Loading...
HomeMy WebLinkAboutCompaction testHeadquartersMailing 011345 U.S. High!!'119 1 tENGINEERINGe PO Box 78-1377 Sebastian, FL. 32958!r1moh; JLvi AND T T N •Sebastian, FL. 329789 Orlando•Phone: 772-589-0712 723 Progress Way* SOIL COMPACTION REPORT C.A.# 5693 • Sanford, FL. 32771 OASTM D 1557 and ASTM D 6938 KSMengineering.net •• • DATE TESTED: *August 4, 2020 4CS�JO :202688-3d/CH/jo PT= 2006-0104 NUC # 41W CONTRACTOR: Brett Webster Tractor Nuc Model: 3500 JOB LOCATION: 2635 S. Brocksmith Road Nuc Serial #. 3� 417 � • *Ft. Pierce, Florida • • ITEM TESTED: OCorpted Ffkdatio'F Fill for thPff P 1- Final Lift • TEST LOCATION � PEN DRY • MAX. DRY — • PERCENTI D 40 OF SAMPLE— READMPDENSITY 0 PROCTOR VALUE (P.C.F) • COMPACTION+♦ 01. N. E. 0" - 12" 0460 .111.2 • 112.9 • 98.5% 02. S. E. 0440 0110.6 • 98.0%0 03. Cente 0450 0110.90 98.2%0 04. N.W. 0460 0111.10 98.4%0 i L47 _� 110. 4 97.89/c� %" �� 109.0 ------ Vlie 1% �314 Soil Description: 111 " I I 1 II •Brown Sand with � • W OE I I I I 1 I 01 aces of Clay & Shell Nn 1 •G I I I 113.0 4— I I Place Moisture: KSM is not responsible if the tested area has been 010.41 Proctor Optimum Moisture: 11.0% roc or ax. D• ensr : P.C.F. •112.9 ,@ Test Locations the Density & Penetrometer readings indicate the Degree of Compaction Meets • Minimum Requirement for Unstaked Foundation Respectfully Submitt�d: E 68366•: STATE OF H I I, I • •T I I I I I OF, 112.0 1—..—.1—..—.I —...1..—.. •I• • • •1 1 1 C I . �I� I �I I • 111.0—.._.J—. —.1.—..-4.—..�..— .�..—... OF • I • I I I • 110.0 —.—..—.I.—..—r._..—..�...—... D i 'I•�I�•I•�I OR 109.0 ------ Vlie 1% �314 Moisture - % of Dry Weight Disclaimer: Contractor is r4onsible to maintain the tested areairOthe condition that KSM completed the indicated passed compaction test. KSM is not responsible if the tested area has been altered from the approved inspected condition. SAL� r/"J .1fulie E"Ilex,�P;E:''46 e de-h—tO -PE # 68366 8/5/2020 Email to: St Lucie County Building Department; brett.webster@yahoo.com Proudly Serving Florida since 19900