HomeMy WebLinkAboutProduct Review; Skirting07/28/=O14 -M-OZ
A I i Ventilation:
us SKIR Center Vent 8.4 sq. in./ft. Df panel
Available Colo S
Solid! Pane .040
•'j Cen4r-Ven Panel .040" M White
Grey
q
Top Or nt 'm .0595"
I Tan
To
.,05911:
im Clay
Back Ti
Sand
Bottoiv. Trim
.047.
nfilation:*
EALLI
Centel Vent 4.9 sq. in./ft. of pan6l GI
�d
L]
inyl Skirting
Avai able Colors §35" olld Panel
White nted Panel 35
Grey 0"
ap front Ti1m
Tan
Clay v op Back Trim ..)48"
Sand Bottom Trim j4O"
Trim kit.' Co parleion: Pre, MILM Plus
Eagle
rill ()59" .050d NOTE- Top Back trim fOt
Front Rail
Back Oaii 04W Premium P and Eagle
aolte)H CNnn .04711 ,pop" Trim Kite.ar the Same
Top Front Trim, idth 4.7?5" 4.360M
pp dimensions'
er "
U .55011
3 because it il HEAVIER;
The rel ks6n m4 installers use Premiuin PIdp Trim Kits with Eagle Panel 1, blow-out,
in areas where blow-out is a, proble M', P 1MIUM PIU6 offers more rigid protection ao�inst
r9
CAP%
90/60 3Jdd 10d3a 3WOH j'lIBCIW 08/-9z9tPE98 90:18 P107,/GZ/40
STEP A:
A'r MH BACK ILL
1. Determine a place for mounting. PIace bottom edge of back rail
just below bottom edge of the home. This location must offer solid
support for attaching and wind load pressure for panels and ads.
2. Deep the bank rail straight and level" Snap a chant lane around the
home to guide the top edge of the back rail.
3. Correct setewing or nailing method fox back rail: Start on the back
side of the home. Position screws or nails in the center of the slot.
Screw/nail to allow £or a clearance of 1116" from the back rail
surface. Note: avoid tightly screwing or nailing back rail. A I/16"
cleatance allows for normal expansion and contraction with
temperature change. Place a screw or "nail in every other slot.
4. Provide a 1/2" gap between each back rail section far normal
thermal expansion.
To install around comer, refer to Step E.
PASO A.
INSTag EL RIEL DE APOYQ
1. Determine un lugar pars el montaje Coloque el borde inferior del
riel de apoyo justo abajo del borde inferior do la casa. Esta
ubicado'n debt ofrecer on apoyo firrne que permita cjavar Jos yk6
y soportar Is presida por cargm de viento en los paneles.
2. Mantenga derecho el riel de soporte y a nivei. Marque una linea
con el cordel entizado drededor de la casa pars Oat el borde
superior del del de apoyo.
3. M6todo corxecto pars clavar el rid de apoyo: Comience en la parte
posterior de la casa. Coloque los elms era el contra de la sacrum
Pam davos. Inteaduzca los clavos y deje una holgura de 1/16" desde
is superlicie del riel de apoyo. Nota: No clave muy ajustadamente
el riel de apoyo. Una holgura de 1116" con. Is cabeza del elm
permitixi ej espacio suaciente pars absorber la expansion y
aontracc:Wn normales resuhantes de los cambios de tcmperatura.
Coloque los clavas on ranurse altemas.
4. Deje un espacio de la' entre cada semi6tt de del de apoyo pars
terser en cuenta la expansion termica normal.
Para instalar el producto almdedor de ]as esquinas, consulte e1 peso E.
STEP B:
MOUNT BMW RAIL.
1. Ground preparation. Prepare the ground so that it is smooth, free
of loose clumps, clods or protruding obstacles. Guard against
uneven settling of newly excavated ground by mounting the
bottom rail on treated (2"ar2") lumber.
2. Mark the ground location directly below the outside, bottom edge
of the home. Use a level or plumb bob to determine this location
at each corner.
3. Snap a chalk line or stretch a ttylon string between each corner to
guide the bottom rail.
4. Position the bottom rail with the back leg toward the inside of the
chalk line perimeter.
