Loading...
HomeMy WebLinkAboutHealth Dept, final approvalAPPLICATION #:AP1422494 .� STATE OF FLORIDA PERMIT #:56-SF-1972741 DEPARTMENT OF HEALTH DOCUMENT #: F11467826 ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM rye. CONSTRUCTION INSPECTION AND FINAL APPROVAL DATE PAID:12/19/2019 FEE PAID:25.00 RECEIPT #:56-PID-4252384 APPLICANT: Scott Crippen AGENT: PROPERTY ADDRESS: 24909 Orange Ave Fart Pierce, FL 34945 LOT: BLOCK: SUBDIVISION: ID#: 2112-441-0003-000-6 CHECKED [X] ITEMS ARE NOT IN COMPLIANCE WITH STATUTE OR RULE AND MUST BE CORRECTED. TANK INSTALLATION SETBACKS [ 1 [01] TANK SIZE [11 1250.00 [21 [ ] [271 SURFACE WATER FT [ ] [021 TANK MATERIAL Concrete [ ] [281 DITCHES FT [ 1 (031 OUTLET DEVICE [ 1 [291 PRIVATE WELLS 100 FT [ 1 [041 MULTI -CHAMBERED [LIJ N 1 [ ] [301 PUBLIC WELLS FT [ 1 [051 OUTLET FILTER POIylok PL-68 [ 1 [311 IRRIGATION WELLS FT [ 1 [061 LEGEND 1. 28-015-06DC4 2. [ 1 [321 POTABLE WATER 18 FT [ ] [07] WATERTIGHT [ ] [331 BUILDING FOUNDATIONS 7 FT [ 1 [081 LEVEL [ ] [341 PROPERTY LINES 100 FT [ ] 1091 DEPTH TO LID [ ] [351 OTHER FT DRAINFIELD INSTALLATION FILLED / MOUND SYSTEM [ 1 [101 AREA [11 792.4 [21 SQFT [ 1 [361 DRAINFIELD COVER [ ] [111 DISTRIBUTION BOX HEADER X [ 1 [371 SHOULDERS [ ] [121 NUMBER OF DRAINLINES 1. 7.00 2. [ ] [381 SLOPES [ 1 [131 DRAINLINE SEPARATION [ 1 [391 STABILIZATION 08/18/2020 [ ] [141 DRAINLINE SLOPE [ 1 1151 DEPTH OF COVER ADDITIONAL INFORMATION [ ] [161 ELEVATION [ ABOVE / BELOW ]BM 31.00 [ 1 [401 UNOBSTRUCTED AREA [ 1 [171 SYSTEM LOCATION [ ] [41] STORMWATER RUNOFF [ ] [181 DOSING PUMPS [ 1 [421 ALARMS [ 1 1191 AGGREGATE SIZE [ ] [431 MAINTENANCE AGREEMENT [ 1 [201 AGGREGATE EXCESSIVE FINES [ 1 [441 BUILDING AREA [ ] [211 AGGREGATE DEPTH [ 1 1451 LOCATION CONFORMS WITH SITE PLAN FILL / EXCAVATION MATERIAL [ 1 [461 FINAL SITE GRADING [ 1 (221 FILL AMOUNT [ ] [471 CONTRACTOR MICHAEL W STUHR(ASHTO [ 1 [231 FILL TEXTURE [ ] 1481 OTHER INFILTRATOR Quick4 Plus EQ36 LP [ ] [241 EXCAVATION DEPTH ABANDONMENT [ 1 [251 AREA REPLACED [ ] [491 TANK PUMPED [ ] (261 REPLACEMENT MATERIAL [ 1 [501 TANK CRUSHED & FILLED Comments: Comments are on page 2. / / �- St. Lucie CHD DATE: 06/22/2020 CONSTRUCTION [ APPROVED DISAPPROVED )' Enviro rental Specialist n J Ingram (ENVIRONMENTAL HEALTH) FINAL SYSTEM [ APPROVED / DISAPPROVED ]: "`— St. Lucie CHD DATE: 08/18/2020 Environmental SpecialBrian J Ingram (ENVIRONMENTAL HEALTH) (Explanation of Violations on £oll oxi ng page) DH 4016, 08/09 (Obsoletes all previous editions which may not be used) Incorporated: 64E-6.003, PAC Page 2 of 3 EH Database v 1.0.1 AP14PY499 EID1972741 APPLICATION #:AP1422494 STATE OF FLORIDA PERMIT #:56-SF-1972741 b DEPARTMENT OF HEALTH #:FI1467826 c 't' ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM DOCUMENT CONSTRUCTION INSPECTION AND FINAL APPROVAL DATE PAID:12/19/2019 FEE PAID:25.00 RECEIPT #:56-PID-4252384 Violation Number Comment Comments The system is sized for 3 bedrooms with a maximum occupancy of 6 persons (2 per bedroom), for a total estimated flow of 460 gpd. New ST, filter, and 7x10 long BED DF installed. No violations, system ok to cover. Contractor notifed by phone. Needs final inspection for mound system and final site grading. Final system approved. Contractor and building department emailed final approval. DH 4016, 08/09 (Obsoletes all previous editions which may not be used) Incorporated: 64E-6.003, PAC Page 2 of 3 EH Database v 1.0.1 AP1422494 E101972741