HomeMy WebLinkAboutEngineer's LettersJame:s D. Bushouse, PE
Mario Arbucci
Coastal Construction
w
• 5 O NW
Stuarti,
Consultain
Federal Highway,
F1 34994
4824 Watersong Way,,
Mario ,
Suite
En ine rs
Inc.
Pierce,
Fl, Permit
ff 2:005-0211
installation on the above project. All precast, as well as the
reinforcing steel and mesh for the second floor system has been
installed in compliance with the approved plans for the project.
If you have any questions, please contact me at the below
Sincerely,
h1
asnouse,
Professional
E,ngimneer #20311
State of Florida
fiffirtilb 1�"- ism F^ -Tl YZA IJE
s
]aures D. Bushouse, PE
Consultin Engineers
August 4, 21020
IMP;
Mario Arbucc I'
Coastal Construction &
8501 NW Federal Highway
Stuart, F1 34994
Re,: 4824 Watersong
Dear Mario,
Design,
Suite
Inc.
4 61
Way, Fort Pierce,, F1 ,
Per your request, I inspected the
II
installation on the above r)ro"iect.
reinforcing
N
nstalled
steel and mesh for the
Permit
-o21i
second floor precast concrete
All precast, as well as the
second
in compliance with the approved
I f you have
address.
Sincerely,
any
questions,
JAS D.
Prof ess,i
State of
Bushouse, P.E.
onal Engineer #20311
please contact
Florida
floor system has been
plans for the project.
iae .i.t the below
Phone: (954) 956-2203
P.O. Box 1-231 7f
Phone: (863) 491 -
Fax: (954) 9562204
A
rir
.,adia, Florida 34265
1=82 3
2 .2 Faxe 86
jim@jamesbushouseinc.co
m