HomeMy WebLinkAboutApproved plans remove CONTRACTOR® C PY
607-��
9
existing shower remove
AVlWED FOR
ODE COMPLIANCE
ST. ' CIE COUNTY
SO= g'u)jz6
= Non-load bearing partitions
to be removed
existing
toilet remove
Existing Floor Plan
Z group 772.546.7669
desig & remodeling Kunnath O'Hara/n
Master Bath Renovation
GFI GFI Scope of Work:
„
' 1-Remove all file,fixtures,cabinets and tops
d 2-Remove noted non-load bearing partition
vanr 3-Relocate plumbing to accommodate new floor plan
and cap plumbing as necessaty
4-Frame new non-load bearing partitions as noted
N j 5-Install new lighting fixtures as noted
6-Install new file backer in shower,lower curb and
1 reconfigure shower for seat
`•~ ~'• 7-Install new non-skid tile on bathroom and shower floor
•• % 8-Install new tile in shower
9-Install new cabinets as per plans
``• ,.'f 10-Supply and install new counter tops
\� 11-Add new frameless glass above short shower wall
�• 12-Repair drywall as necessary and paint walls and
ceiling
toilet � J
•\ %I linen Pro osed Floor Plan
closet CONTRACTOR COPY
563/4 REVIEWED FOR
32 E COMPLIANCE
ST. LUCIE COUNTY
BOCC
Z group 772.546.7669
design & remodeling Kunnath O'Hara
Master Bath Renovation
f;ONTRACTOR COPY
REVIEWED FOR
,t :'.`#"O®E COMPLIANCE
ST. LUCIE��/COUNTY
B/\/iN M T
clout
toilet shower
• 3tt ----._�. �.__4"concrete 1/4 x 5 tepcons drilled 2 1/2'Into 211
ex s n8 concrete every 8" �1/2
—.— 5 mlI vapor barrier A It I
nretreet soli � , `t 211 sink
Note:exact layout cannot
Trench Repair Detail be determine until
N.T.S O
plumbing is exposed \ Sq
q
Proposed Plumbing Riser
N.T.S
group 772.546.7669 Kunnath/O'Hara
Z Master Bath Renovation
design & remodeling