HomeMy WebLinkAboutRevisions OFFICE USE ONLY: J�
DATE FILED: ' '2� PERMIT# 0(0 3 - 0O Qm
REVISION FEE: RECEIPT.#
PLANNING & DEVELOPMENT SERVIC
BUILDING&CODE REGULATION DIVISION RECEIVED
2300 VIRGINIA AVENUE
FORT PIERCE, FL 34982-5652 JUL 7 2�2�
(772)462-1553
ST. Lucie County, Permitting
APPLICATION FOR BUILDING PERMIT REVIS
PROJECT INFORMATION
LOCATION/SITE
ADDRESS:
DETAILED DESCRIPTION OF PROJECT
REVISIONS:,
e=:�V).5) 01, -�-D IG! 00
es )-e.nz
CONTRACTOR INFORMATION:
STATE of FL REG./CERT. #: ST. LUCIE CO CERT. #:
BUSINESS NAME:
QUALIFIERS NAME:
ADDRESS:
CITY: STATE: ZIP:
PHONE(DAYTIME): FAX:
OWNER/BUILDER INFORMATION:
NAME:
ADDRESS: U
CITY: STATE: ZIP:
PHONE(DAYTIME: 4 r C7 FAX:
ARCHITECT/ENGINEER INFORMATION:
NAME: F C F a
ADDRESS:
CITY: STATE: ZIP:
PHONE(DAYTIME): FAX:
SLCCC: 9123109
Revised 06/30/17
HEVIS10a
EXTERIOR RESEARCH & DESIGN, LLC.
Certificate of Authorization #9503
QOTRINITY ERD I 353 Christian Street
Oxford, CT 06478
PHONE: (203) 262-9245
FAX: (203) 262-9243
EVALUATION REPORT
Polyglass USA, Inc. Evaluation Report P9290.02.08
150 Lyon Drive FL1654-112
Fernley, NV 89408 Date of Issuance: 02/11/2008
SCOPE:
This Evaluation Report is issued under Rule 9B-72 and the applicable rules and regulations
governing the use of construction materials in the State of Florida. The documentation submitted
has been reviewed by Robert Nieminen, P.E. for use of the product under the Florida Building Code.
The product described herein has been designed to comply with the 2004 Florida Building Code,
with 2006 Supplements.
DESCRIPTION: Polyglass SBS and APP Modified Bitumen Roof Systems
LABELING: Each unit shall bear labeling in accordance with the requirements the Accredited Quality
Assurance Agency noted herein.
CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s)
changes, the referenced Quality Assurance documentation changes, or provisions of the Code that
relate to the product change. Acceptance of this Evaluation Report by the named client constitutes
agreement to notify Robert Nieminen, P.E. if the product changes or the referenced Quality
Assurance documentation changes. Trinity[ERD requires a complete review of this Evaluation
Report relative to updated Code requirements with each Code Cycle.
ADVERTISEMENT: The Evaluation Report number preceded by the words "Trinity I ERD Evaluated"
may be displayed in advertising literature. If any portion of the Evaluation Report is displayed, then
it shall be done in its entirety.
INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by
the manufacturer or its distributors and shall be available for inspection at the job site at the
request of the Building Official.
This Evaluation Report consists of pages 1 through 4, plus a 26-page Appendix.
Prepared by:
The facsimile seal appearing was authorized
=�% 'w= by Robert Nieminen,P.E.on 02/11/2008
° ~- ��= This does not serve as an electronicallysigned
Robert J.M. Nieminen, P.E. .�` : tc`= , document. Signed,sealed hardcoples have been
Florida Registration No. 59166, Florida DCA ANE1983 transmitted to the Product Approval Administrator and
to the named client
CERTIFICATION OF INDEPENDENCE:
1. Exterior Research & Design, LLC. d/b/a Trinity I ERD does not have, nor does it intend to acquire or will it acquire, a
financial interest in any company manufacturing or distributing products it evaluates.
2. Exterior Research & Design, LLC. d/b/a Trinity I ERD is not owned, operated or controlled by any company
manufacturing or distributing products it evaluates.
