Loading...
HomeMy WebLinkAboutMANJCalculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2020-Apr-23 16:54:00 Right-Suite® Universal 2019 19.0.08 RSU08101 Page 1 ...ightsoft HVAC\WILLIAMS RESIDENCE- PACE 2000.rup Calc = MJ8 Front Door faces: S Job:Project Summary Apr 23, 2020Date:Entire House By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM Project Information GARRY WILLIAMS, PACE 2000, INC.For: FORT PIERCE, FL Notes: Design Information Fort Pierce, FL, USWeather: Winter Design Conditions Summer Design Conditions Outside db °F42 Outside db °F90 Inside db °F70 Inside db °F75 Design TD °F28 Design TD °F15 Daily range M Relative humidity %50 Moisture difference gr/lb61 Heating Summary Sensible Cooling Equipment Load Sizing Structure Btuh26961 Struc ture Btuh21075 Ducts Btuh5993 Ducts Btuh5058 Central vent (0 cfm)Btuh0 Central vent (0 cfm)Btuh0 (none)(none) Humidification Btuh0 Blower Btuh0 Piping Btuh0 Equipment load Btuh32954 Use manufacturer's data n Rate/swing multiplier 0.95 Infiltration Equipment sensible load Btuh24826 Method Latent Cooling Equipment Load SizingSimplified Construction quality Average 0Fireplaces Structure Btuh3816 Ducts Btuh2312 Central vent (0 cfm)Btuh0 CoolingHeating (none) 19991999Area (ft²)Equipment latent load Btuh6128 2022520225Volume (ft³) Air changes/hour 0.200.38 Equipment Total Load (Sen+Lat)Btuh30954 Equiv. AVF (cfm)67128 Req. total capacity at 0.70 SHR ton3.0 Heating Equipment Summary Cooling Equipment Summary Make Make Trane Trade Trade TRANE Model Cond 4TTR6036J1 AHRI ref Coil TEM4A0C37S31++TDR AHRI ref 201763705 Efficiency 100 EFF Efficiency 13.0 EER, 16 SEER Heating input kW9.2 Sensible cooling Btuh24640 Heating output Btuh31304 Latent cooling Btuh10560 Temperature rise °F24 Total cooling Btuh35200 Actual air flow cfm1173 Actual air flow cfm1173 Air flow factor cfm/Btuh0.036 Air flow factor cfm/Btuh0.045 Static pressure in H2O1.00 Static pressure in H2O1.00 Space thermostat Load sensible heat ratio 0.81 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2020-Apr-23 16:54:00 Right-Suite® Universal 2019 19.0.08 RSU08101 Page 1 ...ightsoft HVAC\WILLIAMS RESIDENCE- PACE 2000.rup Calc = MJ8 Front Door faces: S Job:Right-J® Worksheet Apr 23, 2020Date:Entire House By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name Entire House M TOILET 2 Exposed wall 175.0 ft 11.0 ft 3 Room height 10.1 ft 10.0 heat/coolft 4 Room dimensions ft5.0x6.0 5 Room area 1999.0 ft²30.0 ft² Ty Construction U-value Or HTM Area (ft²)Load Area (ft²)Load number (Btuh/ft²-°F)(Btuh/ft²-°F)(Btuh/ft²)(Btuh/ft²)or perimeter (ft)(Btuh)or perimeter (ft)(Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 WW 13A-4ocs13A-4ocs 0.1430.143 nn 4.004.00 2.192.19 490 349 1395 762 60 52 208 114 .GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 nn 15.6815.68 13.2213.22 142 0 2219 1871 8 0 125 106 .WW 13A-4ocs13A-4ocs 0.1430.143 ee 4.004.00 2.192.19 210 186 745 407 0 0 0 0 .GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ee 15.6815.68 30.5030.50 24 0 376 732 0 0 0 0 11 WW 13A-4ocs13A-4ocs 0.1430.143 ss 4.004.00 2.192.19 713 365 1463 799 0 0 0 0 GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ss 15.6815.68 14.1714.17 348 0 5457 4932 0 0 0 0 WW 13A-4ocs13A-4ocs 0.1430.143 ww 4.004.00 2.192.19 350 338 1353 740 50 50 200 109 GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ww 15.6815.68 30.5030.50 12 0 188 366 0 0 0 0 CC 16X19-0zd16X19-0zd 0.4080.408 --1.591.59 1.371.37 1999 1999 3169 2735 30 30 48 41 FF 22A-tph22A-tph 1.3581.358 --38.0238.02 0.000.00 1999 175 6654 0 30 11 418 0 6 c) AED excursion 419 -10 Envelope loss/gain 23020 13763 1000 360 12 a) Infiltration 3942 1111 246 69 b) Room ventilation 0 0 0 0 13 Internal gains:Occupants @ 230230 0 0 0 0 Appliances/other 6200 125 Subtotal (lines 6 to 13)26961 21075 1246 555 Less external loadLess external load 0 0 0 0 Less transferLess transfer 0 0 0 0 RedistributionRedistribution 0 0 0 0 14 Subtotal 26961 21075 1246 555 15 Duct loads 22%24%5993 5058 22%24%277 133 Total room load 32954 26133 1522 688 Air required (cfm)Air required (cfm)1173 1173 54 31 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2020-Apr-23 16:54:00 Right-Suite® Universal 2019 19.0.08 RSU08101 Page 2 ...ightsoft HVAC\WILLIAMS RESIDENCE- PACE 2000.rup Calc = MJ8 Front Door faces: S Job:Right-J® Worksheet Apr 23, 2020Date:Entire House By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name M BATH M WIC 2 Exposed wall 13.0 ft 7.0 ft 3 Room height 10.0 heat/coolft 10.0 heat/coolft 4 Room dimensions ft110.0x1.0 ft7.0x10.0 5 Room area 110.0 ft²70.0 ft² Ty Construction U-value Or HTM Area (ft²)Load Area (ft²)Load number (Btuh/ft²-°F)(Btuh/ft²-°F)(Btuh/ft²)(Btuh/ft²)or perimeter (ft)(Btuh)or perimeter (ft)(Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 WW 13A-4ocs13A-4ocs 0.1430.143 nn 4.004.00 2.192.19 80 72 288 157 0 0 0 0 .GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 nn 15.6815.68 13.2213.22 8 0 128 108 0 0 0 0 .WW 13A-4ocs13A-4ocs 0.1430.143 ee 4.004.00 2.192.19 0 0 0 0 0 0 0 0 .GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ee 15.6815.68 30.5030.50 0 0 0 0 0 0 0 0 11 WW 13A-4ocs13A-4ocs 0.1430.143 ss 4.004.00 2.192.19 0 0 0 0 0 0 0 0 GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ss 15.6815.68 14.1714.17 0 0 0 0 0 0 0 0 WW 13A-4ocs13A-4ocs 0.1430.143 ww 4.004.00 2.192.19 50 50 200 109 70 70 280 153 GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ww 15.6815.68 30.5030.50 0 0 0 0 0 0 0 0 CC 16X19-0zd16X19-0zd 0.4080.408 --1.591.59 1.371.37 110 110 174 150 70 70 111 96 FF 22A-tph22A-tph 1.3581.358 --38.0238.02 0.000.00 110 13 494 0 70 7 266 0 6 c) AED excursion -13 -7 Envelope loss/gain 1285 512 657 242 12 a) Infiltration 291 82 156 44 b) Room ventilation 0 0 0 0 13 Internal gains:Occupants @ 230230 0 0 0 0 Appliances/other 150 125 Subtotal (lines 6 to 13)1575 744 814 411 Less external loadLess external load 0 0 0 0 Less transferLess transfer 0 0 0 0 RedistributionRedistribution 0 0 0 0 14 Subtotal 1575 744 814 411 15 Duct loads 22%24%350 179 22%24%181 99 Total room load 1925 923 995 509 Air required (cfm)Air required (cfm)69 41 35 23 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2020-Apr-23 16:54:00 Right-Suite® Universal 2019 19.0.08 RSU08101 Page 3 ...ightsoft HVAC\WILLIAMS RESIDENCE- PACE 