Loading...
HomeMy WebLinkAboutPremium Plus Skirtingecl0st # • 07`/ 28 / 2014 'M: 22 ";W463 w1404V 008 ' E 1iHA:Il1M'!'1,, 1Solidi Pane 40°` .0 �..:,r , Cent6r Ven Panel .040"` '` i ' . Top Faint THm + � E .059,14 Top Oack T im •.059": Bottom' Trim .047 i E , i ; s t 1 j i Ventilation: Center Vent 8.4 sq. in./fi, of panel Available Colois White I Grey Tan Clay Sand I ventilation:- r Ven# 4.9 sq. in./ft. of panel ` 1L�► Vinyl Skirting N I Avai able Colors � Ioiid Panel �5' While "��". Vlented Panel 3511 Grey Tan = T P Front Trim 50" Clay Top Back Trim ; . 48" Sand , ottom Trim , 40u Trim ikii Co Parisian: Premium Plus Eagle Front Rail •0501, MOTE: Top Hack trim for Back Fait .05W 1 I .048" Premium P and Eagle Bolto)H Charm � .i)47 a ,pop Trim Kits,ar the same Top Front Trim 1iNidth 4.725" 3 I I 4.360" dimension Upper Leg I .590" , 550° I The re Esdn man installers use Premium Plus Trim Kits with Eagle Panel is because ii HEAVIER; and, in areas where blow-out is a-problerin, Premium FINIS offers more rigid protection against blow-oui, i 1Od3a 3WOH 31IHOW 0$L9L9bE98 9b:L8 bZOZ/bZ/L@ $TEE A: ATTACH BACK RAIL 1. Determine a place for mounting. Place bottom edge of back rail just below bottom edge of the home, This location must offer solid support for attaching and wind load pressure for panels and rails. 2. Keep the bask rail straight and level Snap a chalk line around the home to guide the top edge of the back rai4 3. Correct screwing or nailing method for back rail: Start on the back side of the home, FosidoxA screws or nails in the center of the slot. Screw/hail to allow for a clearance of 1116' 1xom the back rail surface. Note. avoid tightly screwing or nailing back rail. A 1116" clearance allows for normal expansion and contraction with temperature change, Place a screw or nail in every other slot. 4. 'Provide a 112" gap between each back rail section for normal thermal expansion. To install around comer, refer to Step E. PASO Ai IN5TALF. EL RIEL DE APOYQ 1, Determine un lugar Para el monteje. Coloque el borde inferior del riel de apoyo junto abajo del boide inferior de Is csss. Esta ubicacidn debe ofrecer on apoyo fame que permita clavar fps rieles y soportar la presi6A por cargas de. viento en los pantiles. 2. Msawnga dewcho el riel do soporte y a nivei. Marque una lines con el cordel cntizado alrededor de la Casa para guiar el borde superior del del de apoyo. 3. M6todo correcto pars daunt d rill de apoyo: Comience en la parte posterior de la Casa. Coloque los clavos en el ceneo de Is, ranAum pars, davos. Introduzcalos clavosy deje una holgura.de 111.6" desde la superfide del del de apoyo. Nota: No clave muy ajustadamente .of riel de apoyo. Una holgura de 1116" con la cabeza del clavo permitixi el espacio sufx1ente pare absorber la expen$Wn y coritraccWn normales resultantes de los cambios de temperatura. Cologuc los clavos on ranuras alterms. 4. Dqc un espacio de la' entre cads secd6n de rill de apoyo pars terser en cuenta la expansion termica normal. Para instalar el producto alrededor de ]as esquinas, consultc el paso E. affEP Bo MOUNT BVITOM RAIL 1. Ground preparation. Prepare the ground so that it is smooth, free of loose clumps, clods or protruding obstacles. Guard against uneven settling of newly excavated ground by mounting the bottom rail on treated (2" x2") lumber. 2. Mark the ground location directly below the outside, bottom edge of the home. Use x1evel or plumb bob to determine this location at each corner. 3. Snaps chalk line or stretch a nylon string between each corner to guide the bottom rail. 4, Position the bottom rail with the back leg toward the inside of the chalk floe perime= 5. Drive ground spikes every 19 inches. TW9 sets ofholes are provided in the bottom rail. They are located inside the channel, and on the back leg. Ground spikes may be driven in either hole at intervals of 19 inches. 6. Installation on concrete. Use a 3W masonry nail. You may also drill a hole for a 311.6" molly screw and plastic sleeve. (Nail and screw materials are available at most hardware stores.) To install around confer, refer to Step E. PASO Bo MONTAX DOL RIEL INFERIOR 1. Prepara&n del p'rso de tierra. Prepare el pbo de mantra que esti upiforme, sin rotas sueltas, tcrrones ni obsticulos que sobresalgan del piso. Proteja la instalacl6n contra el asentamiento no uniforme errpisos redin excavados, montando el del inferior en unapieza de madera tratada (2" x 2"). 2. Marque la ubicad6n en d piso directamente abajo del horde inferior externo de la casa. Use un nivel o una plowada para deterrnitraz esta ubicad6n eta cads. esquina. 3, Marque una Ifnea con el cordel entiaado o coloque una cuerds de nii6n entre cads esqui na pars Oat el zael de apoyo. 4. Coloqucelrleldeapoyoconlapatademspaldohaciaelinter'tordel peximerro marcado pot la Ifnea de 6za. 5. Zntroduzca Jos claws groesos en d piso a cada 19 pulgadas. En el 020-4 WA/TAW LRT.-J. 2tu*rj r/oT].EisT1H-r.1f1N7 79 ; u t:T riel inferior se pmporclonen dos conjuntos de agujero8• l';`stos se encuentran deotm del canal, en la pate de soporte. Los clavos gtums pars el piso se pueden clavar a traves de cualquiera de los agujeros a una distancia do 19 pulgadas entre si. 6. Snstalacibn en oos de concreto. Use ua clavo de 3/4" para mamposteria..Asi mismo se puede taladrar un *ero pars un tornilto de 3116P tipo Molly con ands, plastica. (Los matcriales de elavos y los tomiilos estan disponibles on la mayoria de las fcrteterias}. Para instalar el producto al ededor de las esquinas, consulte el Paso E. STEP Q PMAL INSTALLATION 1. Beginning 24" away from the lowest.corncr of the home, measure f om the ground up to MU' above the bottom edge of the back rail. (1f the temperature is below 407, with frozen ground, measure to 3" above the back rail edge.} Z ]Measurements on sloping ground should be taken every le'(width of panel). 3. Cut the bottom of each panel to angle with the ground. Each cut panel section should sliga 90° to the bottom edge of the home. Use aviation snips or a power saw (with a fine toothed saw blade turned backwards) for cutting. 4. Punch lock tabs every 4" alorig the top and bottom edge of curt panel sections (or outside portion of each panel face for 13" Varl$est). A. Malco (SL-8) Snap Lock Punch tool is recommended. Consult your shirting supplier for obtaining this tool. Tabs are to be positioned outwa to catch on the hooked edge of the rails. 5. Interlock panels and insext into the bottom rail. Begin with the first panel inserted into the bottom rail. Lock tabs should snap past the hooped edge of the bottom rail. Insert next panel section into the interlock hooks along the vertical edge of the panels. Seat each panel securely into the bottom rail. Repeat interlocking panels, forming abouta. 12-foot section, Resume panel cut and interlock method. To install amund comer, refer to Step E. P'AS: wsW AWN DE LOS PANELES 1. Comm=& it 29 do la esq" inferior mas bale de la Casa, mida desde la superficie del piso hasm 1 VX' adiba del borde inferior del riel de apoyo. (Si la temperature ambience duxante la instaiagt6n es inferior it los 40T y el piso estd congelado, mida hasty 3" arriba del borde del riel de apoyo). 2. Las medicioues en pisos con, desuivel deben hacerse a cads, 16' (ancho del panel). 