3. Robert Nieminen, P.E. does not have nor will acquire, a financial interest in any company manufacturing or distributing
products for which the evaluation reports are being issued.
4. Robert Nieminen, P.E. does not have, nor will acquire, a financial interest in any other entity involved in the approval
process of the product.
FILE COPY
QO
TRINITY ERD
ROOFING SYSTEMS EVALUATION:
1. SCOPE:
Product Category: Roofing
Sub-Category: Modified Bitumen Roof Systems
Compliance Statement: Polyglass SBS and APP Modified Bitumen Roof Systems, as produced by
Polyglass USA, Inc., have demonstrated compliance with the following sections of the Florida Building
Code through testing in accordance with the following Standards. Compliance is subject to the
Installation Requirements and Limitations/ Conditions of Use set forth herein.
2. STANDARDS:
Section Property Standard Year
1504.3.1 Wind FM 4470 1992
1504.7 Impact FM 4470 1992
1505.1 Fire UL790 1997
1507.11.2 Physical Properties ASTM D6163 2000
1507.11.2 Physical Properties ASTM D6164 2000
1507.11.2 Physical Properties ASTM D6222 2000
3. REFERENCES:
Entity Examination Reference Date
FM Approvals FM 4470 2W7A7.AM 08/04/1994
FM Approvals FM 4470 OD3A3.AM 04/04/1997
FM Approvals FM 4470 2DOAO.AM 12/23/1998
FM Approvals FM 4470 2DSA9.AM 06/22/1999
FM Approvals FM 4470 3006646 01/04/2000
FM Approvals FM 4470 3001334 01/25/2000
FM Approvals FM 4470 3001334 02/15/2000
FM Approvals FM 4470 3000857 01/12/2000
FM Approvals FM 4470 3004091 01/12/2000
FM Approvals FM 4470 3006115 05/02/2001
FM Approvals FM 4470 3012321 07/29/2002
FM Approvals FM 4470 -3014692 08/05/2003
FM Approvals FM 4470 3014751 08/27/2003
FM Approvals FM 4470 3007170 O1/13/2004
FM Approvals FM 4470 3019317 06/30/2004
FM Approvals FM 4470 3020703 07/30/2004
FM Approvals FM 4470 3018332 01/31/2006
FM Approvals FM 4470 3023368 03/20/2006
FM Approvals FM 4470 3024594 05/23/2006
FM Approvals FM 4470 3023458 07/18/2006
FM Approvals FM 4470 3030668 09/12/2007
Underwriters Labs Quality Control R14571 Current
Miami-Dade BCCO Physical Properties Various NOAs Various
4. PRODUCT DESCRIPTION:
This Evaluation Report covers Polyglass Modified Bitumen Roof Systems installed in accordance with
Polyglass USA, Inc. published installation instructions and the Limitations / Conditions of Use herein.
The following Polyglass membranes make up the subject systems.
Exterior Research and Design,LLC. Evaluation Report P929O.O2.O8
Certificate of Authorization#9503 FL1654-1112
Date of Issuance:02/11/2008
Page 2 of 4
QOTRINI-rYIERD
Table 1: Roll-Goods for Polyglass Modified Bitumen Roof Systems
Type Product Specification
Reference Grade Type
Base Sheets Polyglass G2 Base ASTM D4601 N/A II
Modibase ASTM D4601 N/A II
Elastobase V S I
Elastoflex V S I
Elastoflex VG G I
Elastoflex VG FR ASTM D6163 G I
Elastoflex SA V S I
Elastoflex SA V Vent S I
Elastoflex SA V FR S I
SBS Membranes Elastobase Poly S I
Elastoflex S6 S I
Elastoflex S6 G G I
Elastoflex S6 G FR ASTM D6164 G I
Elastoshield TS 4 S I
Elastoshield TS 4 FR G I
Elastoflex SA P G I
Elastoflex SA P FR G I
Polyflex S I
Polyflex G G I
Polyflex G FR G I
APP Membranes Polybond ASTM D6222 S I
Polybond G G I
Polyflex SA P G I
Polyflex SA P FR G I
TPO Membranes Xtraflex G FR ASTM D6164 G I
S. LIMITATIONS:
5.1 This Evaluation Report is not for use in HVHZ.
5.2 Refer to a current Roofing Materials Directory for fire ratings of this product.
5.3 For steel deck installations, foam plastic insulation shall be separated from the building interior
in accordance with FBC 2603.4 unless the exceptions stated in FBC 2603.4.1 and 2603.8 apply.
