
C - I 461 -559
Webs Tens. Comp.
E - I 249 -61
I - F 588 -380
F - H 704 -931
G - H 138 -119
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.042 C 999 360
VERT(CL): 0.085 C 999 240
HORZ(LL): -0.012 H - -
HORZ(TL): 0.026 H - -
Creep Factor: 2.0
Max TC CSI: 0.674
Max BC CSI: 0.655
Max Web CSI: 0.509
Wgt: 153.3 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B05
Truss Type
HIPM
Qty
2
Ply
1 3622
06/23/2020
B2
W1
(a)
(a)
A
B
C
D
E F G
HIJKL
5
12
2X4(A1)
3X3
3X6
4X4
3X4
3X6
3X6
5X6
3X8
3X4 1.5X4
3X6(R)
1'10"8 24'3"
SEAT PLATE REQ.
16'10"8 9'3"
26'1"8
4"1 7'4"7Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 18.87 26.12
BC 75 0.00 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
K 1165 /- /- /776 /360 /412
G 972 /- /- /563 /520 /-
Wind reactions based on MWFRS
K Brg Width = 8.0 Min Req = 1.5
G Brg Width = 3.5 Min Req = 1.5
Bearings K & G are a rigid surface.
Bearing K requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 121 -221
B - C 662 -1506
C - D 666 -1345
Chords Tens. Comp.
D - E 407 -837
E - F 490 -671
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - K 208 -103
K - J 343 -661
J - I 1311 -973
Chords Tens. Comp.
I - H 1311 -973
H - G 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
K - B 721 -1052
B - J 1043 -388
J - D 237 0
D - H 527 -703
Webs Tens. Comp.
E - H 410 -263
H - F 1004 -733
F - G 731 -920
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.048 D 999 360
VERT(CL): 0.097 D 999 240
HORZ(LL): -0.014 D - -
HORZ(TL): 0.024 H - -
Creep Factor: 2.0
Max TC CSI: 0.931
Max BC CSI: 0.897
Max Web CSI: 0.999
Wgt: 150.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B06
Truss Type
HIPM
Qty
2
Ply
1 3626
06/23/2020
W1
(a)
(a)
(a)
A
B
C
D
E F
GHIJK
5
12
2X4(A1)
3X3
3X6
3X6
3X4
3X4
3X6
5X6(R)
3X10
3X6(R)
3X6
1'10"8 24'3"
SEAT PLATE REQ.
18'10"8 7'3"
26'1"8
4"1 8'2"7**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 18.87 26.12
BC 75 0.00 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
K 1165 /- /- /776 /360 /412
G 972 /- /- /563 /520 /-
Wind reactions based on MWFRS
K Brg Width = 8.0 Min Req = 1.5
G Brg Width = 3.5 Min Req = 1.5
Bearings K & G are a rigid surface.
Bearing K requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 121 -221
B - C 662 -1506
C - D 666 -1345
Chords Tens. Comp.
D - E 407 -837
E - F 490 -671
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - K 208 -103
K - J 343 -661
J - I 1311 -973
Chords Tens. Comp.
I - H 1311 -973
H - G 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
K - B 721 -1052
B - J 1043 -388
J - D 237 0
D - H 527 -703
Webs Tens. Comp.
E - H 410 -263
H - F 1004 -733
F - G 731 -920
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.048 D 999 360
VERT(CL): 0.097 D 999 240
HORZ(LL): -0.014 D - -
HORZ(TL): 0.024 H - -
Creep Factor: 2.0
Max TC CSI: 0.931
Max BC CSI: 0.897
Max Web CSI: 0.999
Wgt: 150.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B06
Truss Type
HIPM
Qty
2
Ply
1 3626
06/23/2020
W1
(a)
(a)
(a)
A
B
C
D
E F
GHIJK
5
12
2X4(A1)
3X3
3X6
3X6
3X4
3X4
3X6
5X6(R)
3X10
3X6(R)
3X6
1'10"8 24'3"
SEAT PLATE REQ.
18'10"8 7'3"
26'1"8
4"1 8'2"7Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP M-30
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 20.87 26.12
BC 75 0.00 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
K 1175 /- /- /785 /348 /456
G 972 /- /- /573 /485 /-
Wind reactions based on MWFRS
K Brg Width = 8.0 Min Req = 1.5
G Brg Width = 3.5 Min Req = 1.5
Bearings K & G are a rigid surface.
Bearing K requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 149 -252
B - C 187 -225
C - D 586 -1343
Chords Tens. Comp.
D - E 279 -609
E - F 0 0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - J 245 -120
J - I 1249 -1014
Chords Tens. Comp.
I - H 933 -733
H - G 492 -328
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - J 274 -222
J - C 764 -1561
C - I 289 -132
I - D 444 -136
Webs Tens. Comp.
D - H 579 -669
E - H 773 -320
E - G 638 -955
F - G 180 -162
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.042 I 999 360
VERT(CL): 0.086 I 999 240
HORZ(LL): 0.014 G - -
HORZ(TL): 0.030 G - -
Creep Factor: 2.0
Max TC CSI: 0.625
Max BC CSI: 0.565
Max Web CSI: 0.497
Wgt: 158.9 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B07
Truss Type
HIPM
Qty
2
Ply
1 3648
06/23/2020
W1
(a)
(a)
(a)
(a)
A
B
C
D
E F
GHIJK
5
12
2X4(A1)
1.5X3
3X6
3X4
5X6
5X6
5X6
3X4
2X4
3X6(R)
1'10"8 24'3"
SEAT PLATE REQ.
20'10"8 5'3"
26'1"8
4"1 9'0"7**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP M-30
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 20.87 26.12
BC 75 0.00 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
K 1175 /- /- /785 /348 /456
G 972 /- /- /573 /485 /-
Wind reactions based on MWFRS
K Brg Width = 8.0 Min Req = 1.5
G Brg Width = 3.5 Min Req = 1.5
Bearings K & G are a rigid surface.
Bearing K requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 149 -252
B - C 187 -225
C - D 586 -1343
Chords Tens. Comp.
D - E 279 -609
E - F 0 0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - J 245 -120
J - I 1249 -1014
Chords Tens. Comp.
I - H 933 -733
H - G 492 -328
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - J 274 -222
J - C 764 -1561
C - I 289 -132
I - D 444 -136
Webs Tens. Comp.
D - H 579 -669
E - H 773 -320
E - G 638 -955
F - G 180 -162
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.042 I 999 360
VERT(CL): 0.086 I 999 240
HORZ(LL): 0.014 G - -
HORZ(TL): 0.030 G - -
Creep Factor: 2.0
Max TC CSI: 0.625
Max BC CSI: 0.565
Max Web CSI: 0.497
Wgt: 158.9 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B07
Truss Type
HIPM
Qty
2
Ply
1 3648
06/23/2020
W1
(a)
(a)
(a)
(a)
A
B
C
D
E F
GHIJK
5
12
2X4(A1)
1.5X3
3X6
3X4
5X6
5X6
5X6
3X4
2X4
3X6(R)
1'10"8 24'3"
SEAT PLATE REQ.
20'10"8 5'3"
26'1"8
4"1 9'0"7Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2 :B2 2x4 SP 2400f-2.0E:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 22.88 26.12
BC 75 0.00 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
L 1165 /- /- /778 /327 /500
H 988 /- /- /601 /481 /-
Wind reactions based on MWFRS
L Brg Width = 8.0 Min Req = 1.5
H Brg Width = 3.5 Min Req = 1.5
Bearings L & H are a rigid surface.
Bearing L requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 119 -242
B - C 552 -1490
C - D 367 -1052
Chords Tens. Comp.
D - E 374 -916
E - F 593 -1061
F - G 0 0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - L 232 -100
L - K 289 -718
K - J 1310 -983
Chords Tens. Comp.
J - I 1310 -983
I - H 269 -224
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - B 662 -1054
B - K 1091 -367
K - C 125 -70
C - I 396 -468
Webs Tens. Comp.
E - I 510 -481
I - F 1097 -711
F - H 698 -837
G - H 115 -100
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.045 E 999 360
VERT(CL): 0.093 E 999 240
HORZ(LL): -0.014 G - -
HORZ(TL): 0.028 G - -
Creep Factor: 2.0
Max TC CSI: 0.641
Max BC CSI: 0.679
Max Web CSI: 0.812
Wgt: 161.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B08
Truss Type
HIPM
Qty
2
Ply
1 3642
06/23/2020
B2
W1
(a)
(a)(a)
(a)
A
B
C
D
E
F G
HIJKL
5
12
2X4(A1)
2X4
3X6
3X4
3X4
3X6
3X6
1.5X4
4X8
5X6
2X4
3X6(R)
1'10"8 24'3"
SEAT PLATE REQ.
22'10"8 3'3"
26'1"8
4"1 9'10"7**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2 :B2 2x4 SP 2400f-2.0E:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 22.88 26.12
BC 75 0.00 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
L 1165 /- /- /778 /327 /500
H 988 /- /- /601 /481 /-
Wind reactions based on MWFRS
L Brg Width = 8.0 Min Req = 1.5
H Brg Width = 3.5 Min Req = 1.5
Bearings L & H are a rigid surface.
Bearing L requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 119 -242
B - C 552 -1490
C - D 367 -1052
Chords Tens. Comp.
D - E 374 -916
E - F 593 -1061
F - G 0 0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - L 232 -100
L - K 289 -718
K - J 1310 -983
Chords Tens. Comp.
J - I 1310 -983
I - H 269 -224
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - B 662 -1054
B - K 1091 -367
K - C 125 -70
C - I 396 -468
Webs Tens. Comp.
E - I 510 -481
I - F 1097 -711
F - H 698 -837
G - H 115 -100
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.045 E 999 360
VERT(CL): 0.093 E 999 240
HORZ(LL): -0.014 G - -
HORZ(TL): 0.028 G - -
Creep Factor: 2.0
Max TC CSI: 0.641
Max BC CSI: 0.679
Max Web CSI: 0.812
Wgt: 161.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B08
Truss Type
HIPM
Qty
2
Ply
1 3642
06/23/2020
B2
W1
(a)
(a)(a)
(a)
A
B
C
D
E
F G
HIJKL
5
12
2X4(A1)
2X4
3X6
3X4
3X4
3X6
3X6
1.5X4
4X8
5X6
2X4
3X6(R)
1'10"8 24'3"
SEAT PLATE REQ.
22'10"8 3'3"
26'1"8
4"1 9'10"7Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2 :B2 2x4 SP 2400f-2.0E:
Webs 2x4 SP #3 :W1 2x6 SP #2:
:W6 2x4 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 24.87 26.12
BC 75 0.00 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
L 1165 /- /- /777 /309 /543
H 992 /- /- /622 /497 /-
Wind reactions based on MWFRS
L Brg Width = 8.0 Min Req = 1.5
H Brg Width = 3.5 Min Req = 1.5
Bearings L & H are a rigid surface.
Bearing L requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 126 -245
B - C 492 -1497
C - D 284 -1029
Chords Tens. Comp.
D - E 292 -889
E - F 550 -1056
F - G 0 0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - L 237 -103
L - K 270 -753
K - J 1319 -983
Chords Tens. Comp.
J - I 1319 -983
I - H 103 -87
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - B 631 -1062
B - K 1121 -343
K - C 130 -58
C - I 414 -494
Webs Tens. Comp.
E - I 594 -569
I - F 1245 -841
F - H 731 -866
G - H 43 -37
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.049 E 999 360
VERT(CL): 0.101 E 999 240
HORZ(LL): -0.017 G - -
HORZ(TL): 0.034 G - -
Creep Factor: 2.0
Max TC CSI: 0.910
Max BC CSI: 0.716
Max Web CSI: 0.659
Wgt: 171.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B09
Truss Type
HIPM
Qty
2
Ply
1 3654
06/23/2020
B2
W1
W6
(a)
(a)
(a)
(a)
A
B
C
D
E
F G
HIJKL
5
12
2X4(A1)
2X4
3X6
3X4
3X4
3X6
3X6
1.5X4
4X8
5X6 2X4
3X6(R)
1'10"8 24'3"
SEAT PLATE REQ.
24'10"8 1'3"
26'1"8
4"1 10'8"7**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2 :B2 2x4 SP 2400f-2.0E:
Webs 2x4 SP #3 :W1 2x6 SP #2:
:W6 2x4 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 24.87 26.12
BC 75 0.00 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
L 1165 /- /- /777 /309 /543
H 992 /- /- /622 /497 /-
Wind reactions based on MWFRS
L Brg Width = 8.0 Min Req = 1.5
H Brg Width = 3.5 Min Req = 1.5
Bearings L & H are a rigid surface.
Bearing L requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 126 -245
B - C 492 -1497
C - D 284 -1029
Chords Tens. Comp.
D - E 292 -889
E - F 550 -1056
F - G 0 0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - L 237 -103
L - K 270 -753
K - J 1319 -983
Chords Tens. Comp.
J - I 1319 -983
I - H 103 -87
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - B 631 -1062
B - K 1121 -343
K - C 130 -58
C - I 414 -494
Webs Tens. Comp.
E - I 594 -569
I - F 1245 -841
F - H 731 -866
G - H 43 -37
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.049 E 999 360
VERT(CL): 0.101 E 999 240
HORZ(LL): -0.017 G - -
HORZ(TL): 0.034 G - -
Creep Factor: 2.0
Max TC CSI: 0.910
Max BC CSI: 0.716
Max Web CSI: 0.659
Wgt: 171.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B09
Truss Type
HIPM
Qty
2
Ply
1 3654
06/23/2020
B2
W1
W6
(a)
(a)
(a)
(a)
A
B
C
D
E
F G
HIJKL
5
12
2X4(A1)
2X4
3X6
3X4
3X4
3X6
3X6
1.5X4
4X8
5X6 2X4
3X6(R)
1'10"8 24'3"
SEAT PLATE REQ.
