Loading...
HomeMy WebLinkAboutSite Development PermitPUBLIC LIC WORKS DEPARTMENT August 11, 2020 ST. LUCIE COUNTY BOARD OF COUNTY COMMISSIONERS JADE Consulting, LLC 208 N. Greeno Road, Suite C CATHY TOWNSEND Fairhope, AL 36532 CHAIR DISTRICT 5 Attention: Paul Marcinko, P.E. Subject: Site Development Permit CHRIS DZADOVSKY Dollar General — Virginia Avenue and S 381h Street VICE-CHAIRMAN DISTRICT 1 Ref: PDS # 2020-048 The Construction Plans signed and sealed August 7'h, 2020, are accepted for SEAN MITCHELL construction of the site improvements as proposed. DISTRICT 2 Construction of site improvements is conditioned on the following: LINDA BARTZ 1. Prior to commencement of any construction of site improvements or access, DISTRICT 3 the EOR shall coordinate a pre -construction meeting including the St. Lucie County Public Works representatives, Robert Krip, 772-519-0440, KripR(a)-stlucieco.org and Nick Linehan, 772-408-7595, FRANNIE NSON DISTRHUTICT 4 DISTRICT 4 LinehanN@stiucieco.org. 2. A set of plans stamped as accepted by the County, together with all other HOWARD TON applicable permits shall be on site at all times during construction. COUNTY ADMINISTRATORTII 3. Prior to commencement of work, all other agency permits must be obtained and followed. The more stringent condition of common or conflicting conditions shall be met. Discrepancies within the plans shall be appropriately addressed DAN MCINTYRE and does not relieve the contractor of his obligation to construct according to COUNTY ATTORNEY local, state and federal rules and regulations. 4. Site inspections shall be coordinated as established at the Pre -Construction MAILING ADDRESS meeting. Inspections shall be performed at a minimum for the following stages: 2300 VIRGINIA AVENUE A. Delivery of pipe and structures prior to installation FORT PIERCE, FL 34982 B. SW structure installations and backfill C. Subgrade compaction testing and stringline PHONE D. Base compaction and stringline (772) 462-1707 E. Asphalt/paving F. Final after EOR Certification TDD 5. Any proposed changes to the permitted stamped plans must be approved by (772) 462-1428 the County prior to initiating any change in construction. This includes material changes such as pavement type, type of drainage pipe, etc. FAX 6. Any structure shown or not shown on the plans (such as walls, gates, signs, (772) 462-2362 columns, etc.) requiring a building permit, such permit shall be obtained prior to initiating construction on such structures. This permit does not authorize the E-MAIL construction of above ground structures. GHAMBERSG@STLUC1EC0.0RG WEBSITE WWW.STLUCIECO.GOV ST. LUCIE Paul Marcinko, P.E. Dollar General — Virginia Ave & S 38" ST Pg 2 of 2 7. The Developer/Contractor shall provide a copy of an active FDEP NOI at the pre -construction meeting. 8. The permittee is responsible for administering the construction contract in accordance with this permit. If the permittee fails to comply with any part of this permit or any other permit issued for this project by any regulatory authority, the County may at its sole discretion, cause to cease construction activities on the site until said permit condition is complied with. A Cease and Desist Order will be issued by the County Administrator or his designee, and served in an appropriate manner to the permittee or the permittee's agent. Under no circumstances shall work proceed when a Cease and Desist Order has been issued until said Order has been withdrawn in writing by the County. If a Cease and Desist Order is issued, the County, at its sole discretion, may take other action against the permittee and the permittee's agent(s) for the project. 9. Activities approved by this permit shall be conducted in a manner which does not cause pollution or allow pollution to exit the site. The permittee is solely responsible for preventing pollution caused by dewatering water and/or stormwater runoff from the construction site or work area. In addition to taking its own actions and remedies against the permittee for a permit violation, the County may report each violation to the South Florida Water Management District, Florida Department of Environmental Protection, Water Control District (or other Florida Statute Chapter 298 Drainage District, as appropriate), County Code Enforcement, and other pertinent regulatory or enforcement agencies. No construction work shall begin until the pollution control and treatment system have been constructed in accordance with approved permits and plans. 10. A copy of the Stormwater Pollution Prevention Plan (SWPPP) must be available on site during construction. Any necessary change to the SWPPP shall be agreed upon with the County prior to implementing such change. 11. An `Illicit Discharge Sign' shall be obtained, installed and remain posted continuously during construction activities. The sign may be obtained from the County Public Works Department at the pre - construction meeting or by separate arrangement's. 12. An As -Built survey is required along the EOR's certification upon request for a final inspection of the site and access improvements. A published benchmark utilized for site elevations shall be referenced for use by other parties, including but not limited to the County. This permit shall expire as conditioned by the Development Order. Please do not hesitate to contact me at (772) 462-2741 if you have any questions. Sincerely, Grant Cham ers, �',P_E Project Engineer cc: Patrick Dayan, PE David Hays, PE Tahir Curry Robert Krip Lindsay Lankford Aimee Cooper Lydia Galbraith ST. LUCIE