2000.rup Calc = MJ8 Front Door faces: S Job:Right-J® Worksheet Apr 23, 2020Date:Entire House By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name MASTER BEDROOM FOYER 2 Exposed wall 33.0 ft 7.0 ft 3 Room height 10.0 heat/coolft 10.0 heat/coolft 4 Room dimensions ft295.0x1.0 ft15.0x7.0 5 Room area 295.0 ft²105.0 ft² Ty Construction U-value Or HTM Area (ft²)Load Area (ft²)Load number (Btuh/ft²-°F)(Btuh/ft²-°F)(Btuh/ft²)(Btuh/ft²)or perimeter (ft)(Btuh)or perimeter (ft)(Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 WW 13A-4ocs13A-4ocs 0.1430.143 nn 4.004.00 2.192.19 0 0 0 0 0 0 0 0 .GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 nn 15.6815.68 13.2213.22 0 0 0 0 0 0 0 0 .WW 13A-4ocs13A-4ocs 0.1430.143 ee 4.004.00 2.192.19 0 0 0 0 0 0 0 0 .GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ee 15.6815.68 30.5030.50 0 0 0 0 0 0 0 0 11 WW 13A-4ocs13A-4ocs 0.1430.143 ss 4.004.00 2.192.19 180 90 360 197 70 22 88 48 GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ss 15.6815.68 14.1714.17 90 0 1411 1276 48 0 753 680 WW 13A-4ocs13A-4ocs 0.1430.143 ww 4.004.00 2.192.19 150 138 553 302 0 0 0 0 GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ww 15.6815.68 30.5030.50 12 0 188 366 0 0 0 0 CC 16X19-0zd16X19-0zd 0.4080.408 --1.591.59 1.371.37 295 295 468 404 105 105 166 144 FF 22A-tph22A-tph 1.3581.358 --38.0238.02 0.000.00 295 33 1255 0 105 7 266 0 6 c) AED excursion 69 71 Envelope loss/gain 4235 2613 1273 943 12 a) Infiltration 738 208 156 44 b) Room ventilation 0 0 0 0 13 Internal gains:Occupants @ 230230 0 0 0 0 Appliances/other 1650 1250 Subtotal (lines 6 to 13)4972 4471 1430 2237 Less external loadLess external load 0 0 0 0 Less transferLess transfer 0 0 0 0 RedistributionRedistribution 0 0 0 0 14 Subtotal 4972 4471 1430 2237 15 Duct loads 22%24%1105 1073 22%24%318 537 Total room load 6078 5544 1748 2774 Air required (cfm)Air required (cfm)216 249 62 125 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2020-Apr-23 16:54:00 Right-Suite® Universal 2019 19.0.08 RSU08101 Page 4 ...ightsoft HVAC\WILLIAMS RESIDENCE- PACE 2000.rup Calc = MJ8 Front Door faces: S Job:Right-J® Worksheet Apr 23, 2020Date:Entire House By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name LIVING ROOM NOOK 2 Exposed wall 19.0 ft 13.0 ft 3 Room height 10.7 heat/coolft 10.0 heat/coolft 4 Room dimensions ft336.0x1.0 ft17.0x13.0 5 Room area 336.0 ft²221.0 ft² Ty Construction U-value Or HTM Area (ft²)Load Area (ft²)Load number (Btuh/ft²-°F)(Btuh/ft²-°F)(Btuh/ft²)(Btuh/ft²)or perimeter (ft)(Btuh)or perimeter (ft)(Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 WW 13A-4ocs13A-4ocs 0.1430.143 nn 4.004.00 2.192.19 0 0 0 0 130 34 136 74 .GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 nn 15.6815.68 13.2213.22 0 0 0 0 96 0 1505 1269 .WW 13A-4ocs13A-4ocs 0.1430.143 ee 4.004.00 2.192.19 0 0 0 0 0 0 0 0 .GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ee 15.6815.68 30.5030.50 0 0 0 0 0 0 0 0 11 WW 13A-4ocs13A-4ocs 0.1430.143 ss 4.004.00 2.192.19 203 113 454 248 0 0 0 0 GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ss 15.6815.68 14.1714.17 90 0 1411 1276 0 0 0 0 WW 