Loading...
HomeMy WebLinkAboutBlower Door Test 2Envelope Leakage Test Report (Blower Door Test) Residential Prescriptive, Performance or ERI Method Compliance 2017 Florida Building Code, Energy Conservation, 6th Edition Jurisdiction: Permit #: Job,informatlon ' Builder: Synery Homes, LLC Community: Lot: NA Address: 6104 Yucca Drive City: Fort Pierce State: FL Zip: 34982 'Air Leakage Test Results Passing results must meet either the Performance, Prescriptive; or ERI Method O PRESCRIPTIVE.METHOD-The'building or dwelling unit shall be tested, and verified as'having'an air leakage rate of not exceeding 7 air changes per. hour ate pressure: of 0.2 inch w.g. (56 Pascals) in Climate Zones 1 and 2 ..,r Q• P.ERPORMANCE or ERI METHOD -The building or dwelling unit shall be tested and--yerifled ashaving an air leakage rate of not exceeding ' the selected ACH(50) value, as shown on Form R405 2017 (P,er{ormance or;R406 2017{ERI) sectxonIabeled as infiltration, sub-section,ACH50. ACH(50) specified on,Form R405 2017 Energy Cal (Pertorniance) or R406-2017 (ERI)i 5.000 x 60 _ 11601 = Method for calculating building volume: CFM(50) Building Volume ACH(50) 0 Retrieved from architectural plans ❑ PASS 0 Code software calculated When ACH(50) is less than 3, Mechanical Ventilation installation 0 Field measured and calculated must be verified by building department. R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNMCC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals) Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues.or individuals licensed as set forth in Section 489.105(3)(0, (g), or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to thecods oHiciaL Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures. 2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed; but not sealed beyond intended infiltration control measures. 3. Interior doors, if installed at the time of the test, shall be open. 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of the test, shall be turned off. 6. Supply and return registers, if installed at the time of the test, shall be fully open. Testing Company Company Name: Phone: I hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code Energy Conservation requirements according to the compliance method selected above. Signature of Tester: Date of Test: Printed Name of Tester: License/Certification #: Issuing Authority: 11 if 2t201912:55:19 PM EnergyGauge® USA 6.0.03 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1