Loading...
HomeMy WebLinkAboutFPUA Receipt 8-10Fort Pierce Utilities Authority "Committed To Quality" Water/Wastewater Engineering P.O. Box 3191 (34948-3191) 1701 S. 37th Street Please remit payment to: Fort Pierce Utilities Authority Attention: Key Accounts Department P.O. Box 3191 Fort Pierce, FL 34948-3191 Fort Pierce, FL 34947 Phone (772)466-1600 Fax (772)468-2414 Job Location: 3751 Virginia Avenue Invoice Number: 5,681 Account Name: HSC Fort Pierce, LLC - Dollar General PCN: 242022100020009 Contact Name: Linda Biro FEI# Billing Address 805 Trione Avenue Daphne AL Phone: (772)359-9322 Fax: ( ) - Cell: Location Id: FPLAA COMMUNITY PROU 36526 Accounting Codes # Size Description Fees 06-3-060-43701-0000 2 1", 3/4" Water Meter and/or Service Installation El General $1,500.00 06-2-000-23500-0000 Water Security Deposit ❑ Inside City Limits $220.00 06-3-060-48800-0000 Water New Account Setup Charge $60.00 06-3-060-43702-0000 Water Capital Improvement Charge W ERC's 5.44 $10,064.00 08-2-000-23500-0000 Wastewater Security Deposit $90.00 08-3-080-48800-0000 Wastewater New Account Setup Charge $20.00 08-3-080-43702-0000 Wastewater Capital Improvement Charge WW ERC's 1.00 $2,850.00 Accounting Codes Construction Cost Estimate Fees METER AUTHORIZATION REQUIRED Invoice Total:$14.804.00 Description for service order: CIC fees based on meter; Install (1) 1" Irrig. Meter 1331 GDP/4.44 WERC (1) 3/4"/1 WERC Meter w/ sewer - 1 WWERC based on EOR calculations. Total Paid: $14,804.00 Date Paid: 08/10/2020 Check Number: 4030 Customers will be assessed wastewater charges the day they connect to the wastewater system or within 365 days from date wastewater Connection Charge is paid - whichever is first. The cost of the service line from the point of delivery at the property line to the house/building is the responsibility of the customer and is not included in this invoice. State laws require that a permit from the Health Department must be obtained prior to initiating a septic tank abandonment. Contact the Health Department at (772)873-4931. Construction cost estimates are based on current labor, equipment and material prices. Actual costs of construction will be determined at the completion of the project. Should unforeseen circumstances be encountered during construction, including but not limited to adverse weather conditions and construction conflicts, the customer will be responsible for increased costs. Additional costs incurred by the customer shall not exceed fifteen (15) percent of the total estimated construction costs shown above. Estimated costs paid by the customer that exceed the actual cost of construction will be refunded by Fort Pierce Utilities Authority. Reviewed By: Customer's Signature: Printed Name: Date: 2020-08-04 Date: F//c1%? c.)