24'10"8 1'3"
26'1"8
4"1 10'8"7Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2 :T2 2x4 SP M-30:
Bot chord 2x4 SP #2 :B2 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 75 0.00 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
K 1165 /- /- /776 /224 /480
G 972 /- /- /614 /378 /-
Wind reactions based on MWFRS
K Brg Width = 8.0 Min Req = 1.5
G Brg Width = 3.5 Min Req = 1.5
Bearings K & G are a rigid surface.
Bearing K requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 121 -241
B - C 471 -1505
C - D 226 -967
Chords Tens. Comp.
D - E 246 -881
E - F 67 -137
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - K 232 -102
K - J 290 -779
J - I 1321 -973
Chords Tens. Comp.
I - H 1321 -973
H - G 792 -555
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
K - B 628 -1059
B - J 1104 -313
J - C 166 -26
C - H 458 -569
Webs Tens. Comp.
H - E 569 -96
E - G 730 -1049
F - G 234 -210
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.044 C 999 360
VERT(CL): 0.089 C 999 240
HORZ(LL): 0.014 G - -
HORZ(TL): 0.029 G - -
Creep Factor: 2.0
Max TC CSI: 0.640
Max BC CSI: 0.658
Max Web CSI: 0.662
Wgt: 154.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B10
Truss Type
HIPM
Qty
1
Ply
1 3818
06/23/2020
T2
B2
W1
(a)
(a)
(a)
A
B
C
D
E
F
GHIJK
5
12
2X4(A1)
2X4
3X6
3X4
3X4
3X6
3X6 3X4
3X4
4X4
3X6(R)
1'10"8 24'3"
SEAT PLATE REQ.
25'5"8"8
26'1"8
4"1 11'2"1110'11"2**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2 :T2 2x4 SP M-30:
Bot chord 2x4 SP #2 :B2 2x4 SP M-30:
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 75 0.00 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
K 1165 /- /- /776 /224 /480
G 972 /- /- /614 /378 /-
Wind reactions based on MWFRS
K Brg Width = 8.0 Min Req = 1.5
G Brg Width = 3.5 Min Req = 1.5
Bearings K & G are a rigid surface.
Bearing K requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 121 -241
B - C 471 -1505
C - D 226 -967
Chords Tens. Comp.
D - E 246 -881
E - F 67 -137
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - K 232 -102
K - J 290 -779
J - I 1321 -973
Chords Tens. Comp.
I - H 1321 -973
H - G 792 -555
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
K - B 628 -1059
B - J 1104 -313
J - C 166 -26
C - H 458 -569
Webs Tens. Comp.
H - E 569 -96
E - G 730 -1049
F - G 234 -210
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.044 C 999 360
VERT(CL): 0.089 C 999 240
HORZ(LL): 0.014 G - -
HORZ(TL): 0.029 G - -
Creep Factor: 2.0
Max TC CSI: 0.640
Max BC CSI: 0.658
Max Web CSI: 0.662
Wgt: 154.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B10
Truss Type
HIPM
Qty
1
Ply
1 3818
06/23/2020
T2
B2
W1
(a)
(a)
(a)
A
B
C
D
E
F
GHIJK
5
12
2X4(A1)
2X4
3X6
3X4
3X4
3X6
3X6 3X4
3X4
4X4
3X6(R)
1'10"8 24'3"
SEAT PLATE REQ.
25'5"8"8
26'1"8
4"1 11'2"1110'11"2Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2 :T2 2x4 SP M-30:
Bot chord 2x4 SP #2
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 75 0.00 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
J 1165 /- /- /775 /219 /493
G 972 /- /- /637 /406 /-
Wind reactions based on MWFRS
J Brg Width = 8.0 Min Req = 1.5
G Brg Width = 3.5 Min Req = 1.5
Bearings J & G are a rigid surface.
Bearing J requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 110 -222
B - C 428 -1480
C - D 206 -912
Chords Tens. Comp.
D - E 220 -807
E - F 75 -154
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - J 236 -92
J - I 394 -859
Chords Tens. Comp.
I - H 1280 -929
H - G 746 -519
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
J - B 645 -1040
B - I 960 -198
I - C 205 0
C - H 465 -597
Webs Tens. Comp.
H - E 577 -136
E - G 719 -1032
F - G 262 -194
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.045 C 999 360
VERT(CL): 0.091 C 999 240
HORZ(LL): 0.015 G - -
HORZ(TL): 0.032 G - -
Creep Factor: 2.0
Max TC CSI: 0.629
Max BC CSI: 0.892
Max Web CSI: 0.629
Wgt: 157.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B11
Truss Type
MONO
Qty
4
Ply
1 4038
06/23/2020
T2
W1
(a)
(a)
(a)
A
B
C
D
E
F
GHIJ
5
12
2X4(A1)
2X4
3X6
5X6
3X4
3X6
3X4
3X4
2X4
3X6(R)
1'10"8 24'3"
SEAT PLATE REQ.
26'1"8
26'1"8
4"1 11'2"11**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2 :T2 2x4 SP M-30:
Bot chord 2x4 SP #2
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 75 0.00 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom chord live load in areas with
42"-high x 24"-wide clearance.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
J 1165 /- /- /775 /219 /493
G 972 /- /- /637 /406 /-
Wind reactions based on MWFRS
J Brg Width = 8.0 Min Req = 1.5
G Brg Width = 3.5 Min Req = 1.5
Bearings J & G are a rigid surface.
Bearing J requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 110 -222
B - C 428 -1480
C - D 206 -912
Chords Tens. Comp.
D - E 220 -807
E - F 75 -154
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - J 236 -92
J - I 394 -859
Chords Tens. Comp.
I - H 1280 -929
H - G 746 -519
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
J - B 645 -1040
B - I 960 -198
I - C 205 0
C - H 465 -597
Webs Tens. Comp.
H - E 577 -136
E - G 719 -1032
F - G 262 -194
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.045 C 999 360
VERT(CL): 0.091 C 999 240
HORZ(LL): 0.015 G - -
HORZ(TL): 0.032 G - -
Creep Factor: 2.0
Max TC CSI: 0.629
Max BC CSI: 0.892
Max Web CSI: 0.629
Wgt: 157.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B11
Truss Type
MONO
Qty
4
Ply
1 4038
06/23/2020
T2
W1
(a)
(a)
(a)
A
B
C
D
E
F
GHIJ
5
12
2X4(A1)
2X4
3X6
5X6
3X4
3X6
3X4
3X4
2X4
3X6(R)
1'10"8 24'3"
SEAT PLATE REQ.
26'1"8
26'1"8
4"1 11'2"11Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 14.87 26.12
BC 75 0.00 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
M 1165 /- /- /765 /387 /325
H 972 /- /- /533 /576 /-
Wind reactions based on MWFRS
M Brg Width = 8.0 Min Req = 1.5
H Brg Width = 3.5 Min Req = 1.5
Bearings M & H are a rigid surface.
Bearing M requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 164 -248
B - C 776 -1493
C - D 639 -1134
Chords Tens. Comp.
D - E 655 -1058
E - F 487 -708
F - G 487 -708
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - M 244 -128
M - L 198 -479
L - K 1333 -1013
Chords Tens. Comp.
K - J 1333 -1013
J - I 967 -703
I - H 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - B 731 -1080
B - L 1205 -583
L - C 190 -106
C - J 342 -405
E - J 383 -83
Webs Tens. Comp.
E - I 323 -387
F - I 409 -380
I - G 1058 -728
G - H 700 -926
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.041 J 999 360
VERT(CL): 0.084 J 999 240
HORZ(LL): 0.012 I - -
HORZ(TL): 0.027 I - -
Creep Factor: 2.0
Max TC CSI: 0.509
Max BC CSI: 0.627
Max Web CSI: 0.939
Wgt: 153.3 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B12
Truss Type
HIPM
Qty
1
Ply
1 3616
06/23/2020
W1
(a)
A
B
C
D
E F G
HIJKLM
5
12
2X4(A1)
3X4
3X6
4X4
3X4
3X6
3X6
6X6
3X4
1.5X4
4X8
3X4(R)
3X6
1'10"8 24'3"
SEAT PLATE REQ.
14'10"8 11'3"
26'1"8
4"1 6'6"7**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 14.87 26.12
BC 75 0.00 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
M 1165 /- /- /765 /387 /325
H 972 /- /- /533 /576 /-
Wind reactions based on MWFRS
M Brg Width = 8.0 Min Req = 1.5
H Brg Width = 3.5 Min Req = 1.5
Bearings M & H are a rigid surface.
Bearing M requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 164 -248
B - C 776 -1493
C - D 639 -1134
Chords Tens. Comp.
D - E 655 -1058
E - F 487 -708
F - G 487 -708
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - M 244 -128
M - L 198 -479
L - K 1333 -1013
Chords Tens. Comp.
K - J 1333 -1013
J - I 967 -703
I - H 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - B 731 -1080
B - L 1205 -583
L - C 190 -106
C - J 342 -405
E - J 383 -83
Webs Tens. Comp.
E - I 323 -387
F - I 409 -380
I - G 1058 -728
G - H 700 -926
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.041 J 999 360
VERT(CL): 0.084 J 999 240
HORZ(LL): 0.012 I - -
HORZ(TL): 0.027 I - -
Creep Factor: 2.0
Max TC CSI: 0.509
Max BC CSI: 0.627
Max Web CSI: 0.939
Wgt: 153.3 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B12
Truss Type
HIPM
Qty
1
Ply
1 3616
06/23/2020
W1
(a)
A
B
C
D
E F G
HIJKLM
5
12
2X4(A1)
3X4
3X6
4X4
3X4
3X6
3X6
6X6
3X4
1.5X4
4X8
3X4(R)
3X6
1'10"8 24'3"
SEAT PLATE REQ.
14'10"8 11'3"
26'1"8
4"1 6'6"7Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 12.87 26.12
BC 75 0.00 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
L 1165 /- /- /757 /399 /281
G 972 /- /- /521 /596 /-
Wind reactions based on MWFRS
L Brg Width = 8.0 Min Req = 1.5
G Brg Width = 3.5 Min Req = 1.5
Bearings L & G are a rigid surface.
Bearing L requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 181 -251
B - C 795 -1435
C - D 763 -1264
Chords Tens. Comp.
D - E 625 -928
E - F 625 -928
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - L 249 -140
L - K 164 -413
K - J 1295 -995
Chords Tens. Comp.
J - I 1102 -794
I - H 1102 -794
H - G 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - B 743 -1089
B - K 1199 -618
K - C 214 -184
C - J 223 -215
D - J 317 -36
Webs Tens. Comp.
D - H 218 -224
E - H 495 -468
H - F 1198 -807
F - G 691 -919
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.044 J 999 360
VERT(CL): 0.090 J 999 240
HORZ(LL): 0.012 H - -
HORZ(TL): 0.026 H - -
Creep Factor: 2.0
Max TC CSI: 0.743
Max BC CSI: 0.630
Max Web CSI: 0.959
Wgt: 151.9 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B13
Truss Type
HIPM
Qty
1
Ply
1 3607
06/23/2020
W1
(a)(a)
A
B
C
D E F
GHIJKL
5
12
2X4(A1)
3X4
3X6
4X4
3X4
6X6
3X4 3X6
1.5X4
4X8
4X4
3X6
1'10"8 24'3"
SEAT PLATE REQ.
12'10"8 13'3"
26'1"8
4"1 5'8"7**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 12.87 26.12
BC 75 0.00 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
L 1165 /- /- /757 /399 /281
G 972 /- /- /521 /596 /-
Wind reactions based on MWFRS
L Brg Width = 8.0 Min Req = 1.5
G Brg Width = 3.5 Min Req = 1.5
Bearings L & G are a rigid surface.
Bearing L requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 181 -251
B - C 795 -1435
C - D 763 -1264
Chords Tens. Comp.
D - E 625 -928
E - F 625 -928
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - L 249 -140
L - K 164 -413
K - J 1295 -995
Chords Tens. Comp.
J - I 1102 -794
I - H 1102 -794
H - G 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - B 743 -1089
B - K 1199 -618
K - C 214 -184
C - J 223 -215
D - J 317 -36
Webs Tens. Comp.
D - H 218 -224
E - H 495 -468
H - F 1198 -807
F - G 691 -919
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.044 J 999 360
VERT(CL): 0.090 J 999 240
HORZ(LL): 0.012 H - -
HORZ(TL): 0.026 H - -
Creep Factor: 2.0
Max TC CSI: 0.743
Max BC CSI: 0.630
Max Web CSI: 0.959
Wgt: 151.9 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B13
Truss Type
HIPM
Qty
1
Ply
1 3607
06/23/2020
W1
(a)(a)
A
B
C
D E F
GHIJKL
5
12
2X4(A1)
3X4
3X6
4X4
3X4
6X6
3X4 3X6
1.5X4
4X8
4X4
3X6
1'10"8 24'3"
SEAT PLATE REQ.
12'10"8 13'3"
26'1"8
4"1 5'8"7Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2 :T2 2x4 SP M-30:
Bot chord 2x4 SP #2
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 10.87 26.12
BC 73 0.00 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
J 1165 /- /- /746 /705 /334
F 972 /- /- /511 /673 /-
Wind reactions based on MWFRS
J Brg Width = 8.0 Min Req = 1.5
F Brg Width = 3.5 Min Req = 1.5
Bearings J & F are a rigid surface.
Bearing J requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 164 -295
B - C 893 -1462
Chords Tens. Comp.
C - D 844 -1204
D - E 844 -1204
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - J 313 -174
J - I 469 -644
I - H 469 -644
Chords Tens. Comp.
H - G 1255 -937
G - F 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
J - B 841 -1027
B - H 858 -426
C - H 243 0
C - G 133 -111
Webs Tens. Comp.
D - G 553 -525
G - E 1404 -985
E - F 703 -910
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.052 D 999 360
VERT(CL): 0.096 D 999 240
HORZ(LL): -0.018 C - -
HORZ(TL): 0.022 G - -
Creep Factor: 2.0
Max TC CSI: 0.909
Max BC CSI: 0.981
Max Web CSI: 0.844
Wgt: 137.9 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B14
Truss Type
HIPM
Qty
1
Ply
1 3603
06/23/2020
T2
W1
(a)(a)
A
B
C D E
FGHIJ
5
12
2X4(A1)
3X4
3X6
3X6
5X8
3X4
2X4
4X8
4X6(R)
3X6
1'10"8 24'3"
SEAT PLATE REQ.
