August 11, 2020
ST. LUCIE COUNTY
BOARD OF COUNTY
COMMISSIONERS
JADE Consulting, LLC
208 N. Greeno Road, Suite C
CATHY TOWNSEND
Fairhope, AL 36532
CHAIR
DISTRICT 5
Attention: Paul Marcinko, P.E.
Subject: Site Development Permit
CHRIS DZADOVSKY
Dollar General — Virginia Avenue and S 381h Street
VICE-CHAIRMAN
DISTRICT 1
Ref: PDS # 2020-048
The Construction Plans signed and sealed August 7'h, 2020, are accepted for
SEAN MITCHELL
construction of the site improvements as proposed.
DISTRICT 2
Construction of site improvements is conditioned on the following:
LINDA BARTZ
1. Prior to commencement of any construction of site improvements or access,
DISTRICT 3
the EOR shall coordinate a pre -construction meeting including the St. Lucie
County Public Works representatives, Robert Krip, 772-519-0440,
KripR(a)-stlucieco.org and Nick Linehan, 772-408-7595,
FRANNIE NSON
DISTRHUTICT 4
DISTRICT 4
LinehanN@stiucieco.org.
2. A set of plans stamped as accepted by the County, together with all other
HOWARD TON
applicable permits shall be on site at all times during construction.
COUNTY ADMINISTRATORTII
3. Prior to commencement of work, all other agency permits must be obtained
and followed. The more stringent condition of common or conflicting conditions
shall be met. Discrepancies within the plans shall be appropriately addressed
DAN MCINTYRE
and does not relieve the contractor of his obligation to construct according to
COUNTY ATTORNEY
local, state and federal rules and regulations.
4. Site inspections shall be coordinated as established at the Pre -Construction
MAILING ADDRESS
meeting. Inspections shall be performed at a minimum for the following stages:
2300 VIRGINIA AVENUE
A. Delivery of pipe and structures prior to installation
FORT PIERCE, FL 34982
B. SW structure installations and backfill
C. Subgrade compaction testing and stringline
PHONE
D. Base compaction and stringline
(772) 462-1707
E. Asphalt/paving
F. Final after EOR Certification
TDD
5. Any proposed changes to the permitted stamped plans must be approved by
(772) 462-1428
the County prior to initiating any change in construction. This includes material
changes such as pavement type, type of drainage pipe, etc.
FAX
6. Any structure shown or not shown on the plans (such as walls, gates, signs,
(772) 462-2362
columns, etc.) requiring a building permit, such permit shall be obtained prior
to initiating construction on such structures. This permit does not authorize the
E-MAIL
construction of above ground structures.
GHAMBERSG@STLUC1EC0.0RG
WEBSITE
WWW.STLUCIECO.GOV
ST. LUCIE
Paul Marcinko, P.E.
Dollar General — Virginia Ave & S 38" ST
Pg 2 of 2
7. The Developer/Contractor shall provide a copy of an active FDEP NOI at the pre -construction meeting.
8. The permittee is responsible for administering the construction contract in accordance with this permit.
If the permittee fails to comply with any part of this permit or any other permit issued for this project by
any regulatory authority, the County may at its sole discretion, cause to cease construction activities on
the site until said permit condition is complied with. A Cease and Desist Order will be issued by the
County Administrator or his designee, and served in an appropriate manner to the permittee or the
permittee's agent. Under no circumstances shall work proceed when a Cease and Desist Order has
been issued until said Order has been withdrawn in writing by the County. If a Cease and Desist Order
is issued, the County, at its sole discretion, may take other action against the permittee and the
permittee's agent(s) for the project.
9. Activities approved by this permit shall be conducted in a manner which does not cause pollution or
allow pollution to exit the site. The permittee is solely responsible for preventing pollution caused by
dewatering water and/or stormwater runoff from the construction site or work area. In addition to taking
its own actions and remedies against the permittee for a permit violation, the County may report each
violation to the South Florida Water Management District, Florida Department of Environmental
Protection, Water Control District (or other Florida Statute Chapter 298 Drainage District, as
appropriate), County Code Enforcement, and other pertinent regulatory or enforcement agencies. No
construction work shall begin until the pollution control and treatment system have been constructed in
accordance with approved permits and plans.
10. A copy of the Stormwater Pollution Prevention Plan (SWPPP) must be available on site during
construction. Any necessary change to the SWPPP shall be agreed upon with the County prior to
implementing such change.
11. An `Illicit Discharge Sign' shall be obtained, installed and remain posted continuously during
construction activities. The sign may be obtained from the County Public Works Department at the pre -
construction meeting or by separate arrangement's.
12. An As -Built survey is required along the EOR's certification upon request for a final inspection of the
site and access improvements. A published benchmark utilized for site elevations shall be referenced
for use by other parties, including but not limited to the County.
This permit shall expire as conditioned by the Development Order. Please do not hesitate to contact me at
(772) 462-2741 if you have any questions.