5. Drive ground spikes every 19 inches. Two sets ofholes are provided
isi the bottom rail. They are located inside the channel, and on the
back leg. Ground spikes may be driven in either hole at intervals of
19 inches.
6. Installation on concrete. Use a 3M' masonry nail. You may also
drill a hole for a 3/16" molly screw and plastic sleeve. (Nail and
screw materials are available at most hardware stores.)
To install around corner, refer to Step E.
PASO Bi
MONTAR DEL RIEL INFERIOR
1. Preparaci6a del piso de sierra. Prepare el piso de mantra que est6
uniforme, sin rotas sueltas, tcrronee ni obadculos que sobresalgan
del piso. Proteja la instalacl6n contra d asentamiento no un6 me
eapisos redin cxccavados, montando e1 del inferior en unapieza de
madera tratada (2" x 2").
2. Marque It ubicaci6n en el piso directamente abajo del horde
inferior externo de la casa. Use un nivel o una plomsda pars
deterrWnar esta ubicad6n en cada esquina.
3, Marque una linea con el cordel entiaado o cloque una cuerda de
ad entre cads eso= pare Oar eI Ael de apoyo.
4. Coloque d Yield* apoyo conra pats de xespaldo hacla el inter'rordel
pesimetxo marcado par la Linea de tiza.
S. Intxoduma los davos gmesos en cl piso a coda 19 putgadas. En el
0201-4 Ii0�01011T.01PI01�i J.RT.—.i. f PIJ:� —FAR—IdId —T, amr z,4/�r U T�6�—Wfl€Td i ; fi01 T, !.0—T.01
riel inferior se proporcionan dos conjuntos de agujeros. lstos se
encuentran deotro del canal, en la pata de soporte. Los claws
gruesos para el piso se pueden clavar a travel de cudgWera de los
agujews a una distancia de 19 pAndas entre si:
6. xnstalaciba on pisos de concreto. Use un claw de 3/4" paura
mamposteda. As€ mismo se puede taladrar un agujero pare un
tomillo de 3/16" tipo Molly cots ands. plestlea. (Los matcriales de
davos y los tomillos estan disponibles en la mayo& de las
fWetedas), 1.
Para instalar el producto alrededor do las esquinas, consulte el Rhsp E,
STEP Q
PMAL INSTALLATION
1, Beginning N away £tom the lowest.coraer of the home, measure
from the ground up to 1-1/2" above the bottom edge of the back
rail. (If the temperature is below 407, with frozen ground, measure
to 3" above the back rail edge.) .
2. Mcmurcments on sloping ground should be taken every 16" (width
of panel).
3. Cut the bottom of each panel to angle with the ground, Each cut
panel section should align 9T to the bottom edge of the home. Use
aviation snips or a power saw (with a fine toothed saw blade turned
backwards) for cutting.
4. Punch lock tabs every 4" alorig the top and bottom edge of cut
panel sections (or outside portion of each panel face for 13"
Vari$est). A• Malco (SL-8) Snap Lock Punch tool is
recommended. Consult your sldlrting supplier for obtaining this
tool. Tabs are to be positioned outward to catch on the hooped
edge of the rails.
5. Interlock panels and insert ixtto the bottoms rail. Begin with the
first panel inserted into the bottom. rail, Lock tabs should snap past
the hooked edge of the bottom rail. Insert next panel section into
the interlock hooks along the vertical edge of the panels. Seat each
panel securely into the bottom rail. Repeat interlocking parcels,
forming about a 12-foot section. Resume panel cut end interlock
method,
To install around corner, refer to Step E.
PASO Q
wrALAi ift Do Los P uls
1. Comexmdo a 24" de la esquina inferior nib baja de la Casa, mida
desde la superficle del piso haste 11/2" attiba del horde lnfexior del
riel de apoyo. (Si Is temmperatura ambiente durance la instaiad6a es
inferior a tos 40T y el piso estd congelado, mida hasta 3" wriba del
horde del riel de a").
2. Los me&ouea en pleos con desnivel deben home a cads le'
(ancho del panel).
3. Corte la parte inferior de cada panel en angulo aegn el desnivel del
piso. Cada seccidn de panel corrado debe altar a escuadra (9(°) con
el borde inferior de Is can, Use tijeras de hojalatem o una eieau
eUctrica (con una hoja de carte de diente ftno colocada al reves)
para eortae too ponies.