10'10"8 15'3"
26'1"8
4"1 4'10"7**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2 :T2 2x4 SP M-30:
Bot chord 2x4 SP #2
Webs 2x4 SP #3 :W1 2x6 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 10.87 26.12
BC 73 0.00 26.12
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
J 1165 /- /- /746 /705 /334
F 972 /- /- /511 /673 /-
Wind reactions based on MWFRS
J Brg Width = 8.0 Min Req = 1.5
F Brg Width = 3.5 Min Req = 1.5
Bearings J & F are a rigid surface.
Bearing J requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 164 -295
B - C 893 -1462
Chords Tens. Comp.
C - D 844 -1204
D - E 844 -1204
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - J 313 -174
J - I 469 -644
I - H 469 -644
Chords Tens. Comp.
H - G 1255 -937
G - F 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
J - B 841 -1027
B - H 858 -426
C - H 243 0
C - G 133 -111
Webs Tens. Comp.
D - G 553 -525
G - E 1404 -985
E - F 703 -910
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.052 D 999 360
VERT(CL): 0.096 D 999 240
HORZ(LL): -0.018 C - -
HORZ(TL): 0.022 G - -
Creep Factor: 2.0
Max TC CSI: 0.909
Max BC CSI: 0.981
Max Web CSI: 0.844
Wgt: 137.9 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B14
Truss Type
HIPM
Qty
1
Ply
1 3603
06/23/2020
T2
W1
(a)(a)
A
B
C D E
FGHIJ
5
12
2X4(A1)
3X4
3X6
3X6
5X8
3X4
2X4
4X8
4X6(R)
3X6
1'10"8 24'3"
SEAT PLATE REQ.
10'10"8 15'3"
26'1"8
4"1 4'10"7Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP M-30
Bot chord 2x4 SP #2 :B2 2x4 SP M-30:
Webs 2x4 SP #3 :W1, W6 2x6 SP #2:
:W2, W5 2x4 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 62 plf at 0.00 to 62 plf at 8.88
TC: From 31 plf at 8.88 to 31 plf at 26.54
BC: From 20 plf at 0.00 to 20 plf at 8.91
BC: From 10 plf at 8.91 to 10 plf at 26.54
TC: 290 lb Conc. Load at 8.91
TC: 175 lb Conc. Load at 10.94,12.94,14.94,16.94
18.94,20.94,22.94,24.94,25.65
BC: 315 lb Conc. Load at 8.91
BC: 109 lb Conc. Load at 10.94,12.94,14.94,16.94
18.94,20.94,22.94,24.94,25.65
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 8.88 26.54
BC 40 0.00 26.54
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
M 2173 /- /- /- /1782 /-
N 2439 /- /- /- /1969 /-
Wind reactions based on MWFRS
M Brg Width = 8.0 Min Req = 2.6
N Brg Width = 8.0 Min Req = 2.9
Bearings M & N are a rigid surface.
Bearings M & N require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 90 -149
B - C 2967 -3457
C - D 3156 -3835
Chords Tens. Comp.
D - E 2394 -2953
E - F 2394 -2953
F - G 2394 -2953
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - M 157 -50
M - L 489 -347
L - K 3121 -2668
Chords Tens. Comp.
K - J 3121 -2668
J - I 3841 -3180
I - H 89 -72
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - B 1845 -2077
B - L 2724 -2349
C - L 122 0
C - J 860 -582
J - D 315 -92
Webs Tens. Comp.
D - I 946 -1069
F - I 933 -757
I - G 3368 -2730
G - H 1961 -2198
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Varies by Ld Case
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.213 D 999 360
VERT(CL): 0.278 D 999 240
HORZ(LL): -0.047 H - -
HORZ(TL): 0.062 H - -
Creep Factor: 2.0
Max TC CSI: 0.850
Max BC CSI: 0.986
Max Web CSI: 0.943
Wgt: 143.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B15
Truss Type
HIPM
Qty
1
Ply
1 3597
06/23/2020
B2
W1 W2
W5
W6(a)
(a)
A
B
C D E F G
HIJKLM
N
5
12
2X4(A1)
3X6
5X6
5X8
5X6 H0308 3X4
3X4 3X6 3X4
6X10
6X6
3X6
1'10"8 24'8"
SEAT PLATE REQ.SEAT PLATE REQ.
8'10"8 17'8"
26'6"8
4"1 4'0"78'10"14
290#
2'0"6
175#
2'
175#
2'
175#
2'
175#
2'
175#
2'
175#
2'
175#
2'
175#
8"8175#
315#109#109#109#109#109#109#109#109#109#
10"12
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP M-30
Bot chord 2x4 SP #2 :B2 2x4 SP M-30:
Webs 2x4 SP #3 :W1, W6 2x6 SP #2:
:W2, W5 2x4 SP #2:
Bracing
(a) Continuous lateral restraint equally spaced on member.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 62 plf at 0.00 to 62 plf at 8.88
TC: From 31 plf at 8.88 to 31 plf at 26.54
BC: From 20 plf at 0.00 to 20 plf at 8.91
BC: From 10 plf at 8.91 to 10 plf at 26.54
TC: 290 lb Conc. Load at 8.91
TC: 175 lb Conc. Load at 10.94,12.94,14.94,16.94
18.94,20.94,22.94,24.94,25.65
BC: 315 lb Conc. Load at 8.91
BC: 109 lb Conc. Load at 10.94,12.94,14.94,16.94
18.94,20.94,22.94,24.94,25.65
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 8.88 26.54
BC 40 0.00 26.54
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
M 2173 /- /- /- /1782 /-
N 2439 /- /- /- /1969 /-
Wind reactions based on MWFRS
M Brg Width = 8.0 Min Req = 2.6
N Brg Width = 8.0 Min Req = 2.9
Bearings M & N are a rigid surface.
Bearings M & N require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 90 -149
B - C 2967 -3457
C - D 3156 -3835
Chords Tens. Comp.
D - E 2394 -2953
E - F 2394 -2953
F - G 2394 -2953
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - M 157 -50
M - L 489 -347
L - K 3121 -2668
Chords Tens. Comp.
K - J 3121 -2668
J - I 3841 -3180
I - H 89 -72
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - B 1845 -2077
B - L 2724 -2349
C - L 122 0
C - J 860 -582
J - D 315 -92
Webs Tens. Comp.
D - I 946 -1069
F - I 933 -757
I - G 3368 -2730
G - H 1961 -2198
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Varies by Ld Case
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.213 D 999 360
VERT(CL): 0.278 D 999 240
HORZ(LL): -0.047 H - -
HORZ(TL): 0.062 H - -
Creep Factor: 2.0
Max TC CSI: 0.850
Max BC CSI: 0.986
Max Web CSI: 0.943
Wgt: 143.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
B15
Truss Type
HIPM
Qty
1
Ply
1 3597
06/23/2020
B2
W1 W2
W5
W6(a)
(a)
A
B
C D E F G
HIJKLM
N
5
12
2X4(A1)
3X6
5X6
5X8
5X6 H0308 3X4
3X4 3X6 3X4
6X10
6X6
3X6
1'10"8 24'8"
SEAT PLATE REQ.SEAT PLATE REQ.
8'10"8 17'8"
26'6"8
4"1 4'0"78'10"14
290#
2'0"6
175#
2'
175#
2'
175#
2'
175#
2'
175#
2'
175#
2'
175#
2'
175#
8"8175#
315#109#109#109#109#109#109#109#109#109#
10"12
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP M-30
Webs 2x4 SP #3 :W1 2x6 SP #2:
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 62 plf at 0.00 to 62 plf at 10.35
BC: From 20 plf at 0.00 to 20 plf at 10.35
TC: 285 lb Conc. Load at 8.91
BC: 302 lb Conc. Load at 8.91
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 8.87 10.35
BC 120 0.00 10.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
G 660 /- /- /- /522 /-
H 787 /- /- /- /890 /-
Wind reactions based on MWFRS
G Brg Width = 8.0 Min Req = 1.5
H Brg Width = 5.8 Min Req = 1.5
Bearings G & H are a rigid surface.
Bearings G & H require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 328 -383
B - C 315 -399
Chords Tens. Comp.
C - D 21 -20
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - F 386 -322
Chords Tens. Comp.
F - E 188 -205
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - F 417 -400
F - C 109 -59
Webs Tens. Comp.
C - E 504 -462
D - E 58 -54
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Varies by Ld Case
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.013 F 999 360
VERT(CL): -0.023 F 999 240
HORZ(LL): -0.003 B - -
HORZ(TL): 0.006 B - -
Creep Factor: 2.0
Max TC CSI: 0.680
Max BC CSI: 0.760
Max Web CSI: 0.279
Wgt: 58.1 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
D01
Truss Type
HIPM
Qty
1
Ply
1 3899
06/23/2020
W1A
B
C D
EFGH
5
12
2X4(A1)
1.5X4
3X6
5X6 1.5X3
3X6(R)
1'10"8 8'5"12
SEAT PLATE REQ.SEAT PLATE REQ.
8'10"8 1'5"12
10'4"4
4"1 4'0"78'10"14
285#
302#
1'5"6
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP M-30
Webs 2x4 SP #3 :W1 2x6 SP #2:
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 62 plf at 0.00 to 62 plf at 10.35
BC: From 20 plf at 0.00 to 20 plf at 10.35
TC: 285 lb Conc. Load at 8.91
BC: 302 lb Conc. Load at 8.91
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 8.87 10.35
BC 120 0.00 10.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
G 660 /- /- /- /522 /-
H 787 /- /- /- /890 /-
Wind reactions based on MWFRS
G Brg Width = 8.0 Min Req = 1.5
H Brg Width = 5.8 Min Req = 1.5
Bearings G & H are a rigid surface.
Bearings G & H require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 328 -383
B - C 315 -399
Chords Tens. Comp.
C - D 21 -20
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - F 386 -322
Chords Tens. Comp.
F - E 188 -205
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - F 417 -400
F - C 109 -59
Webs Tens. Comp.
C - E 504 -462
D - E 58 -54
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Varies by Ld Case
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.013 F 999 360
VERT(CL): -0.023 F 999 240
HORZ(LL): -0.003 B - -
HORZ(TL): 0.006 B - -
Creep Factor: 2.0
Max TC CSI: 0.680
Max BC CSI: 0.760
Max Web CSI: 0.279
Wgt: 58.1 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
D01
Truss Type
HIPM
Qty
1
Ply
1 3899
06/23/2020
W1A
B
C D
EFGH
5
12
2X4(A1)
1.5X4
3X6
5X6 1.5X3
3X6(R)
1'10"8 8'5"12
SEAT PLATE REQ.SEAT PLATE REQ.
8'10"8 1'5"12
10'4"4
4"1 4'0"78'10"14
285#
302#
1'5"6
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP M-30
Webs 2x4 SP #3 :W1 2x6 SP #2:
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 120 0.00 10.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
E 537 /- /- /561 /303 /318
F 320 /- /- /313 /250 /-
Wind reactions based on MWFRS
E Brg Width = 8.0 Min Req = 1.5
F Brg Width = 5.8 Min Req = 1.5
Bearings E & F are a rigid surface.
Bearings E & F require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 479 -345
Chords Tens. Comp.
B - C 77 -170
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 352 -429
Chords Tens. Comp.
E - D 400 -775
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - B 414 -387
B - D 781 -404
Webs Tens. Comp.
C - D 306 -200
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.024 E 999 360
VERT(CL): -0.028 E 999 240
HORZ(LL): -0.011 C - -
HORZ(TL): 0.013 C - -
Creep Factor: 2.0
Max TC CSI: 0.968
Max BC CSI: 0.721
Max Web CSI: 0.493
Wgt: 53.9 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
D02
Truss Type
MONO
Qty
9
Ply
1 2489
06/23/2020
W1A
B
C
D
E
F
5
12
2X4(A1)
1.5X4
3X6
2X4
3X6(R)
1'10"8 8'5"12
SEAT PLATE REQ.SEAT PLATE REQ.
10'4"4
4"1 4'7"13**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP M-30
Webs 2x4 SP #3 :W1 2x6 SP #2:
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 120 0.00 10.35
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
E 537 /- /- /561 /303 /318
F 320 /- /- /313 /250 /-
Wind reactions based on MWFRS
E Brg Width = 8.0 Min Req = 1.5
F Brg Width = 5.8 Min Req = 1.5
Bearings E & F are a rigid surface.
Bearings E & F require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 479 -345
Chords Tens. Comp.
B - C 77 -170
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 352 -429
Chords Tens. Comp.
E - D 400 -775
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - B 414 -387
B - D 781 -404
Webs Tens. Comp.
C - D 306 -200
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.024 E 999 360
VERT(CL): -0.028 E 999 240
HORZ(LL): -0.011 C - -
HORZ(TL): 0.013 C - -
Creep Factor: 2.0
Max TC CSI: 0.968
Max BC CSI: 0.721
Max Web CSI: 0.493
Wgt: 53.9 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
D02
Truss Type
MONO
Qty
9
Ply
1 2489
06/23/2020
W1A
B
C
D
E
F
5
12
2X4(A1)
1.5X4
3X6
2X4
3X6(R)
1'10"8 8'5"12
SEAT PLATE REQ.SEAT PLATE REQ.
10'4"4
4"1 4'7"13Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP M-30
Bot chord 2x6 SP #2
Webs 2x4 SP #3
:Lt Slider 2x6 SP #2: BLOCK LENGTH = 1.500'
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 75 0.00 8.48
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
E 346 /- /- /366 /194 /184
F 346 /- /- /349 /233 /-
Wind reactions based on MWFRS
E Brg Width = 8.0 Min Req = 1.5
F Brg Width = 5.8 Min Req = 1.5
Bearings E & F are a rigid surface.
