HomeMy WebLinkAboutCOMPACTION TEST.pdfederal eQ.engineering WMO)esting, inc. Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Date: Address: 5110 NW Dunn Road, Fort Pierce, FL 34981 Order #: Area Tested: Building Pad Permit #: Material Type: Light Gray Sand with Some Rock & Shell Tech: Phone: 954-784-2941 E -Fax: 954-784-7875 admin@fed-eng.com www.fed-eng.com -33710 NAMUT'.. . Company Address: Groza Builders, Inc. .r,11 SW Port St. Lucie Blvd. r-) + C+ I rio PI ` AQR l August 7, 2020 20CMT2414 OE Compaction Req.: 95% Proctor Method: ASTM D-1557 Test # I Vl l v. TEST LOCATION Probe Depth Elev. Moist ° �° Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass NW Corner of Building Pad 12" FL 15.4 112.7 113.5 12.0 99.3% Yes 1 1 2 INE Corner of Building Pad 12" FL 17.3 108.1 113.5 12.0 95.2% Yes 3 Center of Building Pad 12" FL 16.7 109.5 113.5 12.0 96.5% Yes 4 ISE Corner of Building Pad 12" FL 16.4 109.8 113.5 12.0 96.7% Yes 5 6 7 8 9 10 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only or, the top 12" of the pad and is nota verification of Soil Bearing Capacity. Legend for Elevation: : PR - Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: SL = Springline FL = Final Lift Keith LeBlanc, P.E. Federal Engineering & Testing, ,ric. SG - Subgrade BG -Below Grade BC = Basecourse BOF = Bottom of Footing Florida Re.g_1Jo. 59394 TOP = Top of Pipe FG = Finished Grade Certificate of Authorization #5471 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clierrts, and authorization for publication, of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the tested laver of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materiai,a below the proposed structure. Th,. results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the unaeriping :.oils will support the p�cposad structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed io avaluL.te the suitabiNy of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be perforrncd on finis work . PAGE 1 of 2