HomeMy WebLinkAboutengineering and test reportProject:Date: Address:Order #: Permit #: Tech: Company: Address:Compaction Req.: Proctor Method: Test # Probe Depth Elev.Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Pass 1 12"FL 11.0 116.3 114.8 11.6 Yes 2 12"FL 14.5 113.0 114.8 11.6 Yes 3 12"FL 13.4 114.0 114.8 11.6 Yes 4 5 6 7 8 9 10 Remarks:See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer Legend for Elevation: PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift SL = Springline FL = Final Lift SG = Subgrade BG = Below Grade BC = Basecourse BOF = Bottom of Footing TOP = Top of Pipe FG = Finished Grade Area Tested:Perimeter Around Pad 2002-0055 Notes:The compaction results were performed within the foundation footprint of this project.The above results meet or exceed the requirements of the FHA Design manual for Compaction along with the current edition of the Florida Building Code. Contractor is responsible to maintain the tested area in the condition that FET completed the indicated passed compaction test.FET is not responsible if the tested area has been altered from the approved inspected condition after test was performed. Field Density Tests of Compacted Soils Method D-6938 Creekside 2; Proposed Residence Lot 58 August 17, 2020 9229 Potomac Drive, Fort Pierce, FL 20DR633 West Side of Perimeter 101.3% Material Type:Brown Sand with Some Rock OE D.R. Horton, Inc. 1430 Culver Drive NE 95% Palm Bay, FL 32907 ASTM D-1557 TEST LOCATION Compaction South Side of Perimeter 98.4% East Side of Perimeter 99.3% This is a Compaction Test only on the top 12" of the pad and is not a verification of Soil Bearing Capacity. As a mutual protection to clients,the public and ourselves,all reports are submitted as the confidential property of clients,and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.A density test determines the degree of compaction of the tested layer of material only.A density does not replace a soil bearing capacity determination.These density tests do not certify the underlying soil materials below the proposed structure.The results do not preclude or guarantee that future settlement and cracking will not occur.A soil boring test is required to certify that the underlying soils will support the proposed structure without settlement.If no soil borings have been performed to verify the underlying soils,we recommend that soil borings be performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. PAGE 1 of 2 Page 2 of 2 Compacted Soils Method D-6938 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side.The purpose of our test was to determine the degree of compaction of the tested layer of material only.In no way shall a compaction test replace a soil bearing capacity determination.A soil boring test must be performed by the client prior to construction to verify subsoil conditions.Our scope of services only included testing the top 12"of added fill material. FET was not contracted to perform supervision of the building pad preparation.This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement.This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material.If no soil borings have been performed in the location of the proposed structure,we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services.If environmental analysis of the soils is required,we can provide a proposal for performing an environmental analysis of the soil materials.The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed.Determination of the pass/fail compaction results are based on current common industry requirements of 95%of the ASTM D-1557 standard for building foundations and 98%of the AASHTO T-180 standard for paved areas such as roadways and parking lots.If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates.Any subsequent site disturbances due to water erosion,rain waters,construction activities,utility or footing excavations,overgrown vegetation,traffic and other disturbances will void this test and the site must be re-compacted and re- tested prior to construction. As a mutual protection to clients,the public and ourselves,all reports are submitted as the confidential property of our client and authorization for use,publication of statements,conclusions or extracts from or regarding our reports is reserved pending our written approval. It has been a pleasure working with you and we look forward to doing so in the near future.