5.4 Unless otherwise noted in Appendix 1, roof decking and its attachment shall be specified and
installed to meet project design criteria to the satisfaction of the AHJ.
5.5 For recover installations, the existing roof shall be examined in accordance with FBC 1510.
5.6 For mechanically attached insulation or membrane or strip-bonded insulation, the maximum
design pressure for the selected assembly shall meet or exceed the Zone 1 design pressure
determined in accordance with FBC Chapter 16. Zones 2 and 3 shall employ an attachment
density designed by a qualified design professional to resist the elevated pressure criteria.
Commonly used methods are PAS 117 and FM LPDS 1-29.
5.7 For fully-adhered insulation, the maximum design pressure for the selected assembly shall
meet or exceed critical design pressure determined in accordance with FBC Chapter 16. No
rational analysis is permitted for these systems
5.8 For mechanically attached insulation or membrane over existing roof decks, fasteners shall be
tested in the existing deck for withdrawal resistance. A qualified design professional shall
review the data for comparison to the minimum requirements for the system. Testing and
analysis shall be in accordance with TAS 105.
Exterior Research and Design,LLC. Evaluation Report P9290.02.08
Certificate of Authorization#9503 FL1654-112
Date of Issuance:02/11/2008
Page 3 of 4
y
�J�
TRINI- Y I ERD
5.9 For bonded insulation or membrane over existing substrates in a re-roof (tear off) or recover
installation, the existing deck or existing roof surface shall be examined for compatibility with
the adhesive to be installed. If any surface conditions exist that bring system performance into
question, field uplift testing in accordance with ASTM E907 or FM LPDS 1-52 shall be conducted
on mock-ups of the proposed new roof assembly.
5.11 For bonded insulation or membrane over existing substrates in a recover installation, the
existing roof system shall be capable of resisting project design pressures on its own merit to
the satisfaction of the AHJ, as documented through field uplift testing in accordance with ASTM
E907 or FM LPDS 1-52.
5.12 All products in the roof assembly shall have quality assurance audit in accordance with the FBC
and F.A.C. Rule 9B-72.
6. INSTALLATION:
6.1 Polyglass Modified Bitumen roof systems shall be installed in accordance with Polyglass USA,
Inc. published installation instructions, subject to the Limitations / Conditions of Use noted
below.
6.2 System attachment requirements for wind load resistance are set forth in Appendix 1.
6.3 Any of the following FBC Approved coatings may be applied to the top roof membrane without
adverse effect on the system wind load performance. Refer to current Roofing Materials
Directory for fire ratings associated with coating usage.
➢ PG200 Non Fibered Roof Coating or Mule-Hide 111 Non-Fibrated Roof Coating;
➢ PG300 Fibered Roof Coating or Mule-Hide 102 Fibrated Roof Coating;
➢ PG600 Non-Fibered Aluminum Roof Coating or Mule-Hide 416 Standard Non-Fibrated Aluminum Roof Coating;
➢ PG650 Fibered Aluminum Roof Coating or Mule-Hide 406 Standard Fibrated Aluminum Roof Coating;
➢ PG700 White Reflective Roof Coating;
➢ PG800 Non-Fibered Asphalt Emulsion Roof Coating or Mule-Hide 311 Emulsion Non-Fibrated;
➢ PG850 Fibered Asphalt Emulsion Roof Coating or Mule-Hide 301 Emulsion Fibrated;
➢ Polyplus 60 Premium Non-Fibered Aluminum Roof Coating or Mule-Hide 410 Premium Non-Fibrated Aluminum
Roof Coating;
➢ Polyplus 65 Premium Fibered Aluminum Roof Coating or Mule-Hide 401 Premium Fibrated Aluminum Roof
Coating;
➢ Polybrite 70 White Elastomeric Roof Coating.