Bearings E & F require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 325 -577
Chords Tens. Comp.
B - C 95 -185
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - D 8 -7
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - D 374 -238
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): -0.125 B - -
HORZ(TL): 0.197 B - -
Creep Factor: 2.0
Max TC CSI: 0.709
Max BC CSI: 0.777
Max Web CSI: 0.179
Wgt: 42.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
D03
Truss Type
MONO
Qty
6
Ply
1 2492
06/23/2020
A
B
C
DE F
5
12
3X4(E3)
3X12(E3)
3X4
1.5X4
3X8
8'5"12
SEAT PLATE REQ.SEAT PLATE REQ.1'1"74'7"13**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP M-30
Bot chord 2x6 SP #2
Webs 2x4 SP #3
:Lt Slider 2x6 SP #2: BLOCK LENGTH = 1.500'
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 75 0.00 8.48
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
E 346 /- /- /366 /194 /184
F 346 /- /- /349 /233 /-
Wind reactions based on MWFRS
E Brg Width = 8.0 Min Req = 1.5
F Brg Width = 5.8 Min Req = 1.5
Bearings E & F are a rigid surface.
Bearings E & F require a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 325 -577
Chords Tens. Comp.
B - C 95 -185
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - D 8 -7
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - D 374 -238
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): -0.125 B - -
HORZ(TL): 0.197 B - -
Creep Factor: 2.0
Max TC CSI: 0.709
Max BC CSI: 0.777
Max Web CSI: 0.179
Wgt: 42.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
D03
Truss Type
MONO
Qty
6
Ply
1 2492
06/23/2020
A
B
C
DE F
5
12
3X4(E3)
3X12(E3)
3X4
1.5X4
3X8
8'5"12
SEAT PLATE REQ.SEAT PLATE REQ.1'1"74'7"13Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3 :W1 2x6 SP #2:
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 2 plf at 0.00 to 2 plf at 12.49
BC: From 20 plf at 0.00 to 20 plf at 4.29
BC: From 2 plf at 4.29 to 2 plf at 12.49
TC: -253 lb Conc. Load at 4.29
TC: 93 lb Conc. Load at 7.12
TC: 229 lb Conc. Load at 9.94
BC: -282 lb Conc. Load at 4.29
BC: 15 lb Conc. Load at 7.12
BC: 128 lb Conc. Load at 9.94
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 67 0.00 12.49
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Negative reaction(s) of -189# MAX. from a non-wind load case requires uplift
connection. See Maximum Reactions.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
H 503 /-189 /- /- /1108 /-
E 206 /- /- /- /336 /-
D 115 /- /- /- /130 /-
Wind reactions based on MWFRS
H Brg Width = 11.3 Min Req = 1.5
E Brg Width = 1.5 Min Req = -
D Brg Width = 1.5 Min Req = -
Bearing H is a rigid surface.
Bearing H requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 324 0
B - C 1105 -332
Chords Tens. Comp.
C - D 94 -62
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - H 0 -315
H - G 0 -442
Chords Tens. Comp.
G - F 299 -967
F - E 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
H - B 682 -388
B - G 497 -564
Webs Tens. Comp.
G - C 91 -114
C - F 1030 -318
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 4.50 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Varies by Ld Case
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.037 H 989 360
VERT(CL): 0.039 H 941 240
HORZ(LL): -0.011 F - -
HORZ(TL): 0.011 F - -
Creep Factor: 2.0
Max TC CSI: 0.812
Max BC CSI: 0.993
Max Web CSI: 0.307
Wgt: 56.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
HJ7
Truss Type
HIP_
Qty
3
Ply
1 4044
06/23/2020
W1A
B
C
D
EFG
H
3.54 12
2X4(A1)
2X4
3X6
3X4
3X4
5X6
2'7"1
SEAT PLATE REQ.
12'5"14
4"1 4'0"34'3"7
-253#
2'9"15
93#
2'9"15
229#
-282#
15#
128#
2'6"9
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3 :W1 2x6 SP #2:
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 2 plf at 0.00 to 2 plf at 12.49
BC: From 20 plf at 0.00 to 20 plf at 4.29
BC: From 2 plf at 4.29 to 2 plf at 12.49
TC: -253 lb Conc. Load at 4.29
TC: 93 lb Conc. Load at 7.12
TC: 229 lb Conc. Load at 9.94
BC: -282 lb Conc. Load at 4.29
BC: 15 lb Conc. Load at 7.12
BC: 128 lb Conc. Load at 9.94
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 67 0.00 12.49
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Negative reaction(s) of -189# MAX. from a non-wind load case requires uplift
connection. See Maximum Reactions.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
H 503 /-189 /- /- /1108 /-
E 206 /- /- /- /336 /-
D 115 /- /- /- /130 /-
Wind reactions based on MWFRS
H Brg Width = 11.3 Min Req = 1.5
E Brg Width = 1.5 Min Req = -
D Brg Width = 1.5 Min Req = -
Bearing H is a rigid surface.
Bearing H requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 324 0
B - C 1105 -332
Chords Tens. Comp.
C - D 94 -62
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - H 0 -315
H - G 0 -442
Chords Tens. Comp.
G - F 299 -967
F - E 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
H - B 682 -388
B - G 497 -564
Webs Tens. Comp.
G - C 91 -114
C - F 1030 -318
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 4.50 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Varies by Ld Case
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.037 H 989 360
VERT(CL): 0.039 H 941 240
HORZ(LL): -0.011 F - -
HORZ(TL): 0.011 F - -
Creep Factor: 2.0
Max TC CSI: 0.812
Max BC CSI: 0.993
Max Web CSI: 0.307
Wgt: 56.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
HJ7
Truss Type
HIP_
Qty
3
Ply
1 4044
06/23/2020
W1A
B
C
D
EFG
H
3.54 12
2X4(A1)
2X4
3X6
3X4
3X4
5X6
2'7"1
SEAT PLATE REQ.
12'5"14
4"1 4'0"34'3"7
-253#
2'9"15
93#
2'9"15
229#
-282#
15#
128#
2'6"9
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP M-30
Webs 2x4 SP #3 :W1 2x6 SP #2:
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 2 plf at 0.00 to 2 plf at 12.49
BC: From 20 plf at 0.00 to 20 plf at 4.11
BC: From 2 plf at 4.11 to 2 plf at 12.49
TC: -253 lb Conc. Load at 4.11
TC: 93 lb Conc. Load at 6.94
TC: 229 lb Conc. Load at 9.77
BC: -282 lb Conc. Load at 4.11
BC: 15 lb Conc. Load at 6.94
BC: 128 lb Conc. Load at 9.77
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 73 0.00 12.49
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads and reactions based on MWFRS.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
Negative reaction(s) of -198# MAX. from a non-wind load case requires uplift
connection. See Maximum Reactions.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
H 516 /-198 /- /- /1220 /-
E 193 /- /- /- /386 /-
D 110 /- /- /- /119 /-
Wind reactions based on MWFRS
H Brg Width = 11.3 Min Req = 1.5
E Brg Width = 1.5 Min Req = -
D Brg Width = 1.5 Min Req = -
Bearing H is a rigid surface.
Bearing H requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 665 -23
B - C 666 -5
Chords Tens. Comp.
C - D 96 -63
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - G 12 -639
G - F 187 -758
Chords Tens. Comp.
F - E 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - G 286 -50
G - C 230 -375
Webs Tens. Comp.
C - F 803 -198
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Varies by Ld Case
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.060 G 660 360
VERT(CL): 0.062 G 631 240
HORZ(LL): -0.016 C - -
HORZ(TL): 0.016 C - -
Creep Factor: 2.0
Max TC CSI: 0.831
Max BC CSI: 0.988
Max Web CSI: 0.239
Wgt: 56.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
HJ7P
Truss Type
HIP_
Qty
2
Ply
1 3714
06/23/2020
W1A
B
C
D
EFGH
3.54
12
2X4(A1)
1.5X3
3X6
3X6
5X6
2'7"1
SEAT PLATE REQ.
12'5"14
4"1 4'0"34'1"5
-253#
2'9"15
93#
2'9"15
229#
-282#
15#
128#
2'8"11
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP M-30
Webs 2x4 SP #3 :W1 2x6 SP #2:
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 2 plf at 0.00 to 2 plf at 12.49
BC: From 20 plf at 0.00 to 20 plf at 4.11
BC: From 2 plf at 4.11 to 2 plf at 12.49
TC: -253 lb Conc. Load at 4.11
TC: 93 lb Conc. Load at 6.94
TC: 229 lb Conc. Load at 9.77
BC: -282 lb Conc. Load at 4.11
BC: 15 lb Conc. Load at 6.94
BC: 128 lb Conc. Load at 9.77
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 73 0.00 12.49
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads and reactions based on MWFRS.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
Negative reaction(s) of -198# MAX. from a non-wind load case requires uplift
connection. See Maximum Reactions.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
H 516 /-198 /- /- /1220 /-
E 193 /- /- /- /386 /-
D 110 /- /- /- /119 /-
Wind reactions based on MWFRS
H Brg Width = 11.3 Min Req = 1.5
E Brg Width = 1.5 Min Req = -
D Brg Width = 1.5 Min Req = -
Bearing H is a rigid surface.
Bearing H requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 665 -23
B - C 666 -5
Chords Tens. Comp.
C - D 96 -63
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - G 12 -639
G - F 187 -758
Chords Tens. Comp.
F - E 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - G 286 -50
G - C 230 -375
Webs Tens. Comp.
C - F 803 -198
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Varies by Ld Case
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.060 G 660 360
VERT(CL): 0.062 G 631 240
HORZ(LL): -0.016 C - -
HORZ(TL): 0.016 C - -
Creep Factor: 2.0
Max TC CSI: 0.831
Max BC CSI: 0.988
Max Web CSI: 0.239
Wgt: 56.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
HJ7P
Truss Type
HIP_
Qty
2
Ply
1 3714
06/23/2020
W1A
B
C
D
EFGH
3.54
12
2X4(A1)
1.5X3
3X6
3X6
5X6
2'7"1
SEAT PLATE REQ.
12'5"14
4"1 4'0"34'1"5
-253#
2'9"15
93#
2'9"15
229#
-282#
15#
128#
2'8"11
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x6 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 35 0.00 2.88
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Additional Notes
Negative reaction(s) of -280# MAX. from a non-wind load case requires uplift
connection. See Maximum Reactions.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 771 /- /- /736 /357 /87
D - /-263 /- /152 /305 /-
C - /-280 /- /120 /247 /-
Wind reactions based on MWFRS
F Brg Width = 8.0 Min Req = 1.5
D Brg Width = 1.5 Min Req = -
C Brg Width = 1.5 Min Req = -
Bearing F is a rigid surface.
Bearing F requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 95 -247
Chords Tens. Comp.
B - C 207 -115
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 279 -57
Chords Tens. Comp.
E - D 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - E 972 -435
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.036 E 803 360
VERT(CL): 0.066 E 441 240
HORZ(LL): -0.016 C - -
HORZ(TL): 0.028 C - -
Creep Factor: 2.0
Max TC CSI: 0.377
Max BC CSI: 0.336
Max Web CSI: 0.156
Wgt: 11.9 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J1
Truss Type
JACK
Qty
6
Ply
1 4047
06/23/2020
A
B
C
D
E
F
5
12
2X4(A1)
2X4
3X6
1'10"8
SEAT PLATE REQ.
2'5"4 5"4
2'10"8
4"1 1'6"7HB 5"4
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x6 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 35 0.00 2.88
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Additional Notes
Negative reaction(s) of -280# MAX. from a non-wind load case requires uplift
connection. See Maximum Reactions.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 771 /- /- /736 /357 /87
D - /-263 /- /152 /305 /-
C - /-280 /- /120 /247 /-
Wind reactions based on MWFRS
F Brg Width = 8.0 Min Req = 1.5
D Brg Width = 1.5 Min Req = -
C Brg Width = 1.5 Min Req = -
Bearing F is a rigid surface.
Bearing F requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 95 -247
Chords Tens. Comp.
B - C 207 -115
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 279 -57
Chords Tens. Comp.
E - D 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - E 972 -435
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.036 E 803 360
VERT(CL): 0.066 E 441 240
HORZ(LL): -0.016 C - -
HORZ(TL): 0.028 C - -
Creep Factor: 2.0
Max TC CSI: 0.377
Max BC CSI: 0.336
Max Web CSI: 0.156
Wgt: 11.9 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J1
Truss Type
JACK
Qty
6
Ply
1 4047
06/23/2020
A
B
C
D
E
F
5
12
2X4(A1)
2X4
3X6
1'10"8
SEAT PLATE REQ.
2'5"4 5"4
2'10"8
4"1 1'6"7HB 5"4
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x6 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 35 0.00 2.88
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
Negative reaction(s) of -280# MAX. from a non-wind load case requires uplift
connection. See Maximum Reactions.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 771 /- /- /798 /419 /87
D - /-263 /- /154 /307 /-
C - /-280 /- /125 /253 /-
Wind reactions based on MWFRS
F Brg Width = 8.0 Min Req = 1.5
D Brg Width = 1.5 Min Req = -
C Brg Width = 1.5 Min Req = -
Bearing F is a rigid surface.
Bearing F requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 95 -220
Chords Tens. Comp.
B - C 170 -115
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 258 -57
Chords Tens. Comp.
E - D 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - E 849 -435
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.043 E 682 360
VERT(CL): 0.066 E 441 240
HORZ(LL): -0.018 C - -
HORZ(TL): 0.028 C - -
Creep Factor: 2.0
Max TC CSI: 0.312
Max BC CSI: 0.257
Max Web CSI: 0.133
Wgt: 11.9 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J1P
Truss Type
JACK
Qty
4
Ply
1 3702
06/23/2020
A
B
C
D
E
F
5
12
2X4(A1)
2X4
3X6
1'10"8
SEAT PLATE REQ.
