Loading...
HomeMy WebLinkAboutSybert gen app, contractAll APPLICABLE INFO MUST BE COMPLETED FOR APPLICATION TO BE ACCEPTED Date: Permit !Number: S11 C IL MU vd- Building Permit Application Planning and Development Services Building and Code Regulation Division 2300 Virginia Avenue Fort Pierce FL 34982 Phone: (772) 462-1553 Fax: (772) 462-1578 Commercial Residential x PERMIT APPLICATION FOR: Generator PROPOSED IMPROVEMENT LOCATION: Address: 3213 River drive Fart Pierce Florida 34981 Property Tax ID #: 2430-502-0061-0010-3 Lot No. 61 Site Plan Name: Sybert Gen Block No. Project Name: DETAILED DESCRIPTION OF WORK: Remove existing 15kw generator, Replace with new 16kw generator and re pipe into existing 16 circuit transfer switch New Electrical Meter Second Electrical Meter CONSTRUCTION INFORMATION: Additional work to be performed under this permit– check all that apply: _Mechanical _ Gas Tank — Gas Piping _ Shutters Windows/Doors Pond Electric — Plumbing _Sprinklers , Generator Roof ` Pitch Total Sq. Ft of Construction: Sq. Ft. of First Floor: Cost of Construction: $ 6,2010.65 Utilities: —Sewer _ Septic Building Height: OWNER/LESSEE: CONTRACTOR: NameJune Sybert Name: Michael Flaxman Address:3213 River Drive Company: Energized Electric City: Fort Pierce State: Address:4252 Bandy Blvd Zip Code: 34981 Fax: City: Fort Pierce FI State: Phone Na. Zip Cade: 34981 Fax: 772-318-6672 E -Mail: Phone No 772-466-1095 Fill in fee simple Title Holder on next page ( if different E-Mailenergizedgenerators@gmail.com from the Owner listed above) State or County License EC13006279 If Valva of rnnctri tri -i— it 'Jr -nn , „�, , ,,,�", ��WL LC w wiF111MI t!1nenL IS req ulrea. If value of HAVC is $7,500 or more, a RECORDED Notice of Commencement is required. SUPPLEMENTAL CONSTRUCTION LIEN LAW INFORMATION: DESIGNER/ENGINEER: Name:_ Address: City: Zip: Phone FEE SIMPLE TITLE HOLDER Name: Address: City: Zip: Phone: Not Applicable + MORTGAGE COMPANY: Not Applicable State Not Applicable Name: Address: City: Zip: Phone: State: BONDING COMPANY: Not Applicable Name: Address: City: Zip:. Phone: OWNER/ CONTRACTOR AFFIDVIT: Application is hereby made to obtain a permit to do the work and installation as indicated. I certify that no work or installation has commenced prior to the issuance of a permit. St. Lucie County makes no representation that is granting a permit will authorize the permit holder to build the subject structure which is in conflict with any applicable Home Owners Association rules, bylaws or and covenants that may restrict or prohibit such structure. Please consult with your Home Owners Association and review your deed for any restrictions which may apply. In consideration of the granting of this requested permit, I do hereby agree that I will, in all respects, perform the work in accordance with the approved plans, the Florida Building Codes and St. Lucie County Amendments. The following building permit applications are exempt from undergoing a full concurrency review: room additions, accessory structures, swimming pools, fences, walls, signs, screen rooms and accessory uses to another non-residential use WARNING TO OWNER: Your failure to Record a Notice of Commencement may result in paying twice for improvements to your property. A Notice of Commencement must be recorded in the public records of St. Lucie County and posted on the jobsite before the first inspection. If you intend to obtain financing, consult with lender or an attorney before -cornmeagrfrig work or recording our Notice of Commencement. Signature of Owner/ as Agent for Owner STATE OF FLORID COUNTY OF LL 5wor to or affirmed) and subscribed before me of Physical Prewince or Online Notarization this%`•clay ofMkII.Q 2020 by Name of person making ftatement. Personally Known OR Produced Identification Type of Identification Produced M -Y CONMISS*N#%G L�21 'FXPIRES: June 27, 2622 undm REVIEWS FRONT ZONING COUNTER REVIEW QATE RECEIVED DATE COMPLETED Signature of C9dira for/Lig`ense Holder STATE OF FLORID COUNTY OF Sworn to {or affirmed} and subscribed Before me of —)!L-IP-hysical Presence or Online Notarization this day of 22020 by l L P Name of person making statement. Personally Known OR Produced