13A-4ocs13A-4ocs 0.1430.143 ww 4.004.00 2.192.19 0 0 0 0 0 0 0 0 GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ww 15.6815.68 30.5030.50 0 0 0 0 0 0 0 0 CC 16X19-0zd16X19-0zd 0.4080.408 --1.591.59 1.371.37 336 336 533 460 221 221 350 302 FF 22A-tph22A-tph 1.3581.358 --38.0238.02 0.000.00 336 19 722 0 221 13 494 0 6 c) AED excursion 167 -38 Envelope loss/gain 3120 2150 2486 1608 12 a) Infiltration 454 128 291 82 b) Room ventilation 0 0 0 0 13 Internal gains:Occupants @ 230230 0 0 0 0 Appliances/other 0 500 Subtotal (lines 6 to 13)3575 2278 2777 2190 Less external loadLess external load 0 0 0 0 Less transferLess transfer 0 0 0 0 RedistributionRedistribution 39 33 0 0 14 Subtotal 3614 2311 2777 2190 15 Duct loads 22%24%803 555 22%24%617 526 Total room load 4417 2866 3394 2715 Air required (cfm)Air required (cfm)157 129 121 122 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2020-Apr-23 16:54:00 Right-Suite® Universal 2019 19.0.08 RSU08101 Page 5 ...ightsoft HVAC\WILLIAMS RESIDENCE- PACE 2000.rup Calc = MJ8 Front Door faces: S Job:Right-J® Worksheet Apr 23, 2020Date:Entire House By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name KITCHEN BATH 2 2 Exposed wall 14.0 ft 8.0 ft 3 Room height 10.0 heat/coolft 10.0 heat/coolft 4 Room dimensions ft13.0x14.0 ft13.0x8.0 5 Room area 182.0 ft²104.0 ft² Ty Construction U-value Or HTM Area (ft²)Load Area (ft²)Load number (Btuh/ft²-°F)(Btuh/ft²-°F)(Btuh/ft²)(Btuh/ft²)or perimeter (ft)(Btuh)or perimeter (ft)(Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 WW 13A-4ocs13A-4ocs 0.1430.143 nn 4.004.00 2.192.19 140 132 529 289 80 59 235 128 .GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 nn 15.6815.68 13.2213.22 8 0 125 106 21 0 335 282 .WW 13A-4ocs13A-4ocs 0.1430.143 ee 4.004.00 2.192.19 0 0 0 0 0 0 0 0 .GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ee 15.6815.68 30.5030.50 0 0 0 0 0 0 0 0 11 WW 13A-4ocs13A-4ocs 0.1430.143 ss 4.004.00 2.192.19 0 0 0 0 0 0 0 0 GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ss 15.6815.68 14.1714.17 0 0 0 0 0 0 0 0 WW 13A-4ocs13A-4ocs 0.1430.143 ww 4.004.00 2.192.19 0 0 0 0 0 0 0 0 GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ww 15.6815.68 30.5030.50 0 0 0 0 0 0 0 0 CC 16X19-0zd16X19-0zd 0.4080.408 --1.591.59 1.371.37 182 182 289 249 104 104 165 142 FF 22A-tph22A-tph 1.3581.358 --38.0238.02 0.000.00 182 14 532 0 104 8 304 0 6 c) AED excursion -38 -10 Envelope loss/gain 1475 605 1038 542 12 a) Infiltration 313 88 179 50 b) Room ventilation 0 0 0 0 13 Internal gains:Occupants @ 230230 0 0 0 0 Appliances/other 1500 0 Subtotal (lines 6 to 13)1788 2194 1217 593 Less external loadLess external load 0 0 0 0 Less transferLess transfer 0 0 0 0 RedistributionRedistribution 0 0 26 22 14 Subtotal 1788 2194 1243 615 15 Duct loads 22%24%397 526 22%24%276 147 Total room load 2185 2720 1519 762 Air required (cfm)Air required (cfm)78 122 54 34 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2020-Apr-23 16:54:00 Right-Suite® Universal 2019 19.0.08 RSU08101 Page 6 ...ightsoft HVAC\WILLIAMS RESIDENCE- PACE 2000.rup Calc = MJ8 Front Door faces: S Job:Right-J® Worksheet Apr 23, 2020Date:Entire