HomeMy WebLinkAboutDuct Leak testDate,- 2
Contractor-
Planning & Development Services
Building & bode Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6"3
FBC ENERGY CONSERVATION CODE
Duct Seating Certification
Prescriptive and Performance Method
Permit #.-
C"Isftaon.- V, Posi Cwwruction Tess
Test Conditions:
Date:
Ti'me:
indoor Temperature (F).-
Outdoor Temperature (F):
i orai Leaxage test,(uutsvpj
duct Leakap: c Default
Test Pressure.-. 2-1T
Baseline duct Pressure (optional)
Testinq Comoan
Company Name,- 4
oft
thereby certify that the above Duct Sealing
Section R403.2.2. it i
AIF
WOO-1. L
l
n Prop. Leak Free
a
.-W
n Rough -in Test
Floor Area (ft2):
Primary Location of SuPOY Ductwork
Primary Locat'ton of Return Ductwork
Proposed On
0 t all
kale Wm),-
TDtal Leakage per 100
t
CFM25 x 100 divided by the CFA = Duct Leakage C
Addrew95-►� R0imr,�V„a Ia S+, µ!►e
Leakage results demonstrate compliance wish 5th Edition FBC Energy Conservaton requirements in accordance
S*ature..0
Printed me: Ljrense/CertffiCat,-
#:
Date, ��29f2020
Planing & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm .201
Fort Pierce, FL 34982
2-462-216.5 fax 772-462-W3
F8C ENERGY CONSERVATION CODE
Duct Sealing Cerflfication
Prescriptive and Performance Method
Permit #.bP
k
Lot#:
Contractor: ft-Wad o IULX DA Address: "1�.Ci1 Air_mmrAip_ F�,-} arx
o- o fib„ Q�i'4Si
Ctv�s3rw�on: +� Post consvucfim Tat r) Rough -in Tess
Test Conditions.9
.
Date:
Indoor Temperature (F).
Outdoor Temperature IF)
tem.�Im
e Test (Outside'
Duct Leakap: c Defauft
Test Prewure: 25-- .-A . (P-a
Baseline Duct Pressure (opgonal)
Duct dress. (Pa)
Testina Company
COmPany Name; ;
Flow Ring
installed
d
❑ Prop. leak Free
E pa
fan Press
40 a 1z
Pa)
Floor Area fft2):
ti
Ptimary Location of Supp�y Ductwork
Primary Location of Return Ductwork
Flow (ch)
'/Propased On
Resins: M bass o Fail
Total leakage (cfm):
Total Leakage per 100 sqf�
Aq:6 a*
Ono 24
CFM25 x 100 divided by the CFA = Duct leakage CFM1100 sgft.
I & V - -
Ot% % &A 1-U A - -
% &6 Ile FL -o2 2*2f
� heTetYfify that the alow Duct Sealing Leakage resufts demonstrate compliance with V1 Editon FBC Energy Con
Section R4012,2, it i
Nntm ?f6e:
l.icenselCetiificate #,m
serration requirementsm accorc