2'5"4 5"4
2'10"8
4"1 1'6"7HB 5"4
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x6 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 35 0.00 2.88
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Additional Notes
Negative reaction(s) of -280# MAX. from a non-wind load case requires uplift
connection. See Maximum Reactions.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 771 /- /- /798 /419 /87
D - /-263 /- /154 /307 /-
C - /-280 /- /125 /253 /-
Wind reactions based on MWFRS
F Brg Width = 8.0 Min Req = 1.5
D Brg Width = 1.5 Min Req = -
C Brg Width = 1.5 Min Req = -
Bearing F is a rigid surface.
Bearing F requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 95 -220
Chords Tens. Comp.
B - C 170 -115
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 258 -57
Chords Tens. Comp.
E - D 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - E 849 -435
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.043 E 682 360
VERT(CL): 0.066 E 441 240
HORZ(LL): -0.018 C - -
HORZ(TL): 0.028 C - -
Creep Factor: 2.0
Max TC CSI: 0.312
Max BC CSI: 0.257
Max Web CSI: 0.133
Wgt: 11.9 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J1P
Truss Type
JACK
Qty
4
Ply
1 3702
06/23/2020
A
B
C
D
E
F
5
12
2X4(A1)
2X4
3X6
1'10"8
SEAT PLATE REQ.
2'5"4 5"4
2'10"8
4"1 1'6"7HB 5"4
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3 :W1 2x6 SP #2:
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 51 0.00 4.21
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
E 362 /- /- /314 /138 /128
D - /-60 /- /50 /79 /-
C 45 /- /- /17 /48 /-
Wind reactions based on MWFRS
E Brg Width = 8.0 Min Req = 1.5
D Brg Width = 1.5 Min Req = -
C Brg Width = 1.5 Min Req = -
Bearing E is a rigid surface.
Bearing E requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 211 -256
Chords Tens. Comp.
B - C 17 -46
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 279 -168
Chords Tens. Comp.
E - D 71 -147
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - B 374 -300
B - D 168 -81
Webs Tens. Comp.
C - D 0 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.003 E 999 360
VERT(CL): 0.006 E 999 240
HORZ(LL): -0.001 C - -
HORZ(TL): 0.001 C - -
Creep Factor: 2.0
Max TC CSI: 0.117
Max BC CSI: 0.061
Max Web CSI: 0.054
Wgt: 21.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J2
Truss Type
MONO
Qty
2
Ply
1 4066
06/23/2020
W1A
B
C
D
E
5
12
2X4(A1)
1.5X3
3X6
1.5X3
3X4(R)
1'10"8
SEAT PLATE REQ.
4'2"8
4"1 2'1"1**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3 :W1 2x6 SP #2:
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 51 0.00 4.21
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
E 362 /- /- /314 /138 /128
D - /-60 /- /50 /79 /-
C 45 /- /- /17 /48 /-
Wind reactions based on MWFRS
E Brg Width = 8.0 Min Req = 1.5
D Brg Width = 1.5 Min Req = -
C Brg Width = 1.5 Min Req = -
Bearing E is a rigid surface.
Bearing E requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 211 -256
Chords Tens. Comp.
B - C 17 -46
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 279 -168
Chords Tens. Comp.
E - D 71 -147
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - B 374 -300
B - D 168 -81
Webs Tens. Comp.
C - D 0 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.003 E 999 360
VERT(CL): 0.006 E 999 240
HORZ(LL): -0.001 C - -
HORZ(TL): 0.001 C - -
Creep Factor: 2.0
Max TC CSI: 0.117
Max BC CSI: 0.061
Max Web CSI: 0.054
Wgt: 21.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J2
Truss Type
MONO
Qty
2
Ply
1 4066
06/23/2020
W1A
B
C
D
E
5
12
2X4(A1)
1.5X3
3X6
1.5X3
3X4(R)
1'10"8
SEAT PLATE REQ.
4'2"8
4"1 2'1"1Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3
:Lt Slider 2x8 SP 2400f-1.8E: BLOCK LENGTH = 1.500'
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 28 0.00 2.33
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 95 /- /- /55 /8 /50
D 46 /- /- /25 /- /-
C 70 /- /- /41 /70 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req = 1.5
D Brg Width = 1.5 Min Req = -
C Brg Width = 1.5 Min Req = -
Bearing A is a rigid surface.
Bearing A requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 64 -150
Chords Tens. Comp.
B - C 26 -65
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - D 4 -9
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - D 0 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): -0.006 B - -
HORZ(TL): 0.007 B - -
Creep Factor: 2.0
Max TC CSI: 0.205
Max BC CSI: 0.058
Max Web CSI: 0.045
Wgt: 16.8 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J2A
Truss Type
MONO
Qty
2
Ply
1 4069
06/23/2020
A
B
C
D
5
12
3X4(E3)
3X12(E3)
3X4
1.5X3
1.5X4
SEAT PLATE REQ.
2'4"1'1"72'1"1**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3
:Lt Slider 2x8 SP 2400f-1.8E: BLOCK LENGTH = 1.500'
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 28 0.00 2.33
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Right end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 95 /- /- /55 /8 /50
D 46 /- /- /25 /- /-
C 70 /- /- /41 /70 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req = 1.5
D Brg Width = 1.5 Min Req = -
C Brg Width = 1.5 Min Req = -
Bearing A is a rigid surface.
Bearing A requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 64 -150
Chords Tens. Comp.
B - C 26 -65
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - D 4 -9
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - D 0 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): -0.006 B - -
HORZ(TL): 0.007 B - -
Creep Factor: 2.0
Max TC CSI: 0.205
Max BC CSI: 0.058
Max Web CSI: 0.045
Wgt: 16.8 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J2A
Truss Type
MONO
Qty
2
Ply
1 4069
06/23/2020
A
B
C
D
5
12
3X4(E3)
3X12(E3)
3X4
1.5X3
1.5X4
SEAT PLATE REQ.
2'4"1'1"72'1"1Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x6 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 59 0.00 4.88
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 398 /- /- /336 /153 /149
D 8 /-24 /- /34 /34 /-
C 46 /-24 /- /11 /81 /-
Wind reactions based on MWFRS
F Brg Width = 8.0 Min Req = 1.5
D Brg Width = 1.5 Min Req = -
C Brg Width = 1.5 Min Req = -
Bearing F is a rigid surface.
Bearing F requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 96 -194
Chords Tens. Comp.
B - C 18 -79
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 217 -63
Chords Tens. Comp.
E - D 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - E 371 -267
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 4.50 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.047 E 614 360
VERT(CL): 0.088 E 332 240
HORZ(LL): -0.020 C - -
HORZ(TL): 0.037 C - -
Creep Factor: 2.0
Max TC CSI: 0.283
Max BC CSI: 0.237
Max Web CSI: 0.054
Wgt: 17.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J3
Truss Type
JACK
Qty
6
Ply
1 4041
06/23/2020
A
B
C
DEF
5
12
2X4(A1)
1.5X3
1.5X3
1'10"8
SEAT PLATE REQ.
2'5"4 2'5"4
4'10"8
4"1 2'4"7HB 2'5"4
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x6 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 59 0.00 4.88
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 398 /- /- /336 /153 /149
D 8 /-24 /- /34 /34 /-
C 46 /-24 /- /11 /81 /-
Wind reactions based on MWFRS
F Brg Width = 8.0 Min Req = 1.5
D Brg Width = 1.5 Min Req = -
C Brg Width = 1.5 Min Req = -
Bearing F is a rigid surface.
Bearing F requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 96 -194
Chords Tens. Comp.
B - C 18 -79
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 217 -63
Chords Tens. Comp.
E - D 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - E 371 -267
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 4.50 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.047 E 614 360
VERT(CL): 0.088 E 332 240
HORZ(LL): -0.020 C - -
HORZ(TL): 0.037 C - -
Creep Factor: 2.0
Max TC CSI: 0.283
Max BC CSI: 0.237
Max Web CSI: 0.054
Wgt: 17.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J3
Truss Type
JACK
Qty
6
Ply
1 4041
06/23/2020
A
B
C
DEF
5
12
2X4(A1)
1.5X3
1.5X3
1'10"8
SEAT PLATE REQ.
2'5"4 2'5"4
4'10"8
4"1 2'4"7HB 2'5"4
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x6 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 59 0.00 4.88
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 398 /- /- /414 /221 /149
D 8 /-24 /- /27 /25 /-
C 46 /-24 /- /8 /80 /-
Wind reactions based on MWFRS
F Brg Width = 8.0 Min Req = 1.5
D Brg Width = 1.5 Min Req = -
C Brg Width = 1.5 Min Req = -
Bearing F is a rigid surface.
Bearing F requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 96 -231
Chords Tens. Comp.
B - C 18 -79
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 246 -63
Chords Tens. Comp.
E - D 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - E 420 -267
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 4.50 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.056 E 522 360
VERT(CL): 0.088 E 332 240
HORZ(LL): -0.024 C - -
HORZ(TL): 0.037 C - -
Creep Factor: 2.0
Max TC CSI: 0.287
Max BC CSI: 0.367
Max Web CSI: 0.079
Wgt: 17.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J3P
Truss Type
JACK
Qty
4
Ply
1 3705
06/23/2020
A
B
C
DEF
5
12
2X4(A1)
1.5X3
1.5X4
1'10"8
SEAT PLATE REQ.
2'5"4 2'5"4
4'10"8
4"1 2'4"7HB 2'5"4
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x6 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 59 0.00 4.88
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 398 /- /- /414 /221 /149
D 8 /-24 /- /27 /25 /-
C 46 /-24 /- /8 /80 /-
Wind reactions based on MWFRS
F Brg Width = 8.0 Min Req = 1.5
D Brg Width = 1.5 Min Req = -
C Brg Width = 1.5 Min Req = -
Bearing F is a rigid surface.
Bearing F requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 96 -231
Chords Tens. Comp.
B - C 18 -79
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 246 -63
Chords Tens. Comp.
E - D 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - E 420 -267
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 4.50 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.056 E 522 360
VERT(CL): 0.088 E 332 240
HORZ(LL): -0.024 C - -
HORZ(TL): 0.037 C - -
Creep Factor: 2.0
Max TC CSI: 0.287
Max BC CSI: 0.367
Max Web CSI: 0.079
Wgt: 17.5 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J3P
Truss Type
JACK
Qty
4
Ply
1 3705
06/23/2020
A
B
C
DEF
5
12
2X4(A1)
1.5X3
1.5X4
1'10"8
SEAT PLATE REQ.
2'5"4 2'5"4
4'10"8
4"1 2'4"7HB 2'5"4
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x6 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 75 0.00 6.88
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 435 /- /- /343 /179 /210
D 64 /- /- /35 /5 /-
C 114 /- /- /49 /157 /-
Wind reactions based on MWFRS
F Brg Width = 8.0 Min Req = 1.5
D Brg Width = 1.5 Min Req = -
C Brg Width = 1.5 Min Req = -
Bearing F is a rigid surface.
Bearing F requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 100 -236
Chords Tens. Comp.
B - C 44 -125
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 250 -69
Chords Tens. Comp.
E - D 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - E 413 -320
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 4.50 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.095 E 307 360
VERT(CL): 0.096 E 303 240
HORZ(LL): -0.043 C - -
HORZ(TL): 0.049 C - -
Creep Factor: 2.0
Max TC CSI: 0.457
Max BC CSI: 0.322
Max Web CSI: 0.074
Wgt: 23.1 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J5
Truss Type
JACK
Qty
6
Ply
1 4050
06/23/2020
A
B
C
DEF
5
12
2X4(A1)
1.5X3
1.5X4
1'10"8
SEAT PLATE REQ.
2'5"4 4'5"4
6'10"8
4"1 3'2"7HB 4'5"4
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x6 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 75 0.00 6.88
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 435 /- /- /343 /179 /210
D 64 /- /- /35 /5 /-
C 114 /- /- /49 /157 /-
Wind reactions based on MWFRS
F Brg Width = 8.0 Min Req = 1.5
D Brg Width = 1.5 Min Req = -
C Brg Width = 1.5 Min Req = -
Bearing F is a rigid surface.
Bearing F requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 100 -236
Chords Tens. Comp.
B - C 44 -125
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 250 -69
Chords Tens. Comp.
E - D 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - E 413 -320
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 4.50 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.095 E 307 360
VERT(CL): 0.096 E 303 240
HORZ(LL): -0.043 C - -
HORZ(TL): 0.049 C - -
Creep Factor: 2.0
Max TC CSI: 0.457
Max BC CSI: 0.322
Max Web CSI: 0.074
Wgt: 23.1 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J5
Truss Type
JACK
Qty
6
Ply
1 4050
06/23/2020
A
B
C
DEF
5
12
2X4(A1)
1.5X3
1.5X4
1'10"8
SEAT PLATE REQ.
2'5"4 4'5"4
6'10"8
4"1 3'2"7HB 4'5"4
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x6 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 75 0.00 6.88
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 435 /- /- /454 /244 /210
D 64 /- /- /119 /79 /-
C 114 /- /- /54 /155 /-
Wind reactions based on MWFRS
F Brg Width = 8.0 Min Req = 1.5
D Brg Width = 1.5 Min Req = -
C Brg Width = 1.5 Min Req = -
Bearing F is a rigid surface.
Bearing F requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 100 -263
Chords Tens. Comp.
B - C 44 -124
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 275 -69
Chords Tens. Comp.
E - D 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - E 423 -320
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 4.50 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.087 E 333 360
VERT(CL): 0.096 E 303 240
HORZ(LL): -0.040 C - -
HORZ(TL): 0.046 C - -
Creep Factor: 2.0
Max TC CSI: 0.449
Max BC CSI: 0.421
Max Web CSI: 0.088
Wgt: 23.1 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J5P
Truss Type
JACK
Qty
4
Ply
1 3708
06/23/2020
A
B
C
DEF
5
12
2X4(A1)
1.5X3
1.5X4
1'10"8
SEAT PLATE REQ.
2'5"4 4'5"4
6'10"8
4"1 3'2"7HB 4'5"4
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x6 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 75 0.00 6.88
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 435 /- /- /454 /244 /210
D 64 /- /- /119 /79 /-
C 114 /- /- /54 /155 /-
Wind reactions based on MWFRS
F Brg Width = 8.0 Min Req = 1.5
D Brg Width = 1.5 Min Req = -
C Brg Width = 1.5 Min Req = -
Bearing F is a rigid surface.
Bearing F requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 100 -263
Chords Tens. Comp.
B - C 44 -124
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 275 -69
Chords Tens. Comp.
E - D 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - E 423 -320
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 4.50 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.087 E 333 360
VERT(CL): 0.096 E 303 240
HORZ(LL): -0.040 C - -
HORZ(TL): 0.046 C - -
Creep Factor: 2.0
Max TC CSI: 0.449
Max BC CSI: 0.421
Max Web CSI: 0.088
Wgt: 23.1 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J5P
Truss Type
JACK
Qty
4
Ply
1 3708
06/23/2020
A
B
C
DEF
5
12
2X4(A1)
1.5X3
1.5X4
1'10"8
SEAT PLATE REQ.
2'5"4 4'5"4
6'10"8
4"1 3'2"7HB 4'5"4
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP M-30
Bot chord 2x4 SP M-30
Webs 2x6 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 75 0.00 8.88
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 500 /- /- /376 /214 /272
D 109 /- /- /59 /7 /-
C 175 /- /- /88 /226 /-
Wind reactions based on MWFRS
F Brg Width = 8.0 Min Req = 1.5
D Brg Width = 1.5 Min Req = -
C Brg Width = 1.5 Min Req = -
Bearing F is a rigid surface.
Bearing F requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 101 -284
Chords Tens. Comp.
B - C 67 -158
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 282 -70
Chords Tens. Comp.
E - D 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - E 480 -395
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 4.50 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.217 E 134 360
VERT(CL): 0.272 E 107 240
HORZ(LL): -0.096 C - -
HORZ(TL): 0.108 C - -
Creep Factor: 2.0
Max TC CSI: 0.425
Max BC CSI: 0.332
Max Web CSI: 0.110
Wgt: 28.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J7
Truss Type
EJAC
Qty
26
Ply
1 3774
06/23/2020
A
B
C
DEF
5
12
2X4(A1)
1.5X4
1.5X4
1'10"8
SEAT PLATE REQ.
2'5"4 6'5"4
8'10"8
4"1 4'0"7HB 6'5"4
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP M-30
Bot chord 2x4 SP M-30
Webs 2x6 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 75 0.00 8.88
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 500 /- /- /376 /214 /272
D 109 /- /- /59 /7 /-
C 175 /- /- /88 /226 /-
Wind reactions based on MWFRS
F Brg Width = 8.0 Min Req = 1.5
D Brg Width = 1.5 Min Req = -
C Brg Width = 1.5 Min Req = -
Bearing F is a rigid surface.
Bearing F requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 101 -284
Chords Tens. Comp.
B - C 67 -158
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 282 -70
Chords Tens. Comp.
E - D 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - E 480 -395
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 4.50 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.217 E 134 360
VERT(CL): 0.272 E 107 240
HORZ(LL): -0.096 C - -
HORZ(TL): 0.108 C - -
Creep Factor: 2.0
Max TC CSI: 0.425
Max BC CSI: 0.332
Max Web CSI: 0.110
Wgt: 28.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J7
Truss Type
EJAC
Qty
26
Ply
1 3774
06/23/2020
A
B
C
DEF
5
12
2X4(A1)
1.5X4
1.5X4
1'10"8
SEAT PLATE REQ.
2'5"4 6'5"4
8'10"8
4"1 4'0"7HB 6'5"4
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP M-30
Bot chord 2x4 SP M-30 :B2 2x4 SP #2:
Webs 2x6 SP #2 :W2 2x4 SP #3:
Plating Notes
All plates are 1.5X3 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 51 0.00 4.10
BC 75 4.10 9.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
G 484 /- /- /365 /132 /193
C 183 /- /- /96 /154 /-
D 117 /- /- /63 /- /-
Wind reactions based on MWFRS
G Brg Width = 8.0 Min Req = 1.5
C Brg Width = 1.5 Min Req = -
D Brg Width = 1.5 Min Req = -
Bearing G is a rigid surface.
Bearing G requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 126 -342
Chords Tens. Comp.
B - C 70 -158
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - G 338 -84
G - E 16 -68
Chords Tens. Comp.
B - F 67 -15
F - D 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
G - B 516 -443
Webs Tens. Comp.
F - E 36 -112
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.135 G 196 360
VERT(CL): -0.172 G 999 240
HORZ(LL): -0.064 G - -
HORZ(TL): 0.080 G - -
Creep Factor: 2.0
Max TC CSI: 0.433
Max BC CSI: 0.422
Max Web CSI: 0.142
Wgt: 34.3 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J7C
Truss Type
EJAC
Qty
5
Ply
1 3664
06/23/2020
B2W2A
B
C
D
EF
G
5
12
2X4(A1)
1.5X4
3X6
1'10"8
SEAT PLATE REQ.
4'3"4'9"
9'
4"11'4'0"7HB 4'7"8
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP M-30
Bot chord 2x4 SP M-30 :B2 2x4 SP #2:
Webs 2x6 SP #2 :W2 2x4 SP #3:
Plating Notes
All plates are 1.5X3 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 51 0.00 4.10
BC 75 4.10 9.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
G 484 /- /- /365 /132 /193
C 183 /- /- /96 /154 /-
D 117 /- /- /63 /- /-
Wind reactions based on MWFRS
G Brg Width = 8.0 Min Req = 1.5
C Brg Width = 1.5 Min Req = -
D Brg Width = 1.5 Min Req = -
Bearing G is a rigid surface.
Bearing G requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 126 -342
Chords Tens. Comp.
B - C 70 -158
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - G 338 -84
G - E 16 -68
Chords Tens. Comp.
B - F 67 -15
F - D 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
G - B 516 -443
Webs Tens. Comp.
F - E 36 -112
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h/2 to h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.135 G 196 360
VERT(CL): -0.172 G 999 240
HORZ(LL): -0.064 G - -
HORZ(TL): 0.080 G - -
Creep Factor: 2.0
Max TC CSI: 0.433
Max BC CSI: 0.422
Max Web CSI: 0.142
Wgt: 34.3 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J7C
Truss Type
EJAC
Qty
5
Ply
1 3664
06/23/2020
B2W2A
B
C
D
EF
G
5
12
2X4(A1)
1.5X4
3X6
1'10"8
SEAT PLATE REQ.
4'3"4'9"
9'
4"11'4'0"7HB 4'7"8
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x6 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 75 0.00 8.88
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 500 /- /- /522 /282 /272
D 109 /- /- /195 /125 /-
C 175 /- /- /97 /223 /-
Wind reactions based on MWFRS
F Brg Width = 8.0 Min Req = 1.5
D Brg Width = 1.5 Min Req = -
C Brg Width = 1.5 Min Req = -
Bearing F is a rigid surface.
Bearing F requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 107 -293
Chords Tens. Comp.
B - C 67 -157
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 302 -75
Chords Tens. Comp.
E - D 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - E 443 -396
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 4.50 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.239 E 122 360
VERT(CL): 0.293 E 99 240
HORZ(LL): -0.105 C - -
HORZ(TL): 0.118 C - -
Creep Factor: 2.0
Max TC CSI: 0.773
Max BC CSI: 0.668
Max Web CSI: 0.131
Wgt: 28.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J7P
Truss Type
EJAC
Qty
6
Ply
1 3896
06/23/2020
A
B
C
DEF
5
12
2X4(A1)
1.5X4
1.5X4
1'10"8
SEAT PLATE REQ.
2'5"4 6'5"4
8'10"8
4"1 4'0"7HB 6'5"4
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x6 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 75 0.00 8.88
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Left cantilever is exposed to wind
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 500 /- /- /522 /282 /272
D 109 /- /- /195 /125 /-
C 175 /- /- /97 /223 /-
Wind reactions based on MWFRS
F Brg Width = 8.0 Min Req = 1.5
D Brg Width = 1.5 Min Req = -
C Brg Width = 1.5 Min Req = -
Bearing F is a rigid surface.
Bearing F requires a seat plate.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 107 -293
Chords Tens. Comp.
B - C 67 -157
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 302 -75
Chords Tens. Comp.
E - D 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - E 443 -396
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 4.50 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.239 E 122 360
VERT(CL): 0.293 E 99 240
HORZ(LL): -0.105 C - -
HORZ(TL): 0.118 C - -
Creep Factor: 2.0
Max TC CSI: 0.773
Max BC CSI: 0.668
Max Web CSI: 0.131
Wgt: 28.7 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
J7P
Truss Type
EJAC
Qty
6
Ply
1 3896
06/23/2020
A
B
C
DEF
5
12
2X4(A1)
1.5X4
1.5X4
1'10"8
SEAT PLATE REQ.
2'5"4 6'5"4
8'10"8
4"1 4'0"7HB 6'5"4
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 2.25 7.17
BC 110 0.15 9.28
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Additional Notes
See STD DETAILS for valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 91 /- /- /44 /44 /6
Wind reactions based on MWFRS
B Brg Width = 113 Min Req = -
Bearing B is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 17 0
B - C 699 -704
C - D 667 -657
Chords Tens. Comp.
D - E 698 -704
E - F 17 0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - E 657 -538
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.015 C 999 360
VERT(CL): 0.021 999 240
HORZ(LL): 0.007 - -
HORZ(TL): 0.009 - -
Creep Factor: 2.0
Max TC CSI: 0.414
Max BC CSI: 0.887
Max Web CSI: 0.000
Wgt: 32.2 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
PB01
Truss Type
VAL
Qty
1
Ply
1 3732
06/23/2020
A
B
C D
E
F
5
12
2X4(A1)
5X6 5X6
2X4(A1)
9'5"2
2'3"1 4'11"2'3"1
1'1"1'1"
3"141'3"31'4"13**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 2.25 7.17
BC 110 0.15 9.28
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Additional Notes
See STD DETAILS for valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 91 /- /- /44 /44 /6
Wind reactions based on MWFRS
B Brg Width = 113 Min Req = -
Bearing B is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 17 0
B - C 699 -704
C - D 667 -657
Chords Tens. Comp.
D - E 698 -704
E - F 17 0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - E 657 -538
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.015 C 999 360
VERT(CL): 0.021 999 240
HORZ(LL): 0.007 - -
HORZ(TL): 0.009 - -
Creep Factor: 2.0
Max TC CSI: 0.414
Max BC CSI: 0.887
Max Web CSI: 0.000
Wgt: 32.2 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
PB01
Truss Type
VAL
Qty
1
Ply
1 3732
06/23/2020
A
B
C D
E
F
5
12
2X4(A1)
5X6 5X6
2X4(A1)
9'5"2
2'3"1 4'11"2'3"1
1'1"1'1"
3"141'3"31'4"13Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 110 0.15 9.28
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Additional Notes
See STD DETAILS for valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 91 /- /- /45 /28 /9
Wind reactions based on MWFRS
B Brg Width = 113 Min Req = -
Bearing B is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 17 0
B - C 235 -190
Chords Tens. Comp.
C - D 232 -190
D - E 17 0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 128 -64
Chords Tens. Comp.
F - D 128 -64
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 113 -130
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.007 F 999 360
VERT(CL): 0.014 F 999 240
HORZ(LL): -0.004 F - -
HORZ(TL): 0.007 F - -
Creep Factor: 2.0
Max TC CSI: 0.352
Max BC CSI: 0.266
Max Web CSI: 0.034
Wgt: 36.4 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
PB04
Truss Type
VAL
Qty
3
Ply
1 3738
06/23/2020
A
B
C
D
E
F
5
12
2X4(A1)
4X4
1.5X3
2X4(A1)
9'5"2
4'8"9 4'8"9
1'1"1'1"
3"142'3"72'5"1**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 110 0.15 9.28
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Additional Notes
See STD DETAILS for valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 91 /- /- /45 /28 /9
Wind reactions based on MWFRS
B Brg Width = 113 Min Req = -
Bearing B is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 17 0
B - C 235 -190
Chords Tens. Comp.
C - D 232 -190
D - E 17 0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 128 -64
Chords Tens. Comp.
F - D 128 -64
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 113 -130
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.007 F 999 360
VERT(CL): 0.014 F 999 240
HORZ(LL): -0.004 F - -
HORZ(TL): 0.007 F - -
Creep Factor: 2.0
Max TC CSI: 0.352
Max BC CSI: 0.266
Max Web CSI: 0.034
Wgt: 36.4 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
PB04
Truss Type
VAL
Qty
3
Ply
1 3738
06/23/2020
A
B
C
D
E
F
5
12
2X4(A1)
4X4
1.5X3
2X4(A1)
9'5"2
4'8"9 4'8"9
1'1"1'1"
3"142'3"72'5"1Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 2.71 6.71
BC 110 0.15 9.28
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Additional Notes
See STD DETAILS for valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 91 /- /- /44 /41 /6
Wind reactions based on MWFRS
B Brg Width = 113 Min Req = -
Bearing B is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 17 0
B - C 344 -295
C - D 345 -249
Chords Tens. Comp.
D - E 345 -249
E - F 343 -295
F - G 17 0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 249 -203
Chords Tens. Comp.
H - F 249 -203
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - H 238 -170
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.007 E 999 360
VERT(CL): 0.013 E 999 240
HORZ(LL): 0.003 E - -
HORZ(TL): 0.004 E - -
Creep Factor: 2.0
Max TC CSI: 0.109
Max BC CSI: 0.187
Max Web CSI: 0.071
Wgt: 35.0 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
PB05
Truss Type
VAL
Qty
1
Ply
1 3741
06/23/2020
A
B
C D E
F
G
H
5
12
2X4(A1)
5X6 1.5X3
1.5X3
5X6
2X4(A1)
9'5"2
2'8"9 4'2'8"9
1'1"1'1"
3"141'5"71'7"1**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 2.71 6.71
BC 110 0.15 9.28
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Additional Notes
See STD DETAILS for valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 91 /- /- /44 /41 /6
Wind reactions based on MWFRS
B Brg Width = 113 Min Req = -
Bearing B is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 17 0
B - C 344 -295
C - D 345 -249
Chords Tens. Comp.
