HomeMy WebLinkAboutWS-LOT-50 ENERGY CALC-5Envelope Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performance or ERI Method Compliance
2017 Florida Building Code, Energy Conservation, 6th Edition
Jurisdiction: Permit #:
Job Information
Builder: K. HOVNANIAN Community: Lot: NA
Address: ARMINA PLACE LOT 50 BLOCK 3
City: FT. PIERCE State: FL Zip: 34951
Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ERI Method
PRESCRIPTIVE METHOD-The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air
changes per hour at a pressure of 0.2 inch w.g. (50 Pascals) in Climate Zones 1 and 2.
PERFORMANCE or ERI METHOD-The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding
the selected ACH(50) value, as shown on Form R405-2017 (Performance) or R406-2017 (ERI), section labeled as infiltration, sub-section ACH50.
ACH(50) specified on Form R405-2017-Energy Calc (Performance) or R406-2017 (ERI): 7.000
_________ x 60 ÷ ______________ = ____________14059
CFM(50) Building Volume ACH(50)
PASS
When ACH(50) is less than 3, Mechanical Ventilation installation
must be verified by building department.
Method for calculating building volume:_____________________________
Retrieved from architectural plans
Code software calculated
Field measured and calculated
R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals).
Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues.or individuals licensed as set forth in Section
489.105(3)(f), (g), or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and
provided to thecode official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration
control measures.
2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control
measures.
3. Interior doors, if installed at the time of the test, shall be open.
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, if installed at the time of the test, shall be turned off.
6. Supply and return registers, if installed at the time of the test, shall be fully open.
Testing Company
Company Name: ______________________________________ Phone: ________________________
I hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code
Energy Conservation requirements according to the compliance method selected above.
Signature of Tester: ____________________________________ Date of Test: ______________________
Printed Name of Tester: _________________________________
License/Certification #: _____________________________ Issuing Authority: _________________________
8/13/2020 1:57:32 PM EnergyGauge® USA 6.0.04 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1