Loading...
HomeMy WebLinkAboutTCAP70-20200811-3-8-14-20 7-digitalseal-8-14-20Notes: 1) Wall Rebar 518" "#5" 60 KSI unless specified 2) Concrete 4,000 PSI "pump inix" 3/4 Aggregate 3) ,-x.xx} elevation below finished floor. S Sloping 1 _ Sloping 0.00' � t�.0a° ,0.00�� Gara-C ; .�xO"; Garage -- Floor -------- Floor ----- ---- ----- ------------------------------------- --- (,.un"; - ---- lr,.o(r", --------------------------------------- -_-_ -_--_-_-_- -_-_-_-_-_-_--_-_ o -_--_-_-_-_-_ _- _-_-_---_ _--_-_-_-_--_-_-_ - - - - - - - -- - - - - - - - - - - - - - - -- - -- - - - - - - - - --------- ---------- ----- - ----- - A2 2 ---------- --------- I --------- ---------- N 14EEEEEE ---- Garage / Lanai & Equipment pads -48.00", _ _ _ _ _ _ _ _ _ l _ - 48.00 - - - - - - - ------ - - - ----------- 12"CMU 2 courses =_-__ _____-_ ---- -CD ' - - A5 A3 A4 Garage 2'-6" Lower level living Lanai / Deck South Wall South Wall South Wall 12" CMU 7 courses 12" CMU 5 courses 8" CMU 4 courses Pour cells to the top of the 4th course Al Pour cells to the top of the 5th course #5 Veit Rebar C& 16" O.C. Coat back site with water proofing Coat back site with water proofing in filled cells - 24" dowels into Back fill and compact. Lower level l t- Back fill and compact. footing & slab on grade 8" CMU Square 8th course "garage slab rest" 12" CMU bottomm 8" CMU Ledger top course Provide Temporary CMU 12" CMU 9th top course 8" CMU ledger top Pour cell same time as slab Wall Bracing when Backfilling Pour 8th & 9th same time as slab Pour CMU cells same time as slab #5 Vert. rebar g 24" O.C. in filled cells until Top Slab is poured #5 Vert. rebar g 24" O.C. in filled cells - 24" - 24" long dowels into footing & slab on grade dowels into footing & slab on grade Provide Temporary CMU Wall Bracing when Provide Temporary CMU Wall Bracing when Backfilling until Top Slab is poured Backfilling until Top Slab is poured 6/12 A6 I st floor to garage tooter A7 6" Thick with #�'s at 12" O.C. each way Elevator pit detail 8" CMU ledger top 8" CMU bottom Pour CMU cells same time as slab Footing 12" Wide X 10" Thick 4 sides 3- #5's Cont. This item has been electronically signed and sealed by Robert F. (deck, Ph.D.,PE using a Digital Signature and date. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. • • • Igi ally signed 2- #5 Right-angle standard dowels - 24" X 24" extended into slab on grade and into CMU column Rober e -2-#5 Vert. Rebar in 16" CMU column 0.0°" 0.00 dowel into footing -------- -------- 15-50 Garage ___________- ______ __________ _________Dat zu oo" ----- - - - - ----- - - - ---------------------- 4,_�„ ____________ _________-__________ _________-04 1 1 A9--- = 4ti(ul" -----------_--------__--- 10095 • A1-48.00': ------ Incrior Column _ • Inerior Column Main Lower Floor to Garage - Main Lower Floor 12" CMU (square) - -- - - - 12" CMU (square) 545 Vert. Fotting Dowels - 4,_6„ 2 -61 ------ /1� l 5 5-#5 Veit. Fotting Dowels - Lap splice to CMU Column Al All Lap splice to CMU Column Vert. rcbars - See Foundation Lower level living t AC Pad Vert. rebars - See Foundation plan for footing sizes & reinforcing AlO 8" CMUwith #5 Vert. rebar South Wall plan for footing sizes & reinforcing (a,)16" O.C. in f lled cells 12" CMU 5 courses Exterior Column - 24" dowels into slab on Pour cells to the top of the 5th course on Stem / Retaining Wall grade: 8" dowel into footing. Coat back site with water proofing 16" CMU (square) 8 courses Rebar connected to Back fill and compact. Pour cells to the top of the 8th course top concrete deck 8" CMU Ledger top course Coat back site with water proofing Coat back site with water proofing Pour cell same time as slab Back fill and compact. Back ell and Temporary act. Wall 45� Vert. rebar @ 24" O.C. in filled cells Provide Temporary CMU Wall 24 long dowels into footing & slab on grade Bracing when Backfilling until. Bracing when Backfilling until Provide Temporary CMU Wall gracing when Top Slab is poured Top Slab is poured ® Backfilling until Top Slab is poured a u w a 0 r O C m N u i p W U l7 u WE"'E U q u �O K2°' a u