Loading...
HomeMy WebLinkAboutChecklist6.. r BOARD OF PLANNING & DEVELOPMEN.T COUNTY COU SERVICES DEPARTMENT COMMISSIONERS • R I . A Building & Code -Regulation CHECKLIST FOR RESIDENTIAL/COMMERCIAL BUILDING PERMIT Proiect Location: Date: 11 &0 1-1 Permit Number: \ °1 1 1- Li 1 Technician: Required Documents: Application completely filled out with Notarized Signatures ............................ Yes'�(_No N/A Sub Agreements with Notarized Signatures (prior to issuance) ........................... Yes No N/A Owner / Builder Affidavit (signed in office) ............................:..................... YesXNo N/A Filled Land Affidavit (prior to issuance) ................................................... Yes No N/A Recorded Warranty Deed, if applicable ......................................................Yes No N/A Recorded Notice of Commencement (prior to issuance or inspection) ................. Yes No — N/A Utility Agreement or Payment Receipt (prior to issuance)..................................Yes No N/A Vegetation Removal Application with copy of survey.....................................Yes No N/A Plans. Calculations & Attachment ( 3 copies commercial, 2 copies residential) Complete set of plans with Engineer / Architect Raised Seal ........................... Yes N N/A Truss Plans reviewed and approved by Engineer / Architect ............................ Yes —No —N/A Landscaping and Parking plan (under 6,000 sgft)......................................... Yes No N/A ApprovedSite Plans........................................................................... Yes —No —N/A Sealed Survey with Dimensions, Finished floor ........................................... Yes_X_No N/A Elevations and Setbacks............................................................... Yes No N/A Plotplan with Setbacks............................................................... Yes No N/A 9. Ily Health,Department approval stamped on survey and floor plan ........................ Yes —N/A —No Health Department Food Establishment Permit stamped on floor plan ................ Yes —N/A —No Manual "J" or Manual "N" Calculations.................................................... Yes No N/A Signed Energy Calculations (1 set original signatures & signed in 2 spots) ........... .Yes —N/A —No Sealed Wind Load Compliance Certification ..........................................:.... Yes —N/A —No Product Review Affidavit..................................................................... Yes —No —N/A Excavating a pond for fill: Site plan showing 25-foot(minimum) set back from all property boundaries, size, Yes No_ N/A shape, location and quantities of proposed excavation and fill areas. Side slopes not to exceed 4 to 1 to a minimum of 3 feet below water level......... Yes No_ N/A Depth of excavation does not exceed 12 feet in depth .................................... Yes No N/A If Hauling fill off site (excess of 100 cubic yards) you must have a mining permit Yes_ No_ N/A Other: Health Department Permit Paperwork....................................................... Yes No N/A' CD for Fire Department if commercial or multi -family .................................... Yes —No —N/A DEP, SFWMD or Army Corp of Engineers (dock, seawall, SF on beach)............ Yes —No —N/A Pool Barrier Affidavit.......................................................................... esNoN/Ar Yes—No—N/A' Ground Sign Landscape Affidavit (signs) ................................................... Yes No N/A Burn Rate for Sign Cabinets .................................................. :................. Yes ' No N/A