D - E 345 -249
E - F 343 -295
F - G 17 0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 249 -203
Chords Tens. Comp.
H - F 249 -203
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - H 238 -170
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.007 E 999 360
VERT(CL): 0.013 E 999 240
HORZ(LL): 0.003 E - -
HORZ(TL): 0.004 E - -
Creep Factor: 2.0
Max TC CSI: 0.109
Max BC CSI: 0.187
Max Web CSI: 0.071
Wgt: 35.0 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
PB05
Truss Type
VAL
Qty
1
Ply
1 3741
06/23/2020
A
B
C D E
F
G
H
5
12
2X4(A1)
5X6 1.5X3
1.5X3
5X6
2X4(A1)
9'5"2
2'8"9 4'2'8"9
1'1"1'1"
3"141'5"71'7"1Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 0 4.25 4.71
TC 24 4.71 5.17
BC 110 0.15 9.28
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Additional Notes
See STD DETAILS for valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 91 /- /- /45 /30 /8
Wind reactions based on MWFRS
B Brg Width = 113 Min Req = -
Bearing B is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 17 0
B - C 254 -209
C - D 284 -156
Chords Tens. Comp.
D - E 284 -156
E - F 251 -209
F - G 17 0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 157 -99
Chords Tens. Comp.
H - F 157 -99
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - H 191 -171
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.005 H 999 360
VERT(CL): 0.009 H 999 240
HORZ(LL): -0.002 H - -
HORZ(TL): 0.005 H - -
Creep Factor: 2.0
Max TC CSI: 0.242
Max BC CSI: 0.248
Max Web CSI: 0.057
Wgt: 35.0 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
PB3
Truss Type
VAL
Qty
1
Ply
1 3735
06/23/2020
A
B
C D E
F
G
H
5
12
2X4(A1)
5X6
1.5X3
1.5X3
5X6
2X4(A1)
9'5"2
4'3"1 11"4'3"1
1'1"1'1"
3"142'1"32'2"13**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 0 4.25 4.71
TC 24 4.71 5.17
BC 110 0.15 9.28
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Additional Notes
See STD DETAILS for valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 91 /- /- /45 /30 /8
Wind reactions based on MWFRS
B Brg Width = 113 Min Req = -
Bearing B is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 17 0
B - C 254 -209
C - D 284 -156
Chords Tens. Comp.
D - E 284 -156
E - F 251 -209
F - G 17 0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 157 -99
Chords Tens. Comp.
H - F 157 -99
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - H 191 -171
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: h to 2h
C&C Dist a: 3.00 ft
Loc. from endwall: not in 9.00 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.005 H 999 360
VERT(CL): 0.009 H 999 240
HORZ(LL): -0.002 H - -
HORZ(TL): 0.005 H - -
Creep Factor: 2.0
Max TC CSI: 0.242
Max BC CSI: 0.248
Max Web CSI: 0.057
Wgt: 35.0 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
PB3
Truss Type
VAL
Qty
1
Ply
1 3735
06/23/2020
A
B
C D E
F
G
H
5
12
2X4(A1)
5X6
1.5X3
1.5X3
5X6
2X4(A1)
9'5"2
4'3"1 11"4'3"1
1'1"1'1"
3"142'1"32'2"13Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 30 0.00 2.48
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Additional Notes
See STD DETAILS for valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
C* 83 /- /- /33 /26 /8
Wind reactions based on MWFRS
C Brg Width = 29.7 Min Req = -
Bearing A is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 62 -75
Chords Tens. Comp.
B - C 62 -75
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - C 74 -34
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 4.50 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 999 360
VERT(CL): 0.002 999 240
HORZ(LL): -0.000 - -
HORZ(TL): 0.001 - -
Creep Factor: 2.0
Max TC CSI: 0.024
Max BC CSI: 0.042
Max Web CSI: 0.000
Wgt: 7.0 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
V01
Truss Type
VAL
Qty
1
Ply
1 4033
06/23/2020
A
B
C
8
12
2X4(D8R)
3X4
2X4(D8R)
2'5"11
5"3 9"11 9"11 5"3
0"410"2**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 30 0.00 2.48
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Additional Notes
See STD DETAILS for valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
C* 83 /- /- /33 /26 /8
Wind reactions based on MWFRS
C Brg Width = 29.7 Min Req = -
Bearing A is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 62 -75
Chords Tens. Comp.
B - C 62 -75
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - C 74 -34
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 4.50 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 999 360
VERT(CL): 0.002 999 240
HORZ(LL): -0.000 - -
HORZ(TL): 0.001 - -
Creep Factor: 2.0
Max TC CSI: 0.024
Max BC CSI: 0.042
Max Web CSI: 0.000
Wgt: 7.0 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
V01
Truss Type
VAL
Qty
1
Ply
1 4033
06/23/2020
A
B
C
8
12
2X4(D8R)
3X4
2X4(D8R)
2'5"11
5"3 9"11 9"11 5"3
0"410"2Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 60 0.00 4.98
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Additional Notes
See STD DETAILS for valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
C* 83 /- /- /39 /39 /12
Wind reactions based on MWFRS
C Brg Width = 59.7 Min Req = -
Bearing A is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 168 -194
Chords Tens. Comp.
B - C 168 -194
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - C 164 -88
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 4.50 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.006 999 360
VERT(CL): 0.011 999 240
HORZ(LL): -0.002 - -
HORZ(TL): 0.005 - -
Creep Factor: 2.0
Max TC CSI: 0.115
Max BC CSI: 0.155
Max Web CSI: 0.000
Wgt: 15.4 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
V02
Truss Type
VAL
Qty
1
Ply
1 4030
06/23/2020
A
B
C
8
12
2X4(D8R)
3X4
2X4(D8R)
4'11"11
5"3 2'0"11 2'0"11 5"3
0"41'8"2**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 60 0.00 4.98
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Additional Notes
See STD DETAILS for valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
C* 83 /- /- /39 /39 /12
Wind reactions based on MWFRS
C Brg Width = 59.7 Min Req = -
Bearing A is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 168 -194
Chords Tens. Comp.
B - C 168 -194
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - C 164 -88
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: not in 4.50 ft
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.006 999 360
VERT(CL): 0.011 999 240
HORZ(LL): -0.002 - -
HORZ(TL): 0.005 - -
Creep Factor: 2.0
Max TC CSI: 0.115
Max BC CSI: 0.155
Max Web CSI: 0.000
Wgt: 15.4 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
V02
Truss Type
VAL
Qty
1
Ply
1 4030
06/23/2020
A
B
C
8
12
2X4(D8R)
3X4
2X4(D8R)
4'11"11
5"3 2'0"11 2'0"11 5"3
0"41'8"2Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 75 0.00 7.48
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Additional Notes
See STD DETAILS for valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
C* 84 /- /- /42 /43 /13
Wind reactions based on MWFRS
C Brg Width = 89.7 Min Req = -
Bearing A is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 195 -132
Chords Tens. Comp.
B - C 195 -132
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - D 206 -120
Chords Tens. Comp.
D - C 206 -120
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 333 -343
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.008 D 999 360
VERT(CL): 0.010 D 999 240
HORZ(LL): 0.004 D - -
HORZ(TL): 0.005 D - -
Creep Factor: 2.0
Max TC CSI: 0.190
Max BC CSI: 0.169
Max Web CSI: 0.099
Wgt: 25.2 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
V03
Truss Type
VAL
Qty
1
Ply
1 4027
06/23/2020
A
B
C
D
8
12
2X4(D8R)
4X4
1.5X3
2X4(D8R)
7'5"11
5"3 3'3"11 3'3"11 5"3
3'7"2 3"8 3'7"2
0"42'6"2**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 75 0.00 7.48
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C member design.
Additional Notes
See STD DETAILS for valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
C* 84 /- /- /42 /43 /13
Wind reactions based on MWFRS
C Brg Width = 89.7 Min Req = -
Bearing A is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 195 -132
Chords Tens. Comp.
B - C 195 -132
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - D 206 -120
Chords Tens. Comp.
D - C 206 -120
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 333 -343
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Yes
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.008 D 999 360
VERT(CL): 0.010 D 999 240
HORZ(LL): 0.004 D - -
HORZ(TL): 0.005 D - -
Creep Factor: 2.0
Max TC CSI: 0.190
Max BC CSI: 0.169
Max Web CSI: 0.099
Wgt: 25.2 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
V03
Truss Type
VAL
Qty
1
Ply
1 4027
06/23/2020
A
B
C
D
8
12
2X4(D8R)
4X4
1.5X3
2X4(D8R)
7'5"11
5"3 3'3"11 3'3"11 5"3
3'7"2 3"8 3'7"2
0"42'6"2Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3
Plating Notes
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 0 1.19 1.94
TC 0 6.92 7.67
BC 106 0.00 8.87
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss designed to support 2-0-0 top chord outlookers and cladding load not to
exceed 8.00 PSF one face and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Wind
Wind loads based on MWFRS with additional C&C member design.
Additional Notes
See STD DETAILS for gable wind bracing requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
G* 156 /- /- /86 /169 /28
Wind reactions based on MWFRS
G Brg Width = 106 Min Req = -
Bearing A is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - B 47 -50
A - B 16 -126
B - C 91 -66
C - D 293 -133
Chords Tens. Comp.
D - E 296 -133
E - F 146 -147
F - E 61 -84
F - G 78 -153
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 90 -9
B - J 132 -55
J - I 191 -78
Chords Tens. Comp.
I - H 191 -78
H - F 135 -84
F - G 175 -119
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
C - J 663 -371
D - I 19 -230
Gables Tens. Comp.
H - E 722 -352
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Varies by Ld Case
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.006 F 999 360
VERT(CL): -0.006 F 999 240
HORZ(LL): -0.004 B - -
HORZ(TL): 0.004 B - -
Creep Factor: 2.0
Max TC CSI: 0.292
Max BC CSI: 0.087
Max Web CSI: 0.138
Wgt: 37.8 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
V04
Truss Type
GABL
Qty
1
Ply
1 2486
06/23/2020
A B
C
D
E
F G
HIJ
8
12
2X4(D8R)
3X6(C6)
2X4
4X4
1.5X3
3X6(C6)2X4(D8R)
8'10"6
5"3 8"11 3'6"3'6"8"11 5"3
5"3
(NNL)1'3"
5"3
(NNL)1'3"
0"42'7"8**WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form.
Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine
connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering
responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the
responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field
use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and
guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss
Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1.
Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses.
Lumber
Top chord 2x4 SP #2
Bot chord 2x4 SP #2
Webs 2x4 SP #3
Plating Notes
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 0 1.19 1.94
TC 0 6.92 7.67
BC 106 0.00 8.87
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss designed to support 2-0-0 top chord outlookers and cladding load not to
exceed 8.00 PSF one face and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Wind
Wind loads based on MWFRS with additional C&C member design.
Additional Notes
See STD DETAILS for gable wind bracing requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
G* 156 /- /- /86 /169 /28
Wind reactions based on MWFRS
G Brg Width = 106 Min Req = -
Bearing A is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - B 47 -50
A - B 16 -126
B - C 91 -66
C - D 293 -133
Chords Tens. Comp.
D - E 296 -133
E - F 146 -147
F - E 61 -84
F - G 78 -153
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 90 -9
B - J 132 -55
J - I 191 -78
Chords Tens. Comp.
I - H 191 -78
H - F 135 -84
F - G 175 -119
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
C - J 663 -371
D - I 19 -230
Gables Tens. Comp.
H - E 722 -352
Loading Criteria (psf)
TCLL: 20.00
TCDL: 10.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 40.00
NCBCLL: 10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-10
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Code:FBC 2017 RES
TPI Std: 2014
Rep Factors Used: Varies by Ld Case
FT/RT:10(0)/10(10)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.006 F 999 360
VERT(CL): -0.006 F 999 240
HORZ(LL): -0.004 B - -
HORZ(TL): 0.004 B - -
Creep Factor: 2.0
Max TC CSI: 0.292
Max BC CSI: 0.087
Max Web CSI: 0.138
Wgt: 37.8 lbs
VIEW Ver: 19.01.00A.0618.16
Job
81126
Truss
V04
Truss Type
GABL
Qty
1
Ply
1 2486
06/23/2020
A B
C
D
E
F G
HIJ
8
12
2X4(D8R)
3X6(C6)
2X4
4X4
1.5X3
3X6(C6)2X4(D8R)
8'10"6
5"3 8"11 3'6"3'6"8"11 5"3
5"3
(NNL)1'3"
5"3
(NNL)1'3"
0"42'7"8Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
JANUARY 17, 2017 TYPICAL HIP / KING JACK CONNECTION
CORNERSET GENERAL SPECIFICATIONS
Attach King Jack w/ (3) 16d Toe
Nails @ TC & 24" Strap w/ (6)
10d x 1.5" ea. end @ BC
Attach End Jack's
w/ (4) 16d Toe Nails @ TC
& (3) 16d Toe Nails @ BC
Attach Corner Jack's
w/ (2) 16d Toe Nails
@ TC & BC (Typ)
Attach Corner Jack's
w/ (2) 16d Toe Nails @ TC &
BC (Typ) 7'-0" MAX ST-CRNRST
MAX LOAD: 55 psf Roof Load, 175 mph, ASCE
7-10, Exp. B, C up to 60' Mean Roof Height
and Exposure D up to 30' Mean Roof Height.
STDTL01
BC
JUNE 20, 2019
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
STDTL03ALTERNATE GABLE END BRACING DETAILFEBRUARY 17, 2017
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
OPTION #2: APA RATED GUSSET.
OPTION #3: 2X4 VERT. SCAB.
PIGGY-BACK TRUSS. (REFER
TO ACTUAL TRUSS DESIGN
DRAWINGS FOR ADDITIONAL
INFORMATION.)
