Loading...
HomeMy WebLinkAboutProposal11, ur X(;1 -ewck I AmeriGas is pleased to offer the following proposal for your consideration: Luna residence Customer Name 1233 s brocksmith rd Street Fort Pierce City, State, Zip Code Brian Pead Sales Representative Ft. Pierce District Location 772-633-0740 Telephone Description of work Bury 250 gallon tank left side of pool run line to generator, pool heater, BBQ and house stub. Run Inside gas lines to stove and water heater. Bonding of gas lines is homeowners responsibility. Quantifv Descd tion Unit Cost Total 200 Propane 2.1691 $433.80 1 250 gallon tank leased per year 134 $134.00 1 JBury and anchor tank with anode 985 $985.00 8 Shut Off 25 $200.00 5 Transitions 65 $325.00 4 Regulators 70 $280.00 5 Gas hook up 125 $625.00 130 3/4 Ext gas line (will bill actual when we install based on final generator / PH locatioi 8 $1,040.00 98 314 inch INT gas line 12 $1,176.00 2 Tee 135 $270.00 1 Rinnai RUR1601P with up to 20 ft vent with roof termination 2589 $2,589.00 1 Cell monitor (option) 250 $250.00 1 1 at year cell tower access 72 $72.00 TAX 7.00% $556.22 Permit $250.00 All ndrre are exclusive of anv aoolicable taxes. olumbino and electrical work. ITOTAL COST $9,186.02 All prices are based on a standard installation. Unforeseen circumstances such as poor soil condition, premature installation of concrete, landscaping, sheetrock etc may result in increased costs. Change orders must be approved prior to installation and are subject to approval by the authority having jurisdiction. AmerlGas will not be responsible for damage to unmarked lines (sprinkler, water, electric etc.) . ALL WORK SHALL BE PERFORMED ACCORDING TO FEDERAL, STATE AND LOCAL REQUIREMENTS. Attachments: Accepted by: Date Submitted by: This proposal is valid for 30 days from the date submitted. Brian Pearl Date 11/14/2019