HomeMy WebLinkAbout5809 Spruce-Certificate of Termite TreatmentPlanning Development maims
Building &Code Regulation n
2300 Mirginla Ave
Fort Plercel FL 34992
7-"-1 Fax --443
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT #: / 91I z oY �� JOB ADDRESS: 5-499? �i'vc e' iiz �� P,rrrF
BUILDER/CONTRACTOR J7L
PEST CONTROL CONTRACTOR:
PEST" CONTROL LICENSE #:
the undersigned.,
hereby comfy
that we have preb-eated the above
descTibed cwstrucdon for
subterranean
termites
in accordance
with the
standards
of
the National
Pest Control Association.
square if -Za2
ZLI
Percentage of solution:
Date of Tr a ent:
1 t
-Try
Driveway
I s'Treat meat
Fie -Trot
Other
1111 Treatment.Re-Treat
5
Chemicals used
--- ki
Total gallons used:
rime of Treatment: . f
Slab
131 Treatment
Re -Treat
-pools
11" Treatment
Re -Treat
Perimeter for Final Inspection
I�
Signature of Extei nar
Note: ire mLst be a cmnpWed form for axt required bvaftnent or re-treaftnent and ist be on Me job
site to be picked up by the inspector at ffme of eao� inspection or ffie .wed l d ilupmtibn will fail and a re-inspectibn
fee aryed
PSI . . Lett to o Treatment rpm rat ea
� r �r jobsite�r
,shall be provided to mceiie dupliimteTreatment i7erficas as each required pry treetwet is mwt.
provhAng a copy for the p mn the permit is hzued to and a it copy tbr e building pwmit fts. 777e Treabwe7t
Cerffficate.5hafl pwvkLev Me product used, idendty of Me appl atov� time and date a &eatmen4 sfte lotion, area
chemical � t n and number o gallons � � �
r tmtive tr t. If ff7e soil dxynical Vie' mood for t&mite preventbn Is used, Anal e4ador bwtment shall
be completed prybr to Anal building approval.
t Lurie Coin requires for te final 'inspection fbr CO,, a Permanent Sdcker to be placed on
thlei cal panel box cover., Ifs ng all the e and dates of applications&
Reed 7/ 41201