7. BUILDING PERMIT REQUIREMENTS:
As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the
installation of this product.
S. MANUFACTURING PLANTS:
Fernley, NV; Hazelton, PA; Winter Haven, FL
9. QUALITY ASSURANCE ENTITY:
Underwriters Laboratories - QUA1743
- THE 26-PAGES THAT FOLLOW FORM PART OF THIS EVALUATION REPORT-
Exterior Research and Design,LLC. Evaluation Report P9290.02.08
Certificate of Authorization#9503 FL1654-112
Date of Issuance: 02/11/2008
Page 4 of 4
�TRINI-'ry ERD
WIND UPLIFT PERFORMANCE TABLES: The following notes apply to the systems outlined herein:
1. Roof decks shall be in accordance with FBC requirements to the satisfaction of the AHJ. Wind load resistance of the roof deck shall be documented through
proper codified and/or FBC Approval documentation.
2. Insulation/base sheet fasteners shall be of sufficient length for the following deck engagement:
➢ Wood: Minimum 3/4-inch penetration.
➢Steel: Minimum 3/4-inch penetration and engage the top flute of the steel deck.
➢ Concrete: Minimum 1-inch embedment into pilot hole in accordance with fastener manufacturer's published installation instructions.
3. Unless otherwise noted, insulation adhesive application rates are as follows:
➢ Hot asphalt at 20-40 Ibs/square.
➢ Dow Insta-Stik Roofing Adhesive is continuous 3/4 to 1-inch wide beads, 12-inch o.c.
➢ Millennium One Step Foamable Adhesive in continuous 1/2 to 3/4-inch wide beads, 12-inch o.c.
➢OlyBond 500 Adhesive Fastener in continuous 3/4 to 1-inch wide ribbons, 12-inch o.c. using OMG PaceCart of SpotShot dispensing system. Note:
OlyBond 500 Green may be used in any system listing OlyBond 500.
➢TITESET Insulation Adhesive in continuous 21/z-31/2.-inch wide ribbons, 12-inch o.c.
4. For insulations not specifically called-out by tradename, the insulation may be any polyisocyanurate, polystyrene, fiberboard, perlite and/or gypsum-based
insulation board that meets the QA requirements of F.A.C. Rule 9B-72 and is documented as meeting FBC 1505.1 and, for foam plastic, FBC 2603.4.1 or
2603.8,when installed with the roof cover.
5. Bonded polyisocyanurate insulation boards shall be maximum 4 x 4 ft.
6. For mechanically attached or strip-bonded components, the maximum design pressure for the selected assembly shall meet or exceed the Zone 1 design
pressure determined in accordance with FBC Chapter 16, and Zones 2 and 3 shall employ an attachment density designed by a qualified design
professional to resist the elevated pressure criteria.
7. For bonded assemblies, the maximum design pressure for the selected assembly shall meet or exceed critical design pressure determined in accordance
with FBC Chapter 16,and no rational analysis is permitted.
8. For mechanically attached components over existing decks, fasteners shall be tested in the existing deck for withdrawal resistance. A qualified design
professional shall review the data for comparison to the minimum requirements for the system. Testing and analysis shall be in accordance with TAS 105.
9. For existing substrates in a bonded recover installation, the existing roof system shall be capable of resisting project design pressures on its own merit to
the satisfaction of the AHJ, as documented through field uplift testing in accordance with ASTM E907 or FM LPDS 1-52.
