Loading...
HomeMy WebLinkAboutTIE DOWNS, A4 (003)-2Wide Tie DownsFBC 6th EDITION (20171 COMPLIANCE STATEMENT. 1. - SEE ANCHOR SCHEDULE 2. II 3. C 4. SSURE COEFR° ;0.18 ANCHOR & STRAPPING SCHEDULE 60 BOX 130 MPH STRAPS PER SIDE 60' BOX 140 MPH7 STRAPS PER SIDE 60' BOX 150 MH 8 STRAPS PER SIDE 60' BOX 160 MH 9 STRAPS PER SIDE 0 BOX 170 MPH 10 STRAPS PER SIDE 60' BOX 180 MPH 111 STRAPS PER SIDE (HVHZ) GROUND ANCHOR NOTE GENERAL NOTE STABILIZER PLATES ARE NOT REWIRED WITH INSTALLATION. HOWEVER, ANY UNSTABLE SOIL CONDITIONS THAT MAY IMPACT THE GROUND ANCHORS ABILITY TO RESIST UPLIFT MUST BE BROUGHT TO THE ATTENTION OF THE ENGINEER. GROUND ANCHORS ARE REWIRED TO BE INSTALLED PER THE MANUFACTURER'S INSTRUCTIONS SYMBOLS TF.T FRAME TIE -DOWN FASTENED TO GROUND ANCHOR FOUNDATION DIMENSIONS A. MODULE WIDTH B. PIER TO MODULE EDGE C. STEEL BEAM SPACING 11' - 8' N/A VARIES D. MAX. PIER SPACING MINIMUM SOIL BEARING CAPACITY F_g--,. 20DO PSF cFi - - . T. -1 - - - - - F - - - - - - - - - . T. - - - - - - . T. F_�F_ - - - 1 i.T- - - . - - - - - - - - - - - - - - . T. - - - - - - - - - --------_T. . T. . T. . T L J L J L J L J L J L J L J L J L J L-I z < I a 4z'-a' I LL w w 12.6 L J F--1 L J L J L J L 7 F 11 J 6 L J L-1 L J L J L J L J L J L J L J µ .T.-----------------� ��F.L----------------------------------- �.L---------FT,- -UU � L -1 L LL Al I jF.T. I.T. I.T. AV. j.T. t-T. K.T. 'I.T. I.T. I L------- --------------------------------------------------------------------j HM- LESSEE/END USER IS RESPONSIBLE FOR LOCATING ROIL IF SITE GONDIHONS/BUILDING CONSTRUCTION DICTATE ALL UNDERGROUND UTILITIES AND OBSTRUCTIONS. ANY STATE OF FLORIDA APPROVED TIE -DOWN METHOD MAY BE USED IN LIEU OF THE DETAIL SHOWN. R4IE- LED USER IS RESPONSIBLE FOR CONDUCTING SSEE A 'PULL IF REWIRED FOR PERMITTING. RQIE. CONTRACTOR TO FIELD VERIFY ALL COLUMN LOCATIONS TO INSURE CORRECT PLACEMENT OF SUPPORT PIERS dOP 8SHIMS TICINAL CAP BLDCK 16'x18'x7/8' ABS Px8'x16' BLOCK v I NOTE, MAXIMUM OF (2) LAYERS OF WOOD MAY BE USED. A PIER "A" SCALE: 114" = V c a� TYPICAL GROUND ANCHOR DETAIL SCALE: -NTS- EM E3 16'x18'x3/4' ABS PAD (MINUTE MAN PRODUCT OR AN APPROVED EQUAL) SIDE WALL PERIMETER RAIL FOUNDATION PLAN SCALE: 1/4" = P-W P.T. 2x8 SHIMS 2 - 4'x8'x16' CAP BLOCK (3) 16'X18' ABS PAD •� 2 - B'xB'x16' BLOCK NOTE, MAXIMUM OF (2) LAYERS 2'-8' OF WOOD MAY BE USED. FRAME TIE -DOWN STRAP TO WRAP AROUND I -BEAM IMSi�iM731 -. v v I I 1-0 3' 3 6' 3 ABS P DS ST CKED F BLOCK ( ) 1 x18 x /4 A A B PIER "B" MUST BE AS TCH APERPINDICU ART O TDDITIONAL COUE OE PREVIOUS (MINUTE MAN PRODUCT OR AN APPROVED SCALE: 3/4"=1'-0" COURSE. EQUAL) FRAME I -BEAM FRAME OUTRIGGER BEYOND � CROSS MEMBER BEYOND 19 El TIE -DOWN STRAP PIER TYPE A (TYP) EXISTING GRADE � <e .•�' TYP. GROUND ANCHOR L (TYP.) e SECTION TIE DOWN, SIDEWAL SCALE: 3/4" = 1'-0" SIDE WALL PERIMETER RAIL FRAME I -BEAM PIER TYPE B�(TYP) z TTIYEPIDOWLN STRAP EXISTING GRADE NOTE CRIMP STRAP WITH I z A LISTED STRAP CRIMP OR J-HOOK WRAPPED AROUND I -BEAM v TYP. GROUND ANCHOR eSECTION TIE DOWN, MATELINE (TYP.) SCALE: 114" - V-0" Z FOUNDATION NOTES: Q MATERIAL SPECIFICATIONS: N SOIL & SITE PREPARATION: 1. FOUNDATION DESIGN IS BASED ON AN ALLOWABLE SOIL BEARING PRESSURE OF O 2000 PSF. ANY SOIL CONDITIONS THAT MAY DIFFER FROM THIS MUST BE BROUGHT TO THE ATTENTION OF THE ARCHITECT, U 2. FOUNDATIONS SHALL BE BUILT ON UNDISTURBED SOIL OR PROPERLY COMPACT FILL MATERIAL. COMPACTED SOILS SHALL BE TESTED TO A MINIMUM OF 95 N PROCTOR IN ACCORDANCE WITH ASTM D 1557. 