3. Corte la pane inferior de cada Pend on angulo sego el desnivel del piso. Cada wd6n de panel cortado debt ester a escuadre (9T) con el borde inferior de Is, casa. Use tijerm de hojalatero o una sie,om eUctrka (con una hop de cortc do diente lino eolocada al revs) Para comer los pantiles. 4 More In lengtietas de cierm coda 4" a to Imp del borde superior e inferior de las secciones de pantiles cortados. Se recoinaienda el use de una punzonadom de mano Woo (SL-8) Snap Lock Punch. Coniulte con su proveedor de ccncfas sobxe c6mo obtener esta herramients. Las leng,etas deben colocatse hacia afuera a fin de po&r enganchar el borde do gartcho de 6 riles. ---- __- --- - 70'r-M CT.—IM—TA j. ,Epga the los panics c introddzealos ell el del inferior, Comienoe cots el primer panel introducido en el Kiel inferior. La leq etas de creme deben enganchans hasty mis aU del borde con gaucho del riel de apayo. Intraduzea is siguiente secridn de panel en Ios ganchos de endavatniento a to largo del borde vortical de los paroles. Asiente cads panel firmemence en el rid inferior, R*4 eI crida,ougento de Jos panelcs hasty forma una secdon de apmxltna lmente 12 pies. Maude d come de los paneles y e1 matodo de enclavamuiento. Para instalar d pwducto en las esquinas, consulte el peso E. P D: INMRLOCK. FRONT RAIL WITH BACK RAIL. 1. Start $Dapping one end of the front top rail into the back top rail, creating the interlock. Push the front top rail upward, its entire length until the front top rail is completely inaerlocked with the back rail. 2. Overlap V each top to section. To i fag around corner, refer to Step E. PAEO D: ENCLAVAIIi►IIRM DEL. IRIEL FRONTAL CON EL RIEL DE APOYO 1. Conuence engaachando un extremo del riel frontalsuperior en el M superior de apcyo, pm foraiar d mecanismo de enclavamiento. Empuje el ricl superior de apayo hacia artiba en Coda su lonotud haste clue el riel fiOAW superior este completamente enganchado en el del de apoyo. 2. Traslape 1" cada semik del riel superior. Para lasWm d praducto ea its esgairtas, comulte d Paso E. .,ne. v time Jneee r J AT_ T r r<m�o_ccQ_AmQ_r P E: INSTALLATION CORNER INSTAL► 1. Top back rail — Make a 1" vertical. $bto Noah interlock hook should be complddY u gh 49 on bottom curved 149- 2. Bottom tail — Notch the back portion with snips, as illustrated. Bead around a co = and attach to the ground 3, panels — Gut panel to proper height. Determine point of corner bend; bend over it table edge, forming a usriform angle. 4. Top front fail —1ioteh at both, the top and bottom hooks of the from rail, as illustrated, Bend around the corner and fit into the interlock with the top back rail. Refer to Step D- POUR PILE-NtITCHED `SDP FRONT RAILS ARE INCLUDSD IN TRIM P' PA►O I*DEL PItODUCiO �I+,L'1'AI�A EN L.AS ESQUINAS 1. Rid superior de apor — Hage ur) Corte vertical de V desdr. la. parse superior. Ei gaucho superior de eaclavanuento debe cortarse cmnpletarnente, kiaga una muesca a 45° en Is pats cu vada inferior. 2. I,ki inferior — Corte 11 porrldn posterior con diem de hgalatew segdn se muest m en la Amtrac'uin. Ddbldo alrededor de una esquina 7 clavelo al piso• 3. paneles — Corte e1 panel a Ia altars $P*ada. determine el punto de doblez; doble d panel sobrc el borde de una mesa, Pam forma urr dngulo recto. 4. Piei f -ontsl superior — Corte las garlchos superior a iderinr del rid frontal, N & $a �ustra on la figrrta, Doble la pieza alrededor de la e4na y enginchola en el wdavamienio con d riel superior de apoyo. Consulte d paso D. IN EL CONJIJW0 TRIM PAK SE 11+ICLUYEN 1Cukrho IUELEs SUPERIORES PRONTALES YA COWADOS. awrjg/oTjaBT2v—W0HA EE:60 51J—L0-10