Loading...
HomeMy WebLinkAboutLetter; Soil Bearing Capacity Evaluation0 6t)-0b3� MULHERN+KULP RESIDENTIAL STRUCTURAL ENGINEERING 300 Brookside Avenue, Building 4, Ambler, PA 19002 - p 215-646-8001 - mulhemkulp.com February 11, 2020 IT Brenner WADEJURNEY HOMES 3300 Battleground Ave. Suite 101 Greensboro, NC 27410 Lakewood Park Community, Florida All Models Designed By Mulhem + Kulp SOIL BEARING CAPACITY EVALUATION M+K Project #: 195-19000 (04/39) Reference Master Al-udural Plans, prepared by Mulhem t Kulp, latest reuision Final Foundation Certification for HUD Guidelines - House pad Lakewood Park, prepared by Universal Engineering Sciences, lNC. 7501 Brookline Ave. —Test Date: 1/24/2020-- Sealed Letteroate: 112712020 8104 Santa Clara Blvd — Test Date: 1112712019 — Sealed Letter date: 112712020 7105 Brookline Ave. — Test Date: 1112712019 — Sealed Letter date: 112712020 7404 Santa Clara Blvd -- Test Date: 1112712019 -- Sealed Letter date: 112712020 7103 Brookline Ave. -- Test Date: 1112712019 -- Sealed Letter date: 112712020 JT: Pursuant to your request, we have prepared this letter to address the concerns of the local building department for the above referenced community in regard to design soil bearing capacity. It is our understanding that the city has noted that our structural plans specify a minimum 2000 PSF soil bearing capacity, and the city has requested that soil testing is to be submitted to ensure conformance to the specifications. As you have relayed to us, all lots in the community were excavated and then backfilled and compacted (Cut and Filled) with controlled engineered fill. A third party geotechnical engineering firm, Universal Engineering Sciences, was tasked with conducting soil tests on several lots within the above referenced community to determine the soil bearing capacity. Please note, Mulhem + Kulp has not visited the site, but information was provided for our review. The third party lot soils reports referenced above have indicated that the soils meet the 2000 PSF soil bearnq capacity specified on our structural plans. It is our professional engineerng judgement that all lots designed by Mulhem + Kulp in the community of Lakewood Park, FL adequately meet the 2000 PSF soil bearing capacity, provided that the sites have been prepared similarly to that of the lots listed above. Please feel free to call if you have any questions. G. Respectfully, 1 '• C 7782 MULHERN & KULP STRUCTURAL ENGINEERING' INC. o , sr E of ;' oar lose A. lzquierdo, P.E. Project Engineer ���•• �<4`� • RIDP-�\tZ James G. Fdling, P.E. Principal/Director of Operations �SS,� : PlClient Rles1195- Wade/umeyHomesl20/9119000 - Genera/ OientAdminlCommunity-SpecifcfvaII2019-12-27- LWP- Soilbeadng Letterl2020-02-11- Lakewood Pad(- 5ot1 Bearing Pressure Letterdoa _ 1