Re: FPL Roof Replacement: 353 US-1, Port St. Lucie, Florida 34952
SCOPE OF WORK
Provide labor, material, equipment and supervision necessary to install a new SBS roof system on the
above referenced project as follows:
1. Provide ground protection. .
2. Remove and dispose of the existing insulation and coal tar pitch roof system.
3. Install new 2"x 6"PT wood blocking where new eaves drip will be installed.
4. Install one (1) new layer of 1.5"Polyisocyanurate roof insulation using Foam adhesive.
5. Install one (1)new layer of primed dens deck roof insulation using Foam adhesive.
6. Install one(1) new ply of GAF Heat Weld 25 per Manufacturer's specifications and/or
recommendations.
7. Install new lead flashing on all soil stack vents.
8. Install one (1) new ply of GAF Ruberoid Heat Weld Plus FR per Manufacturer's specifications
and/or recommendations.
9. Install white ceramic granules to all asphalt bleed out.
10. Install new aluminum drip edge and fascia.
11. Remove and dispose of any related roofing debris from roof and premises.
12. Provide owner with a Five(5)year labor and materials Contractor's guarantee. SEE BELOW
OPTION FOR NDL MANUFACTURER"S GUARANTEE.
Exclusions: Engineering(if necessary), roofing permits, structural, plumbing and any other item not
specified above.
Complete labor and material..........................................................$14,523.00
(Fourteen thousand, five hundred and twenty three dollars)
Guarantee Option: Provide owner with a Twenty (20)year No Dollar Limit Labor and Materials
Manufacturer's guarantee and a Two (2)years Contractor's guarantee. If owner would like to obtain this
kind of roof guarantee please ADD $ 1,000.00 to the contract amount.
3
Terms of Payment shall be: 100%Upon Completion.
Any alteration or deviation from the above specifications involving extra cost of labor or material will only be executed upon written orders for
same and will become an extra charge over the sum stated in this contract. All agreements must be made in writing according to the
Conditions of Contract. Infinity Roofing and Sheet Metal, Inc. shall carry all workers compensation and liability insurance and shall also
provide all licenses and permits necessary to complete this job.
Infinity11!!
Metal, Inc.
John Mit
--ACCEPTANCE—
You are hereby authorized to furnish all materials and labor required to complete the work specified in
the above proposal, for which the undersigned agrees to pay the amount stated in said proposal, and
according to the terms thereof.
(date)
4
r
View Work Order Detail - 5907548
Work..Order Location
Campus: Prima Vista Substation Building: 6375 US Hwy. 1 - Prima
Vista Substation
Floor: Roof Room: Roof
Location within: Location 561-371-7679
Phone:
User Defined 2: 4452-BASE
Important Dates
Entered 5/29/2020 10:05:54 AM Response 6/9/2020 10:05:00 AM EST
EST Target:
Next Arrival.:, Completed:
General Information
P9 1 business month (23
Priority work days):: Status: D - Dispatched
- Com an
Requested;By ;Steve Vitaeolonna Covered: Yes
Est. Service
Contact Name: Cost: 500.00 USD
Service Florida Power and Light
Contact Phone: Center: Facilities Help Desk
Roof- Repairs or
Replace:Please proceed
with replacement of roof
Problem per quote dated 5%18/2020 Completion
for a total of-$14,523.00
Description: please coordinate with Description:
Kurt Jansen to let him
know him you will be on
site.772-595-1229
Cost Center: Invoice: No Invoice
Facility Facility
Manager: Steve Vitacolonna Manager 561-371-7679
Phone #:
Assignment
Type: Vendor
Number: 10002/0
Name: Infinity Roofing and Sheet Metal Inc.
r
ROOF ASSEMBLIES AND ROOFTOP STRUCTURES
SECTION 1525
HIGH-VELOCITY HURRICANE ZONES - UNIFORM PERMIT APPLICATION
Florida Building Code 6th Edition (2017)
High-Velocity Hurricane Zone Uniform Permit Application Form.
INSTRUCTION PAGE
COMPLETE THE NECESSARY SECTIONS OF
THE UNIFORM ROOFING PERMIT
APPLICATION FORM AND ATTACH THE
REQUIRED DOCUMENTS AS NOTED BELOW:
Roof System Required Sections of the Attachments Required
Permit Application Form See List Below
Low Slope Application A,B,C 1,2,3,4,5,6,7
Prescriptive BUR-RAS 150 A,B,C 4,5,6,7
Asphaltic Shingles A,B,D 1,2,4,5,6,7
Concrete or Clay Tile A,B,D,E 1,2,3,4,5,6,7
Metal Roofs A,B,D 1,2,3,4,5,6,7
Wood Shingles and Shakes A,B,D 1,2,4,5,6,7
Other I As Applicable 1,2,3,4,5,6,7
it
i
ATTACHMENTS REQUIRED:
1. Fire Directory Listing Page
2. From Product Approval:
Front Page
Specific System Description
Specific System Limitations
General Limitations
Applicable Detail Drawings
3. Design Calculations per Chapter 16,or If Applicable,RAS 127 or RAS
128
4. Other Component of Product Approval
5. Municipal Permit Application
6. Owners Notification for Roofing Considerations(Reroofing Only)
7. 1 Any Required Roof Testing/Calculation Documentation
FLORIDA BUILDING CODE 6th Edition (2017)—BUILDING 5.31
ROOF ASSEMBLIES AND ROOFTOP STRUCTURES
Florida Building Code 6th Edition (2017)
High-Velocity Hurricane Zone Uniform Permit Application Form.
Section A (General Information)
Master Permit No. Process No.
Contractor's Name Infinity Roofing&Sheet Metal Inc.
,lob Address 6375 S US Highway 1 Saint Lucie,FL 33477
ROOF CATEGORY
El Low Slope ❑ Mechanically Fastened Tile ❑ Mortar/Adhesive Set Tile
❑Asphaltic Shingles ❑ Metal Panel/Shingles ❑ Wood Shingles/Shakes
❑ Prescriptive BUR-RAS 150
ROOF TYPE
Il New Roof 13 Repair is Maintenance 0 Reroofing 0 Recovering
ROOF SYSTEM
INFORMATION
Low Slope Roof Area(SF) 800 Steep Sloped Roof Area(SF) 0 Total(SF) 800
Section B (Roof Plan)
Sketch Roof Plan:Illustrate all levels and sections,roof drains,scuppers,overflow scuppers and overflow drains.
Include dimensions of sections and levels,clearly identify dimensions of elevated pressure zones and location of
parapets.
PIC se See Atiact ed Rodf Plan
15.32 FLORIDA BUILDING CODE 6th Edition (2017) —BUILDING
c