HomeMy WebLinkAboutEnginerred Letter M L Engineering Inc.
2030—37111 Avenue
Vero Beach,Florida 32960
Phone: (772)569-1257
Fax:(772)569-4041
July 13,2020 / � o f
St.Lucie County Building Department
Planning&Development Services
2300 Virginia Avenue
Ft.Pierce,Florida 34982
RE: Ocean Harbor South Condominiums—Concrete Repairs
Unit 916
4200 North Highway AlA
Ft. Pierce,FL 34949
Engineer's Project No.:20-161
St. Lucie County Bldg. Permit No. 2006-0134 - - - - -
To Whom It May Concern:
This letter shall serve as certification that to the best of our knowledge,the structural repairs have been
constructed in substantial conformance with the design documents and specifications and as duly noted in
our field reports.
Threshold Inspections for the above referenced project were performed from July 2,2020 through July
13, 2020. Copies of all field reports were distributed to the Client,Engineer of Record, Contractor and to
the St. Lucie County Building Department.
If you have any.questions,please call our office.
Respectfully,
•
•
Michael Lue,P.tosiv i still'
Consulting Engineer
Threshold Inspector
Cc: Gene Ross—Elliott Merrill Community Management(Client)
Bob Stark—Structure-Con(Contractor)
M L Engineering Inco Project No. 20-161 Report No. 2
Consulting Engineers Project Manager: Mr.Gene Ross—Elliott Merrill Community Mgmnt.
Threshold Inspector Building Official: St.Lucie County Bldg.Dept.
2030 371 Avenue Contractor: Mr.Robert Stark—Structure-Con
Vero Beach,Florida 32960 Mr.Khris McConnel—Structure Con
Phone: (772)569-1257 File
Fax: (772)569-4041
www.mlenizineerinizinc.co
THRESHOLD INSPECTION REPORT
OCEAN HARBOR SOUTH CONDOMINIUMS—UNIT 916 CONCRETE REPAIRS
4200 N.HWY.AIA,FT.PIERCE,FL 34949
SLC BUILDING PERMIT NUMBER:2006-0134
PROJECT NAME: Ocean Harbor N.Condos—Bldg.D DATE: July 13,2020
Concrete Repairs
CLIENT: Elliott Merrill Community Management LOCATION: Ft.Pierce,FL
CONTRACTOR: Structure-Con PROJECT MGR: Mr.Khris McConnell
INSPECTED BY:' Todd Rhoten WEATHER: Sunny
— - WORK INSPECTED:
Unit 916—Post pour—Final Inspection
OBSERVATIONS:
• Balcony repair areas and deck have had an approved waterproofing applied.
• Repaired areas have been painted to match surrounding areas.
• Sliding glass door bottom track has been sealed inside and out.
All work complies with the design and permit documents and a final letter will be issued following this report.
Q' G — Q • �
Miclel�jug;-P. : Todd Rhoten
�'•: FSS I ON P°°+�
Page 1 of 2
M L Engineering Banco Project No. 20-161 Report No. 2
Consulting Engineers Project Manager: Mr.Gene Ross—Elliott Merrill Community Mgmnt.
Threshold Inspector Building Official: St.Lucie County Bldg,Dept.
2030 371 Avenue Contractor: Mr.Robert Stark—Structure-Con
Vero Beach,Florida 32960 Mr.Khris McConnel—Structure Con
Phone: (772)569-1257 File
Fax: (772)569-4041
www.mlengineerinainc.com
Pic 1
Unit 916
Repaired area
i
q III pe
i r
i# i Ill
i
a
v` 7t7Pic 2
Unit 916
WZ
Sliding glass door track sealed.
k .
rP�, v
"tyyta�tl,.,ra�.«C,
Page 2.of 2
M L Engineering Inc. Project No. 20-161 Report No. 1
Consulting Engineers Project Manager: Mr.Gene Ross—Elliott Merrill Community Mgmnt.
Threshold Inspector Building Official: St.Lucie County Bldg.Dept.
2030 371 Avenue Contractor: Mr.Robert Stark—Structure-Con
Vero Beach,Florida 32960 Mr.Khris McConnel—Structure Con
Phone: (772)569-1257 File
Fax: (772)569-4041
www.mlengineerinizinc.com
THRESHOLD INSPECTION REPORT
OCEAN HARBOR SOUTH CONDOMINIUMS—UNIT 916 CONCRETE REPAIRS
4200 N.HWY.AlA,FT.PIERCE,FL 34949
SLC BUILDING PERMIT NUMBER:2006-0134
PROJECT NAME: Ocean Harbor N.Condos—Bldg.D DATE: July 2,2020
Concrete Repairs
CLIENT: Elliott Merrill Community Management LOCATION: Ft.Pierce,FL
CONTRACTOR: Structure-Con PROJECT MGR: Mr.Khris McConnell
INSPECTED BY: Todd Rhoten WEATHER: Sunny
WORK INSPECTED:-
Unit 91.6—Concrete demo/pre-pour inspection.
OBSERVATIONS:
• All loose concrete has been chipped and corroded reinforcing bars have been exposed.
a (3)#4 existing top reinforcing bars under the sliding glass door track are heavily corroded.
• The surface spall area is approximately 3'-6"x 4'-05'.
• (3)new#4 top bars x 4'-0"have been wire tied to the'existing bars.
Repairs are in accordance with design documents and approved for concrete pour.
Concrete pour is scheduled for Thursday,July 3,2020 @ 9am.
NTH 01 y'�s
o �
NEC e 1%,P.E. g:�®��?� ToddRhoten
��''•+'cFS
S1
Page 1 of 2
M L Engineering Inc. Project leo. 20-161 Report No. I
Consulting Engineers Project Manager: Mr.Gene Ross—Elliott Merrill Community Mgmnt.
Threshold Inspector Building Official: St.Lucie County Bldg.Dept.
2030 371'Avenue Contractor: Mr.Robert Stark—Structure-Con
Vero Beach,Florida 32960 Mr.Khris McConnel—Structure Con
Phone: (772)569-1257 File
Fax: (772)569-4041
www.mlengineerin2inc.co
Pic 1
Unit 916
Spalling area at exterior balcony.
y ^L+ y
Tr
� .a r h��'•3�` y i�s.`e.�"� '�.r'tet�`.^.,a"`� .
Plc 2
i Unit 916
=' l Spalling area at interior of unit.
tt
Page 2 of 2