** IMPORTANT NOTE **
THIS DETAIL IS VALID ONLY FOR SINGLE PLY BASE TRUSSES
SPACED AT 24" O.C. OR LESS.
PIGGY-BACK DETAIL (TYPICAL)
180 MPH WIND, 30.00 FT MEAN ROOF HEIGHT, A.S.C.E. 7-10, PARTIALLY ENCLOSED BLDG.
LOCATED ANYWHERE AT ROOF, EXPOSURE C, WIND D.L.= 5.0 P.S.F. (MIN.), KZT= 1.00.
OR...
160 MPH WIND, 30.00 FT MEAN ROOF HEIGHT, A.S.C.E. 7-10, PARTIALLY ENCLOSED BLDG.
LOCATED ANYWHERE AT ROOF, EXPOSURE D, WIND D.L.= 5.0 P.S.F. (MIN.), KZT= 1.00.
IMPORTANT NOTE:
TOP CHORDS OF TRUSSES SUPPORTING PIGGY-BACK CAP TRUSSES MUST BE ADEQUATELY
BRACED BY SHEATHING AND/ OR PURLINS. THE BUILDING ENGINEER OF RECORD SHALL
PROVIDE DIAGONAL BRACING OR OTHER SUITABLE ANCHORAGE TO PERMANENTLY
RESTRAIN PURLINS AND LATERAL BRACING FOR OUT OF PLANE LOADS OVER GABLE ENDS.
MAXIMUM TRUSS SPACING IS NOT TO EXCEED 24" O.C.
DETAIL IS NOT APPLICABLE IF CAP SUPPORTS ADDITIONAL LOADS SUCH AS CUPOLA,
STEEPLE, CHIMNEY OR DRAG STRUT LOADS.
**REFER TO ENGINEER'S SEALED TRUSS DESIGN DRAWINGS FOR PIGGY-BACK AND BASE
TRUSS SPECIFICATIONS.**
OPTION NO. 2 - APA RATED GUSSET:
8" x 8" x 0-7/16" (MIN.) APA RATED SHEATHING GUSSETS
EACH FACE. ATTACH AT 8'-0" O.C. w/ 8 (EACH) 6d
COMMON (0.113" x 2") NAILS PER GUSSET: 4 (EACH) AT
CAP BOTTOM CHORD & 4 (EACH) AT BASE TRUSS TOP
CHORD. GUSSETS MAY BE STAGGERED AT 4'-0" O.C.
FRONT TO BACK FACES. MINIMUM TWO (2 EA.)
CONNECTIONS AT EACH TRUSS.
OPTION NO. 3 - 2X4 VERTICAL WOOD SCAB:
2X4 SPF #2, FULL CHORD DEPTH SCABS AT EACH FACE.
ATTACH AT 8'-0" O.C. w/6 (EACH) 10d BOX NAILS (0.128"
x 3") PER SCAB: 3 (EACH) AT CAP BOTTOM CHORD AND
3 (EACH) AT BASE TRUSS TOP CHORD. SCABS MAY BE
STAGGERED 4'-0" O.C. FRONT TO BACK FACES.
MINIMUM TWO (2 EA.) CONNECTIONS AT EACH TRUSS.
OPTION NO. 1 - TEE-LOK
3" x 8" TEE-LOK MULTI-USE CONNECTION PLATES SPACED
AT 4'-0" O.C. MAX. PLATES SHALL BE PRESSED INTO
PIGGY-BACK TRUSS AT 4'-0" O.C. STAGGERED FROM
EACH FACE AND NAILED TO BASE TRUSS WITH 4 EACH
6d (1.5" X 0.099") NAILS IN EACH PLATE TO ACHEIVE
MAXIMUM UPLIFT CAPACITY OF 377 LBS AT EACH 3" X 8"
TEE-LOK MULTI-USE CONNECTION PLATE (MINIMUM OF 2
PLATES).
OPTION #1: TEE-LOK MULTI-USE
CONNECTION PLATE.
ATTACH EACH PURLIN TO TOP
CHORD OF BASE TRUSS. PURLIN
& CONNECTIONS BY OTHERS.
BASE TRUSS. (REFER TO TRUSS
DESIGN DRAWINGS FOR
ADDITIONAL INFORMATION.)
PURLINS SPACED ACCORDING
TO MAX. SPACING OF TOP
CHORD OF BASE TRUSS.
SPACING IS NOT TO EXCEED 24"
O.C. & PURLINS TO BE LOCATED
AT JOINT OF EACH BASE TRUSS.
2'-0"
MAX
PIGGY-BACK TRUSS STDTL04.112/23/19
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
STDTL05TRUSSED VALLEY SET DETAIL - SHEATHED
P 12
VALLEY TRUSS
(TYPICAL)
BASE TRUSSES
SEE DETAIL "A"
BELOW (TYP.)
VALLEY TRUSS
(TYPICAL)
GABLE END, COMMON
TRUSS, OR GIRDER TRUSS
SECURE VALLEY TRUSS
W/ ONE ROW OF 10d
NAILS 6" O.C.
DETAIL A
TRUSS CRITERIA:
WIND DESIGN PER ASCE 7-98, ASCE 7-02, ASCE 7-05: 146 MPH
WIND DESIGN PER ASCE 7-10: 170 MPH
MAX MEAN ROOF HEIGHT = 30 FEET
ROOF PITCH = MINIMUM 3/12 MAXIMUM 6/12
CATERGORY II BUILDING
EXPOSURE C
WIND DURATION OF LOAD INCREASE: 1.60
MAX TOP CHORD TOTAL LOAD = 50 PSF
MAX SPACING = 24" O.C. (BASE AND VALLEY)
MINIMUM REDUCED DEAD LOAD OF 6 PSF ON THE TRUSSES.
GABLE END, COMMON
TRUSS, OR GIRDER
TRUSS
GENERAL SPECIFICATIONS:
1. NAIL SIZE = 3" X 0.131" = 10d
2. WOOD SCREW = 4.5" SDS25412 SIMPSON OR
EQUIVALENT.
3. INSTALL SHEATHING TO TOP CHORD OF BASE TRUSSES.
4. INSTALL VALLEY TRUSSES (24" O.C. MAXIMUM) AND
SECURE TO BASE TRUSSES AS PER DETAIL "A".
5. BRACE VALLEY WEBS IN ACCORDANCE WITH THE
INDIVIDUAL DESIGN DRAWINGS.
6. NAILING DONE PER NDS - 01.
7. VALLEY STUD SPACING NOT TO EXCEED 48" O.C.
JULY 17, 2017
ATTACH 2X4 CONTINUOUS #2
SYP TO THE ROOF W/ TWO
SIMPSON SDS25412 (1/4" X 4.5")
OR EQUIVALENT WOOD SCREWS
INTO EACH BASE TRUSS.
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
STDTL06TRUSSED VALLEY SET DETAIL
P 12
VALLEY TRUSS
(TYPICAL)
BASE TRUSSES
SEE DETAIL "A"
BELOW (TYP.)
VALLEY TRUSS
(TYPICAL)
GABLE END, COMMON
TRUSS, OR GIRDER
TRUSS
SECURE VALLEY TRUSS
W/ ONE ROW OF 10d
NAILS 6" O.C.
DETAIL A
(NO SHEATHING) N.T.S.
WIND DESIGN PER ASCE 7-98, ASCE 7-02, ASCE 7-05: 146 MPH
WIND DESIGN PER ASCE 7-10: 170 MPH
MAX MEAN ROOF HEIGHT = 30 FEET
ROOF PITCH = MINIMUM 3/12 MAXIMUM 6/12
CATERGORY II BUILDING
EXPOSURE C
WIND DURATION OF LOAD INCREASE: 1.60
MAX TOP CHORD TOTAL LOAD = 50 PSF
MAX SPACING = 24" O.C. (BASE AND VALLEY)
MINIMUM REDUCED DEAD LOAD OF 6 PSF ON THE TRUSSES.
GABLE END, COMMON
TRUSS, OR GIRDER
TRUSS
GENERAL SPECIFICATIONS:
1. NAIL SIZE = 3" X 0.131" = 10d
2. WOOD SCREW = 3" SDS25300 SIMPSON OR EQUIVALENT.
3. INSTALL VALLEY TRUSSES (24" O.C. MAXIMUM) AND SECURE PER DETAIL
"A".
4. BRACE VALLEY WEBS IN ACCORDANCE WITH THE INDIVIUAL DESIGN
DRAWINGS.
5. BASE TRUSS SHALL BE DESIGNED WITH A PURLIN SPACING EQUIVALENT
TO THE RAKE DIMENSION OF THE VALLEY TRUSS SPACING.
6. NAILING DONE PER NDS - 01.
7. VALLEY STUD SPACING NOT TO EXCEED 48" O.C.
FEBRUARY 5, 2018
ATTACH 2X4 CONTINUOUS #2
SYP TO THE ROOF W/ TWO
SIMPSON SDS25300 (1/4" X 3")
OR EQUIVALENT WOOD
SCREWS INTO EACH BASE
TRUSS.
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
STDTL07TRUSSED VALLEY SET DETAIL
(HIGH WIND VELOCITY)
WIND DESIGN PER ASCE 7-98, ASCE 7-02, ASCE 7-05: 146 MPH
WIND DESIGN PER ASCE 7-10: 170 MPH
MAX MEAN ROOF HEIGHT = 30 FEET
CATERGORY II BUILDING
EXPOSURE B OR C
WIND DURATION OF LOAD INCREASE: 1.60
MAX TOP CHORD TOTAL LOAD = 50 PSF
MAX SPACING = 24" O.C. (BASE AND VALLEY)
SUPPORTING TRUSSES DIRECTLY UNDER VALLEY TRUSSES MUST BE
DESIGNED WITH A MAXIMUM UNBRACED LENGTH OF 2' - 10" ON AFFECTED
TOP CHORDS.
NOTES:
1. SHEATHING APPLIED AFTER INSTALLATION OF VALLEY TRUSSES.
2. THIS DETAIL IS NOT APPLICABLE FOR SPF-S SPECIES LUMBER.
CLIP MUST BE APPLIED TO
THIS FACE WHEN PITCH
EXCEEDS 6/12 (MAXIMUM
12/12 PITCH)
CLIP MAY BE APPLIED
TO THIS FACE UP TO A
MAXIMUM 6/12 PITCH
FOR BEVELED BOTTOM
CHORD, CLIP MAY BE APPLIED
TO EITHER FACE.
NOTE: VALLEY STUD SPACING NOT TO
EXCEED 48" O.C. SPACING.
ATTACH VALLEY TRUSSES TO LOWER TRUSSES
WITH USP RT7 OR EQUIVALENT.
NON-BEVELED
BOTTOM CHORD
NON-BEVELED
BOTTOM CHORD
JULY 17, 2017
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
MAXIMUM STUD LENGTH
2X4 SP #3 / STUD 12" O.C.
16" O.C.
24" O.C.
2X4 SP #3 / STUD
2X4 SP #3 / STUD
2X4 SP #2 12" O.C.
16" O.C.
24" O.C.
2X4 SP #2
2X4 SP #2
3-8-10
3-3-10
2-8-6
5-6-11
4-9-12
3-11-3
6-6-11
6-6-11
5-4-12
11-1-13
9-10-15
8-1-2
3-10-15 5-6-11 6-6-11 11-8-14
10-8-0
9-3-13
6-6-11
6-2-9
4-9-12
3-11-3
3-6-11
3-1-4
3X4 =
12
A
A
* *
*
MAX MEAN ROOF HEIGHT = 30 FEET
EXPOSURE B OR C
ASCE 7-10 190 MPH
DURATION OF LOAD INCREASE : 1.60
STDTL08STANDARD GABLE END DETAIL
B B
+
+
+
+
**
STUD DESIGN IS BASED ON COMPONENTS AND CLADDING.
CONNECTION OF BRACING IS BASED ON MWFRS.
FEBRUARY 17, 2017
**
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
STDTL09FEBRUARY 17, 2017
T-BRACE / I-BRACE DETAIL
WITH 2X BRACE ONLY
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
STDTL10FEBRUARY 17, 2017 LATERAL BRACING RECOMMENDATIONS
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
45.00°45.00°45.00°
STDTL11FEBRUARY 17, 2017 LATERAL TOE-NAIL DETAIL
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
L
STDTL12FEBRUARY 17, 2017 UPLIFT TOE-NAIL DETAIL
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
FEBRUARY 5, 2016 ST-2x2 NAILINGTYP 2x2 NAILER ATTACHMENT
A-1 ROOF TRUSSES
4451 ST. LUCIE BLVD.
FORT PIERCE, FL 34946
772-409-1010
2x2 NAILER ATTACHMENT
GENERAL SPECIFICATIONS
MAX LOAD: 55 psf Roof Load, 170 mph, ASCE
7-10, 29'-0" Mean Height, Exp. B, C or D.
1.5 x 4
1.5 x 4
2 x 4 SP No . 2 (M in )2x4 SP No. 2 (Min)
2x2 SP No. 3
STDTL13
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
April 11, 2016 ST-FLAT GIR BRACETYPICAL ALTERNATE BRACING DETAIL
FO EXTERIOR FLAT GIRDER TRUSS
A-1 ROOF TRUSSES
4451 ST. LUCIE BLVD.
FORT PIERCE, FL 34946
772-409-1010
(4) 12d
MAX 30" (2'-6")
2x6 #2 SP (Both Faces)
24" o.c.
SIMPSON H5
(4) 12d
TRUSS 24" o.c.
UPLIFT CONNECTION
(SEE ROOF TRUSS)
EXTERIOR FLAT
GIRDER
VARIES
12
STDTL14
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
STDTL15FEBRUARY 17, 2017 STANDARD REPAIR DETAIL FOR BROKEN CHORDS, WEBS, AND
DAMAGED OR MISSING CHORD SPLICE PLATES
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771
STDTL16FEBRUARY 17, 2017 SCAB APPLIED OVERHANGS
(L)
24" MAX
(2.0 x L)
24" MIN
Manuel Martinez, P.E.
# 0471824620 ParkView DrSt Cloud, FL 34771