House By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name HALL LINEN 2 Exposed wall 0 ft 0 ft 3 Room height 10.0 heat/coolft 10.0 heat/coolft 4 Room dimensions ft4.0x17.0 ft2.0x9.0 5 Room area 68.0 ft²18.0 ft² Ty Construction U-value Or HTM Area (ft²)Load Area (ft²)Load number (Btuh/ft²-°F)(Btuh/ft²-°F)(Btuh/ft²)(Btuh/ft²)or perimeter (ft)(Btuh)or perimeter (ft)(Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 WW 13A-4ocs13A-4ocs 0.1430.143 nn 4.004.00 2.192.19 0 0 0 0 0 0 0 0 .GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 nn 15.6815.68 13.2213.22 0 0 0 0 0 0 0 0 .WW 13A-4ocs13A-4ocs 0.1430.143 ee 4.004.00 2.192.19 0 0 0 0 0 0 0 0 .GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ee 15.6815.68 30.5030.50 0 0 0 0 0 0 0 0 11 WW 13A-4ocs13A-4ocs 0.1430.143 ss 4.004.00 2.192.19 0 0 0 0 0 0 0 0 GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ss 15.6815.68 14.1714.17 0 0 0 0 0 0 0 0 WW 13A-4ocs13A-4ocs 0.1430.143 ww 4.004.00 2.192.19 0 0 0 0 0 0 0 0 GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ww 15.6815.68 30.5030.50 0 0 0 0 0 0 0 0 CC 16X19-0zd16X19-0zd 0.4080.408 --1.591.59 1.371.37 68 68 108 93 18 18 29 25 FF 22A-tph22A-tph 1.3581.358 --38.0238.02 0.000.00 68 0 0 0 18 0 0 0 6 c) AED excursion -2 0 Envelope loss/gain 108 91 29 24 12 a) Infiltration 0 0 0 0 b) Room ventilation 0 0 0 0 13 Internal gains:Occupants @ 230230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13)108 91 29 24 Less external loadLess external load 0 0 0 0 Less transferLess transfer 0 0 0 0 RedistributionRedistribution -108 -91 -29 -24 14 Subtotal 0 0 0 0 15 Duct loads 22%24%0 0 22%24%0 0 Total room load 0 0 0 0 Air required (cfm)Air required (cfm)0 0 0 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2020-Apr-23 16:54:00 Right-Suite® Universal 2019 19.0.08 RSU08101 Page 7 ...ightsoft HVAC\WILLIAMS RESIDENCE- PACE 2000.rup Calc = MJ8 Front Door faces: S Job:Right-J® Worksheet Apr 23, 2020Date:Entire House By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name CLST 2 BEDROOM 2 2 Exposed wall 0 ft 16.0 ft 3 Room height 10.0 heat/coolft 10.0 heat/coolft 4 Room dimensions ft2.0x9.0 ft185.0x1.0 5 Room area 18.0 ft²185.0 ft² Ty Construction U-value Or HTM Area (ft²)Load Area (ft²)Load number (Btuh/ft²-°F)(Btuh/ft²-°F)(Btuh/ft²)(Btuh/ft²)or perimeter (ft)(Btuh)or perimeter (ft)(Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 WW 13A-4ocs13A-4ocs 0.1430.143 nn 4.004.00 2.192.19 0 0 0 0 0 0 0 0 .GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 nn 15.6815.68 13.2213.22 0 0 0 0 0 0 0 0 .WW 13A-4ocs13A-4ocs 0.1430.143 ee 4.004.00 2.192.19 0 0 0 0 0 0 0 0 .GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ee 15.6815.68 30.5030.50 0 0 0 0 0 0 0 0 11 WW 13A-4ocs13A-4ocs 0.1430.143 ss 4.004.00 2.192.19 0 0 0 0 130 70 280 153 GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ss 15.6815.68 14.1714.17 0 0 0 0 60 0 941 850 WW 13A-4ocs13A-4ocs 0.1430.143 ww 4.004.00 2.192.19 0 0 0 0 30 30 120 66 GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ww 15.6815.68 30.5030.50 0 0 0 0 0 0 0 0 CC 16X19-0zd16X19-0zd 0.4080.408 --1.591.59 1.371.37 18 18 29 25 185 185 293 253 