Identification Type of Identification Produced (Signature of Notary Public- State of Florida ) Commission MY COMMISSION # GG 232345 —�'��� 'rhruN • ----- r: SUPERVISOR PLANSrlr U ae i 'NGROVE _REVIEW REVIEW REVIEW REVIEW REVIEW USGenerator@ MAT GAS1Pk�'ANE L124871 EC 13006427 725 Commerce Center drive St, J 772-778-0131 1561-889-0435 West Palm Beach 1772-794-2439 Fax E-mail USGen@comcast.net Peace of Mind Purchase Agreement Type Fuel. Natural Gas ro ane Diesel Voltage & Frequency: ov phase: KW � �C [s. 9 Customer: "+ i . wt`s? - Address: 2 `v r Ctyr ye Zip I Phone: 7;i q 11 - o,3q l E-mail address: Date: l - - c_Sale Priae:5, -� q% E Package Sale Price Includes: Gate Code? Meter Pull? Flood Plane? HOA 1 _ Delivery of the generator to the job site & cost of heavy crane or other spe- - - - ciali7ed equipment, if required. 2- Preparing the site and placing the generator - 3. A 4000 psi concrete/fiberglass reinforced hurricane pad according to manufacturer's specifications -2r -and transfer switch integrated with the electrical system according to all applicable building codes. 5. Mounting the automatic transfer switch with built in emergency load center or direct feed to existing house panel on a customer approved location which complies with all codes and specifications and cleanup of jobsite. - 6.--6TrMTsfer-switch -&-panel cuafiguratiofr: icirdelundetliie 2) Whole-panelfhcruse4-ransf-,f-or partial panel transfer. 15CB-[7o-a-rTcdhter-t5lDanrp 23JOrWhp-Nexus 300--amp-Nexus 400 -amp -Nexus-MO arrr"e7cau---Fil Ws # 7_ Providing standard Interstate start battery. (18 month warranty) 8. Application of external and internal corrosion prevention product 9. Customer training, presentation of factory manual, maintenance log including warranty information will be scheduled at your convenience within 30 days of your final payment 10. Five (5) year limited warranty on liquid cooled and air cooled engine generators. 11. Since permitting fees vary among governing bodies, the cost for permits, elevation certificates, notices of commence- ment, insurance assignment fees and HOA/county/city processing fees and engineering fees will be added to the final payment. Administrative and inspection fees range between $ 200-250, permit fees range are $ 75.00-$ 325.00 and elevation certificates are $ 175.00 if site is in a floodplain. Large HCA deposits will be the customer's responsibility. 12. Completion will be as soon as possible and approximately 180-240 days after we receive the permit from your building department_ This is an estimate only and could be significantly shorter or longer caused by variables beyond our control such as, but not limited to: factory backlog, fuel type, availability of critical components, delays in installations scheduled ahead of yours, customer availability, FP&L delays and clerical errors in building departments. Customer initial 13. Customers desiring to leave town before the installation is finished must make payment arrangements prior to leaving and provide an available representative to complete the job. Failure to do this will cause a sLgnificant delay - Base price: $'5 V;`` r- +',roc, additional cost for non-standard installation: Transfer switches size:{----} • Number of switches (-es) Total cost for switches $ ---- - - • Additional cable & trenching for 14-22 kW over 10 Ft—$ 39.00 Ft 1$49.00 Ft for 27 kW and for 36-48 kW & larger ' ($ 59 ft) $�- 'Flood compliant pad $125 per inch over 4 inches $ ' - Power Management Modules for Nexus switch: (_-� @ $ 199.00 each. $ -- Hard start kits ( ) @ $ 185.00 each $ - Permits, fees, CAD drawings, engineering and fuel system not included. Credts: For Optional E ui rent 8 Services: --`Neve-Generator Service Pian $ 395.00 (Minimum required to maintain warranty) �{]ptima Spiral Cell Sealed AGM Battery $ 249.95 (48 month warranty) o rre tank: 250 gal 500 gal 1000 gal (circle one) Tank purchase under separate a reemenf Generator compatible whole house surge protector $ 525.00 �(11nstallations using 2 transfer switches require 2 surge protectors .l� _ Generac extended factory warranty. ( 7 years $795 ��0 ears $89 Total Price Including Optional Equipment & Services: $ NOTE: This agreement does not