3. EXCAVATIONS FOR FOUNDATIONS SHALL BE BACKFILLED WITH SOIL WHICH IS FREE OF ORGANIC MATERIAL, CONSTRUCTION DEBRIS, AND LARGE ROCKS. 4. LESSEE/END USER IS RESPONSIBLE FOR INSURING THAT SITE/SOIL CONDITIONS MEET OR EXCEED THE REQUIREMENTS SHOWN. BASEPAD: Q o mU I. PIER FOOTING TYPE "A" SHALL BE 16"X18" ABS PAD OR 16"X16"X4", 250O PSI V ' $ CONCRETE PAD. PIER FOOTING TYPE "B" SHALL BE (3)16"XI8" ABS PADS STACKED. , 2. CONCRETE IN FOOTINGS SHALL HAVE A SPECIFIED COMPRESSIVE STRENGTH OF NO Z m LESS THAN 2500 PSI AT 28 DAYS. a _ LLQ MASONRY UNIT: (n @) 1. PIERS SHALL BE CONSTRUCTED WITH NOMINAL 8"X16"X4" CONCRETE MASONRY W z UNITS CONFORMING TO ASTM C-90. Q 5 WOOD & SHIM MATERIAL: 3 D 1. ALL WOOD BLOCKING AND SHIMS SHALL BE CEDAR OR PRESSURE TREATED. Z o 0 GROUND ANCHORS: J N I. GROUND ANCHORS SHALL HAVE 4725# MIN. ULTIMATE CAPACITY & SHALL BE a INSTALLED IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS. D rn TIE -DOWN STRAPS: Q a� 1. THE TIE -DOWN STRAPS SHALL BE 14' X 0.35" GALVANIZED STEEL QQS-781-H TYPE I J o 0 FINISH-B, GRADE-1. TIE -DOWN STRAPS AND CONNECTING HARDWARE SHALL HAVE 4725# MIN. ULTIMATE CAPACITY. 0 z O N W M INSTALLATION SPECIFICATIONS: �3 SOIL & SITE PREPARATION: 1. WHERE WATER IMPACTS THE GROUND FROM A ROOF VALLEY, DOWN SPOUT, OU SCUPPER, OR OTHER RAINWATER COLLECTION OR DIVERSION DEVICE, PROVISIONS a SHALL BE MADE TO PREVENT SOIL EROSION AND DIRECT THE WATER AWAY FROM THE FOUNDATION. 1--� I--� 2. FINISH GRADE SHALL BE SLOPED AWAY FROM THE FOUNDATION FOR DRAINAGE. ^ q THE AREA UNDER FOOTINGS, FOUNDATIONS, AND CONCRETE SLABS ON GRADE SHALL HAVE NO VEGETATION, STUMPS, ROOTS, AND FOREIGN MATERIAL I —I UD Q z REMOVED PRIOR TO THEIR CONSTRUCTION. FILL MATERIAL SHALL BE FREE OF VEGETATION AND FOREIGN MATERIAL, P. MASONRY UNIT: I. LONG DIMENSION OF ALL PIERS MAY BE INSTALLED PERPENDICULAR OR PARALLEL TO THE FRAME, MAXIMUM OF (4) COURSES, (32" HIGH) UNLESS OTHERWISE NOTED. 2. CONCRETE MASONRY UNITS SHALL CONFORM TO THE ASTM C 90 STANDARDS. 3. CONSTRUCTION OF DRY -STACKED, SURFACE BONDED MASONRY WALLS WHEN SPECIFIED, INCLUDING STACKING AND LEVELING OF ALL UNITS, MIXING AND THE APPLICATION OF MORTAR, CURING AND PROTECTION SHALL COMPLY WITH ASTM O C 946, IL TIE -DOWN STRAPS: W 1. THE FIRST TIE -DOWN STRAP FROM THE ENDWALL SHALL NOT EXCEED T-6", UNLESS �/ 11) OTHERWISE SHOWN. ,^ 2. REFER TO ANCHOR & STRAPPING SCHEDULE FOR MINIMUM NUMBER OF GROUND V ANCHORS. � O U 0 Illunuiiii F . o °FIB �o'°,, Julio Orbegoso U) Q0 X N.. 38769 2020.06.15 U) N � 15:56:28 E �-- Q. • STATE OF ((/� 04 00 FCORIDP..aG\�� 1 1 - Q TONAL E,,�• �lunn111� THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY JULIO 0 ORBEGOSO, P.E. ON THE DATE AND/OR TIME STAMP SHOWN USING A DIGITAL SIGNATURE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURES MUST BE O VERIFIED ON ANY ELECTRONIC COPIES. NSULTING ENGINEER JULIO ORBEGOSO 202 DORIS DRAKELAND, E FL 33813 PE LICENSE #38769 REVISION DATE: DATE: 06-15-2020 DRAWN: R.L.G. " NOTICE " THESE DOCUMENTS WILL NO LONGER BE JOB #: 17764AB VALID 21 DAYS AFTER THE DATE SIGNEDC) VALID THRU : JULY 6TH, 2020 SHEET NO. A4