HomeMy WebLinkAboutTDH CalculatorPEIs"Ti�IR
STEP 1
POOL SPECIFICATIONS
TDH CALCULATOR
STEP 2
SELECT EQUIPMENT _
Q/4,,a' 12�4
STEP 3 OF 3: TDH CALCULATION DEC 10 2019
Pool Specifications
ST. Lucie County, Permitting
Pool Volume(gallons(: 8707.00 gallons Suction Lft 1.50It
Turn Dyer (hours): 6.00 hours
Fittratian Flow Rate: 36.00'GPM { t Maximum Flow Rate _ 95.42 GPM
Selected Components
SELECTION QUANTITY
j ICHLOR 30 1
If 2"%2.5"3WAY VALYE
MAIN DRAIN
111 �91IRIn11
CLEAN AND CLEAR PLUS
SELECTION / MODEL
SUPERMAXVS
Results: Your TDH Calculation
Flow Rate 95.42 GAL/M I N
Head Loss 27.25 FT
REQUIRED MINIMUM PIPE SIZE
Inlet Piping: 2.50
PUMP RPM
PA
1
MAXIMUM PIPE VELOCITY( FT/SECI
(CONSULT YOUR LOCAL CCCEI
^TOTAL PIPING LENGTHS (FT)
SUCTION OUTLET 8
DISCHARGE 8
INLET 20.00
DISCHARGE 20.00
_`--/': ..� Y�
QUANTITY
�SELECTION
45 DEGREE ELBOW`
INLET`— 3
DISCHARGE 3
- 90 DEGREE ELBOW
INLET 3
DISCHARGE 3
TEEBRANCH
INLET 1
DISCHARGE 0
Max Flow Rate at Max RPM, 95.42 GAL/MIN
Head Loss at Max Flow Rate at Max 27.25 FT
RPM:
Discharge Piping: ^^_2.50
-Flaw Rate at Suit
cted Pump RPM: 95.42 Pump RPM: 3459 J
-.r°dezd 40is at Sel
cted Pump RPM: 27.25
SYSTEM HEAD PRESSURE CURVE
BY PUMP SELECTION
so
70
x
m
60
n
T
a
2
U 60
o
40
0
O
v 30
d
a
N
S
�I
20
e
0
S
i
10
0
0
10 20 30 40 50 60 70 80 90 100
Volumetric Flow Rate (GPM)
—Clean
System Curve —Pump Curve ■ Desired Operation Point - Clean System a Pump Operation Point