HomeMy WebLinkAboutDuct Leakage TestPlanning & Development Services
Building 8 Cbde Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772462-2165 Fax 772-462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Perfo ance Method
Date:
Lot #:
f
Contractor. Qj 0,j,tx,,ry\1 -_ --_ Address: M..LMM^ r ALr Fort Piecce. El '14451-
CarrsFntetion: v6 Post Constwficn Test ❑ Rough -in Test
Test Conditions:
Date:
Time:
Indoor Temperature (F);,-D
Outdoor Temperature IF):
Total Leakage Test 10utsl
�24(�.020
Duct Leakage: e Default e Prop. Leak Free
Test Pressure: 2Kj (Pa)
Baseline Duct Pressure (optional) (Pa)
-W
Floor Area Jft7.)..
Primary Location of Supply Ductwork
Primary Location of Return Ductwork
Duct Press. (Pa) Flow Ring Fan Press Flow (ch)
Installed (Pa
�:l'1 8
Tesfing Gompgny
Company Name:
Address:
VPrDposed On _
Results: 16 bass c Fail
Tctal Leakage (ch):
Total Leakage per 100 sgft:
CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sgft.
S twfaby oarffy ftt the above Dud SeaMig Leakageresultsiemmbate c4mplsastce wv'M 5"� Eds6on FCC energy Conservabon requirements in accardanc�
Secfion R40322, �v
1W
UcensaCergcate #: F-w R4sFRA�_