4. Perfore In lengtietas de cierre cads 4" a to largo del horde superior
e inferior de Ras seeciones de paneles cortados. Se recomieuda el use
de una punzonado mano Mateo (SL-8) Snap Lock Punch.
Consulte con su or�cenefas sobve c6mo obtener esta
herramientu. Las leng,etas n' c�g ha& afuera a fin de
poder engattchar el horde do ga 6o t u n �.
IMITITMTOM15TIU._r.rnUl 70'CfA CT.-IM—TM
I
j. Bnganche tos panclts t introddZealos en el rid inferior,
Comience con el pruner panel introduddo en el fie!
inferior. Las leng,etss de tierce deben enganchwe hasta
mks alit del borde con gancho del riel de apoyo. Introduzca
la siguientc secci6n de panel en los gauchos do
enciawniento 110 large del borde vertical de 105 panties.
Asiente cads, panel futnements eta el riel infeaiot Rep14 e1
enclavamiento de los pantiles hasta format urta.secd6n de
apcoxmadmento 12 pies. Reanude cl Corte de los pantiles y
el m&odo de enclavamuento.
Para instalar el produeto en lag esquinas, conwke el peso E.
SUP Di
INTERLOCK FRONT RAIL
VdTH BACK RAIL
1. Stair saapong one end of the front top rail into the back
top rail, creating the interlock. Push the firont top rail
upward, its entire length until the front top rail is
completely mmlocked u►ith the back rail.
2. Overlap 1" each; top fail sectwn.
To install around coiner, refer to Step B,
PASO Di
EI lAVAlIr1IVM DES, RIEL
FROM'AL CON EL RIEL DIE APOYO
1. Comience engan«chando an extremo del rieI frontal superior
en el riel superior de apoyo, pare formar el mecaoismo de
enclavarniento. Empule el ricl superior de apayo hacia
ar:iba en rode su longitud hasta que el riel frontal superior
este complammente enganchado en el del de apoyo.
2. Traslape 17 cada seceik delxael superior,
Para insts u el producto On, lag esquirtas, consulte el peso F.
MP E: ��
comm vat A a Tn
1. Top back rail — Make a 1" vetnc� from the
Notch
1rAujock hook should be completril' cut
4r° on bottom =Ved leg•
2. Bottom xail — Notch. the back portion with snips, ss
illusmted. Bend around a eor= and attach to the ground.
3. pmels — C>.tt panel to proper height. D terj�iue point of
corner bend; bend over a table edge, forming a uniform
angle.
4. TOPISaxtrail—igotch at both the top and bottom hooks of
the front rail, as ;Mustrated, Bend around the corner and fit
into the interlock with the top back rai L Refer to Step D.
FOUR pR"O CHED TOP FRONT
RAILS ARE 1MCWD91D IN TRIM PAL
PAS� *DEL I'IiOD�fC•�
INSTALA
ED ESQUINAS
1. fuel superior de apor — l#aga un torte vertical de 1" desdh:
Ia pane superior. El gaucho superior de enclavamlento dcbi:
cor arse ccmpletamefxte. Hvga una muesca a 4S° en Is pate
cuuvada inferior.
2. P" inferior — Corte la pomi.6n posterior djeras de
hojalatero segun Be muestm en la ilustratuin. DOW&
alrededor de una esquiaay clavelo aI pim.
3. pantiles — Carte el panel a Ia altura ap>opiads, Determine el
punto de doblez doble of panel sobrc tit barde de una mesa,
para former un recto.
&. Riel fiootal superior —Corte los ganchos superior a inferior
del rid frontal, segttx se oustra en is fipa; Doge la pieta
airededor de la esquina y wgbcheia en el eo l wamiento
con el riel superior de apoyo-
Consulm el paso D.
IN EL COIJU NTOTRIM PAK SE
INCLUYEH WASRO R1EL,ES
SUPERIORES FRONIALES YA
COKiA O&
CIO
___ .....,, I AY T en i c—cco—MMO—T allITJ410TILMTIV-IJOR-4 22 :60 6L i-LO—Z0