include roAane tanks, or fuel, natural aas hooku s or initial h11 for diesel units, huildiny permits, a fees, notices of commencement, CAD drawing fees, removing and reinstalling landscaping, bringing existing electri- cal systems up to code, paver removal and reinstallation, engineering drawings or work, Or correcting mislabeled panels. Note.'Installatr•ons in the cities of Jupiter and Port St. Lucy will incur a $ 350.00 surcharge that will be added to permit fees due to the administrative complexity of working with their building departments_ Revised 6-18-19 iev 6-13-18 Page 1 Of 2 L Peace of Mind Purchase Agreement Pg 2. Between USGenerator and The purchaser understands that USGenerator, Inc. is a licensed natural gas and propane generator specialty installer and electrical contractor and will be scheduling the various phases of the system integration. A 50% non -Refundable down payment is required upon signing this agreement. An addi- tional 3O% is due upon delivery of the generator to the lob site. The balance plus cost of all fees is due immediately upon your generator passing inspection from the building department. These pay- ment schedules may be amended by letter of agreement for builders. This price does not in- clude a propane 1 natural gas fuel system or initial fill for diesel units, customers shall contact the fuel supplier of their choice but USGenerator will coordinate the combined installation of these components and you will be billed by your fuel supplier. Your initial deposit is fully refundable for the following reasons: 1.) Homeowners association or property management, if applicable, will not ap- prove the installation, such approvals will be the customer's responsibility to obtain prior to com- mencing work. 2.) if site will not qualify for a generator or propane tank permit. You agree to help keep USGenerator, Inc. informed by phone if you experience late or non -arrival of scheduled per- sonnel. You understand that unless A CHA approved, this generator is not life support rated. lfyou have a medical condition that will immediatety threaten your life in the event of an electrical power failure. additional hardware will be required and is not included in this s stem. The purchaser per- sonally guarantees its performance under this agreement and in the event of a dispute, agrees to resolution by binding arbitration under the rules of the commercial division of the American Arbitra- tion Association. (Personal guarantees are waived for builders.) The prevailing party shall be en- titled to its reasonable legal fees and the cost of the arbitrator, if used, including travel expenses. Any dispute resolution shall be conducted in Vero Beach, Florida. In the event of a married couple, either party may sign this agreement, but agrees that the personal guarantee shall apply to both persons. You further understand that canceling this agreement, refusing delivery or failing to make the scheduled payments under this agreement could result in retaining or repossession of the gen erator and forfeiture of the a menu you have already made. If repossession is necessary, you hereby grant permission for USGenerator to enter the job site and remove the generator. This is the complete agreement between the parties and no changes are implied or permitted unless we both agree in writing. We hereby acknowledge receipt of the initial down payment of: $ �-,- Hold deposit check until notified by customer_ USGe rator, in AuthorizedReprese ntative Ag r t stomer- General information on Estimated Fuel System installation Costs (purchase tank DAILY) 1. $ 3460.00 250 gal (Not recommended for 22 kW and above generators) 2 $ 3934.50 500 gal 3. $ 5793.00 1000 gal (Prices include sales tax, permits and 10 ft of buried fuel fine. Over 10 ft billed at $ 1& 00 per foot) NOTE: A leased tank if available, is a far more cost effective option The advantage of using a sole provider for generator and tank vastly speeds up the entire process. You may then buy fuel from any fuel supplier based on their price, level of service, and reputation. Would you like USPropane, LLC to install tour tank? Tank installation handled under a se orate agree ent 06-38-19 pc 2 of 2