Loading...
HomeMy WebLinkAboutcompaction test�r'r�. ems, ��- ?�� "? -- d � a 2 PROJECT: PROJECT #: ,3/Q � �9 CLIENT: CONTACT: ARRIVAL TIME: f `��� ON SITE TIME: � EQUIPMENT CHARGE: SCOPE OF FIELD WORK: ..- � DATE: WEATHER: DEPARTURE TIME: '���, TRAVEL TIME: � �� LAB TIME: TRAVEL CHARGE: MILEAGE: GENERAL As requested, a Universal Engineering Technician was present at the above referenced location for the purpose of EARTHWORK As requested, a Universa Engineering Te hnici w 1 nt at the above referenced location for the purpose of Earthwork Testing for the As requested, the t ch ician obs general condition of the areas) to be tested and-{ soil densit est(s). All tests) were performed in accordance with a uclear gau /drive sleeve /sand co nd w e found to (meetJ3n pending proctor) the project compaction requirements of o e maximum dry density pe AST 155 ` / D6 T-180 / T-99) (with the exception of test numbers) that failed to meet the project compacti rf requireme CONCRETE /GROUT /MORTAR As requested, a Universal Engineering Technician (Monitoring /Testing) for the was present at the above referenced location for the purpose of (Concrete /Grout /Mortar) While on site, the technician observed the general condition of the areas) to be tested and cast sets of (cylinders /beams /prisms / cubes) for (compressive /flexural strength) testing. The (concrete /grout /mortar) (tested /observed) on this day was found to be in accordance with the project plans and specifications with regard to batch time, temperature and slump (with the exception of the concrete batch referenced by ticket number ,which was found to exceed tolerance for Universal Engineering Sciences, Inc. 820 Brevard Avenue Rockledge, FL 32955 321.638.0808 phone 321.638.0978 fax ON SITE TIME: LESS #SETS X 1 HR: LESS # IPDS X .25 HR: STAND BY TIME: BILLING: TECHNICIAN: NTACT: