Loading...
HomeMy WebLinkAboutDuct Leak testDate,- 2 Contractor- Planning & Development Services Building & bode Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 772-462-2165 Fax 772-462-6"3 FBC ENERGY CONSERVATION CODE Duct Seating Certification Prescriptive and Performance Method Permit #.- C"Isftaon.- V, Posi Cwwruction Tess Test Conditions: Date: Ti'me: indoor Temperature (F).- Outdoor Temperature (F): i orai Leaxage test,(uutsvpj duct Leakap: c Default Test Pressure.-. 2-1T Baseline duct Pressure (optional) Testinq Comoan Company Name,- 4 oft thereby certify that the above Duct Sealing Section R403.2.2. it i AIF WOO-1. L l n Prop. Leak Free a .-W n Rough -in Test Floor Area (ft2): Primary Location of SuPOY Ductwork Primary Locat'ton of Return Ductwork Proposed On 0 t all kale Wm),- TDtal Leakage per 100 t CFM25 x 100 divided by the CFA = Duct Leakage C Addrew95-►� R0imr,�V„a Ia S+, µ!►e Leakage results demonstrate compliance wish 5th Edition FBC Energy Conservaton requirements in accordance S*ature..0 Printed me: Ljrense/CertffiCat,- #: Date, ��29f2020 Planing & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm .201 Fort Pierce, FL 34982 2-462-216.5 fax 772-462-W3 F8C ENERGY CONSERVATION CODE Duct Sealing Cerflfication Prescriptive and Performance Method Permit #.bP k Lot#: Contractor: ft-Wad o IULX DA Address: "1�.Ci1 Air_mmrAip_ F�,-} arx o- o fib„ Q�i'4Si Ctv�s3rw�on: +� Post consvucfim Tat r) Rough -in Tess Test Conditions.9 . Date: Indoor Temperature (F). Outdoor Temperature IF) tem.�Im e Test (Outside' Duct Leakap: c Defauft Test Prewure: 25-- .-A . (P-a Baseline Duct Pressure (opgonal) Duct dress. (Pa) Testina Company COmPany Name; ; Flow Ring installed d ❑ Prop. leak Free E pa fan Press 40 a 1z Pa) Floor Area fft2): ti Ptimary Location of Supp�y Ductwork Primary Location of Return Ductwork Flow (ch) '/Propased On Resins: M bass o Fail Total leakage (cfm): Total Leakage per 100 sqf� Aq:6 a* Ono 24 CFM25 x 100 divided by the CFA = Duct leakage CFM1100 sgft. I & V - - Ot% % &A 1-U A - - % &6 Ile FL -o2 2*2f � heTetYfify that the alow Duct Sealing Leakage resufts demonstrate compliance with V1 Editon FBC Energy Con Section R4012,2, it i Nntm ?f6e: l.icenselCetiificate #,m serration requirementsm accorc