FF 22A-tph22A-tph 1.3581.358 --38.0238.02 0.000.00 18 0 0 0 185 16 608 0 6 c) AED excursion 0 100 Envelope loss/gain 29 24 2243 1423 12 a) Infiltration 0 0 358 101 b) Room ventilation 0 0 0 0 13 Internal gains:Occupants @ 230230 0 0 0 0 Appliances/other 0 600 Subtotal (lines 6 to 13)29 24 2601 2124 Less external loadLess external load 0 0 0 0 Less transferLess transfer 0 0 0 0 RedistributionRedistribution -29 -24 59 50 14 Subtotal 0 0 2660 2174 15 Duct loads 22%24%0 0 22%24%591 522 Total room load 0 0 3251 2695 Air required (cfm)Air required (cfm)0 0 116 121 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2020-Apr-23 16:54:00 Right-Suite® Universal 2019 19.0.08 RSU08101 Page 8 ...ightsoft HVAC\WILLIAMS RESIDENCE- PACE 2000.rup Calc = MJ8 Front Door faces: S Job:Right-J® Worksheet Apr 23, 2020Date:Entire House By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name BEDROOM 3 CLST 3 2 Exposed wall 26.0 ft 2.0 ft 3 Room height 10.0 heat/coolft 10.0 heat/coolft 4 Room dimensions ft185.0x1.0 ft2.0x9.0 5 Room area 185.0 ft²18.0 ft² Ty Construction U-value Or HTM Area (ft²)Load Area (ft²)Load number (Btuh/ft²-°F)(Btuh/ft²-°F)(Btuh/ft²)(Btuh/ft²)or perimeter (ft)(Btuh)or perimeter (ft)(Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 WW 13A-4ocs13A-4ocs 0.1430.143 nn 4.004.00 2.192.19 0 0 0 0 0 0 0 0 .GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 nn 15.6815.68 13.2213.22 0 0 0 0 0 0 0 0 .WW 13A-4ocs13A-4ocs 0.1430.143 ee 4.004.00 2.192.19 130 130 521 284 20 20 80 44 .GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ee 15.6815.68 30.5030.50 0 0 0 0 0 0 0 0 11 WW 13A-4ocs13A-4ocs 0.1430.143 ss 4.004.00 2.192.19 130 70 280 153 0 0 0 0 GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ss 15.6815.68 14.1714.17 60 0 941 850 0 0 0 0 WW 13A-4ocs13A-4ocs 0.1430.143 ww 4.004.00 2.192.19 0 0 0 0 0 0 0 0 GG 2 glazing, clr low-e 0.5602 glazing, clr low-e 0.560 ww 15.6815.68 30.5030.50 0 0 0 0 0 0 0 0 CC 16X19-0zd16X19-0zd 0.4080.408 --1.591.59 1.371.37 185 185 293 253 18 18 29 25 FF 22A-tph22A-tph 1.3581.358 --38.0238.02 0.000.00 185 26 989 0 18 2 76 0 6 c) AED excursion 101 -1 Envelope loss/gain 3024 1642 185 67 12 a) Infiltration 581 164 45 13 b) Room ventilation 0 0 0 0 13 Internal gains:Occupants @ 230230 0 0 0 0 Appliances/other 300 0 Subtotal (lines 6 to 13)3605 2106 229 80 Less external loadLess external load 0 0 0 0 Less transferLess transfer 0 0 0 0 RedistributionRedistribution 147 61 -229 -80 14 Subtotal 3751 2167 0 0 15 Duct loads 22%24%834 520 22%24%0 0 Total room load 4585 2687 0 0 Air required (cfm)Air required (cfm)163 121 0 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2020-Apr-23 16:54:00 Right-Suite® Universal 2019 19.0.08 RSU08101 Page 9 ...ightsoft HVAC\WILLIAMS RESIDENCE- PACE 2000.rup Calc = MJ8 Front Door faces: S Job:Right-J® Worksheet Apr 23, 2020Date:Entire House By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name LAUNDRY 2 Exposed wall 6.0 ft 3 Room height 10.0 heat/coolft 4 Room dimensions ft6.0x9.0 5 Room area 54.0 ft² Ty Construction U-value Or HTM Area (ft²)Load Area Load number (Btuh/ft²-°F)(Btuh/ft²)or perimeter (ft)(Btuh)or