HomeMy WebLinkAboutSCREEN ROOM DETAIL SHEET-7-10-2018
Kruger Construction Corp.
6695 N. US #1 Unit B
Vero Beach, Fla. 32967
Phone: 772-569-5496
Fax: 772-569-9115
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
HARDWARE AND ATTACHMENT DETAILS FOR
SCREEN FILL IN AND FRONT ENTRIES UNDER EXISTING ROOFS
A
B C D
E
A = 1x2 aluminum screen channel attached to floor, side walls, concrete columns, wood post
and top beam with ¼ X 2 ¼” tap-cons with 1 within 6” of edges and post and then 24” on center.
If connecting to wood, sub out tap-cons for #10 x 2” sheet metal screws.
B = 2x2 and or 2x3 aluminum post connected to 1x2 with 2 - 1” x1” x 2” angle clips (1 each side) top
and bottom with 4 - #8 sheet metal or self-tapping screws.
C = 2x2 aluminum door jamb connection to 1x2 with 1 – 1” x 1” x 2” angle clip top and bottom
With 4 - #8 sheet metal or self-tapping screws.
D = 2x2 aluminum door jamb connected to house with ¼” x 3” tap-con, 1 within 6” of edge and
then 24” on center. If connecting to wood use #10 x 3” sheet metal screws. In some cases
for out of plum walls a receiver may be needed.
E = 2x2 aluminum chair-rail or kick plate rail connected to 1x2 or post with 1 – 1” x 1” x 2”
angle clip on the underside of rail at each end (2 per rail) with 4 - #8 sheet metal or self –
tapping screws.
F = If kick plate is added to job it will be connected thru roll form kick plate channel to aluminum structure
with #8 sheet metal or self-tapping screws, 1 within 2” from each edge and then every 16” on center.
G = If there are pavers and an 8x8 concrete piling is needed at door jamb or uprights, then we will add a 5”
tap con on 1 side of door jambs and both sides of uprights