10. Unless otherwise noted, all insulation references are flat stock. Tapered polyisocya nu rate may be substituted for flat stock board with the following
Maximum Design Pressure(MDP) limitations:
➢ Insta-Stik Roofing Adhesive: MDP-120.0 psf
➢ OlyBond 500 Adhesive Fastener: MDP-120.0 psf
➢ TITESET Insulation Adhesive: MDP-117.5 psf
Exterior Research and Design,LLC.d/b/a Trinityl ERD Evaluation Report P9290.02.08 for FL1654-R2
Certificate of Authorization#9503 Date of Issuance: 02/11/2008
Prepared by: Robert Nieminen,PE-59166 Appendix 1,Page 1 of 26
TRINITY I ERD
11. Unless otherwise noted, refer to the following references for bonded base, ply or cap sheet applications.
Table 1:Polyglass Roof Covers
Reference Layer Material Application
BP-AA Base Polyglass G2 Base,Modibase
(Base and Ply sheets, Hot asphalt at 20-40
Asphalt-Applied) Ply ASTM D2178,Type IV or VI Ibs/square
SBS-AA Base or Ply Elastobase V,Elastobase Poly,Elastoflex V,Elastoflex S6 Hot asphalt at 20-40
(SBS,Asphalt-Applied) Cap Elastoflex S6,Elastoflex S6 G,Elastoflex S6 G FR,Elastoshield TS4,Elastoshield TS4 FR Ibs/square
SBS-TA Base or Ply Elastoflex V,Elastoflex S6
(SBS,Torch-Applied) Cap Elastoflex V,Elastoflex VG,Elastoflex VG FR, Elastoflex S6,Elastoflex S6 G,Elastoflex S6 G FR, Torch-Applied
Elastoshield TS4,Elastoshield TS4 FR
Base or Ply Elastobase V,Elastobase Poly Polyglass MB2000
SBS-CA Solvent Based Cold
(SBS,Cold-Applied) Cap Elastoflex V,Elastoflex VG,Elastoflex VG FR, Elastoflex S6,Elastoflex S6 G,Elastoflex S6 G FR, Adhesive at lye
Elastoshield TS4,Elastoshield TS4 FR gal/square
SBS-SA <s '""Basew-Ela`stofleic-SA=WElastoflex SA V FR
(SBS,Self-Adhering) Cap Elastoflex SA P,Elastoflex SA P FR Self-Adhering
APP-TA Base or Ply Polyflex,Polybond
(APP,Torch-Applied) n. Torch-Applied
PP ) �=- .Cap_ :_P,okytlex,Polyflex�GP.olyflex G FR,Polybond,Polybond G
APP-SA
(APP,Self-Adhering) Cap Polyflex SA P,Polyflex SA P FR Self-Adhering
TPO-TA
(TPO,Torch-Applied) Cap Xtraflex G FR Torch-Applied
12. Any of the following FBC Approved coatings may be applied to the top roof membrane without adverse effect on the system wind load performance. Refer
to current Roofing Materials Directory for fire ratings associated with coating usage.
➢ PG200 Non Fibered Roof Coating or Mule-Hide 111 Non-Fibrated Roof Coating;
➢ PG300 Fibered Roof Coating or Mule-Hide 102 Fibrated Roof Coating;
➢ PG600 Non-Fibered Aluminum Roof Coating or Mule-Hide 416 Standard Non-Fibrated Aluminum Roof Coating;
➢ PG650 Fibered Aluminum Roof Coating or Mule-Hide 406 Standard Fibrated Aluminum Roof Coating;
➢ PG700 White Reflective Roof Coating;
➢ PG800 Non-Fibered Asphalt Emulsion Roof Coating or Mule-Hide 311 Emulsion Non-Fibrated;
➢ PG850 Fibered Asphalt Emulsion Roof Coating or Mule-Hide 301 Emulsion Fibrated;
➢ Polyplus 60 Premium Non-Fibered Aluminum Roof Coating or Mule-Hide 410 Premium Non-Fibrated Aluminum Roof Coating;
➢ Polyplus 65 Premium Fibered Aluminum Roof Coating or Mule-Hide 401 Premium Fibrated Aluminum Roof Coating;
➢ Polybrite 70 White Elastomeric Roof Coating.
Exterior Research and Design,LLC.d/b/a TrinitylERD Evaluation Report P9290.02.08 for FL1654-R2
Certificate of Authorization#9503 Date of Issuance: 02/11/2008
Prepared by: Robert Nieminen,PE-59166 Appendix 1,Page 2 of 26