perimeter Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 W 13A-4ocs 0.143 n 4.00 2.19 0 0 0 0 .G 2 glazing, clr low-e 0.560 n 15.68 13.22 0 0 0 0 .W 13A-4ocs 0.143 e 4.00 2.19 60 36 144 79 .G 2 glazing, clr low-e 0.560 e 15.68 30.50 24 0 376 732 11 W 13A-4ocs 0.143 s 4.00 2.19 0 0 0 0 G 2 glazing, clr low-e 0.560 s 15.68 14.17 0 0 0 0 W 13A-4ocs 0.143 w 4.00 2.19 0 0 0 0 G 2 glazing, clr low-e 0.560 w 15.68 30.50 0 0 0 0 C 16X19-0zd 0.408 -1.59 1.37 54 54 86 74 F 22A-tph 1.358 -38.02 0.00 54 6 228 0 6 c) AED excursion 31 Envelope loss/gain 834 916 12 a) Infiltration 134 38 b) Room ventilation 0 0 13 Internal gains:Occupants @ 230 0 0 Appliances/other 0 Subtotal (lines 6 to 13)968 954 Less external load 0 0 Less transfer 0 0 Redistribution 124 53 14 Subtotal 1092 1007 15 Duct loads 22%24%243 242 Total room load 1335 1248 Air required (cfm)48 56 2020-Apr-23 16:54:05 Right-Suite® Universal 2019 19.0.08 RSU08101 Page 1 ...ightsoft HVAC\WILLIAMS RESIDENCE- PACE 2000.rup Calc = MJ8 Front Door faces: S Job:Duct System Summary Apr 23, 2020Date: Entire House By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM Project Information GARRY WILLIAMS, PACE 2000, INC.For: FORT PIERCE, FL CoolingHeating External static pressure in H2O1.00in H2O1.00 Pressure losses in H2O0in H2O0 Available static pressure in H2O1.00in H2O1.00 Supply / return available pressure 0.500 / 0.500 in H2O in H2O0.500 / 0.500 Lowest friction rate in/100ft1.000in/100ft1.000 Actual air flow cfm1173cfm1173 Total effective length (TEL)ft241 Supply Branch Detail Table Design Htg Clg Design Diam H x W Duct Actual Ftg.Eqv Name (Btuh)(cfm) (cfm)FR (in)(in)Matl Ln (ft)Ln (ft) Trunk st2135.027.4VlFx0x05.01.00034541519hBATH 2 st1115.014.2VlFx0x07.01.0001211162695cBEDROOM 2 st1115.015.0VlFx0x07.01.0001211634585hBEDROOM 3 st3155.052.6VlFx0x07.01.000125622774cFOYER st2135.032.0VlFx0x07.01.000122782720cKITCHEN st1115.011.8VlFx0x06.01.00056481248cLAUNDRY st2135.027.5VlFx0x07.01.0001291574417hLIVING ROOM st4175.062.3VlFx0x06.01.00041691925hM BATH st4175.065.8VlFx0x05.01.00031541522hM TOILET st4175.063.7VlFx0x05.01.0002335995hM WIC st3155.061.1VlFx0x07.01.0001241082772cMASTER BEDROOM st3155.050.6VlFx0x07.01.0001241082772cMASTER BEDROOM-A st3155.054.8VlFx0x07.01.0001221212715cNOOK Supply Trunk Detail Table Trunk Htg Clg Design Veloc Diam H x W Duct Name Type (cfm)(cfm)FR (fpm)(in)(in)Material Trunk st4 Peak AVF 158 95 1.000 592 7.0 0x0 VinlFlx st3 st3 Peak AVF 558 591 1.000 752 12.0 0x0 VinlFlx st2 st2 Peak AVF 847 876 1.000 819 14.0 0x0 VinlFlx st1 st1 Peak AVF 1173 1173 1.000 840 16.0 0x0 VinlFlx 2020-Apr-23 16:54:05 Right-Suite® Universal 2019 19.0.08 RSU08101 Page 2 ...ightsoft HVAC\WILLIAMS RESIDENCE- PACE 2000.rup Calc = MJ8 Front Door faces: S Return Branch Detail Table Grille Htg Clg TEL Design Veloc Diam H x W Stud/Joist Duct Name Size (in) (cfm)(cfm)(ft)FR (fpm)(in)(in)Opening (in) Matl Trunk rb1 0x 11730 1173 0 0 0 0 x0 0 VlFx ��������������������������������������������������������������������������� ��������������������������������������������������������������������������������� �����������������������������������������������������