HomeMy WebLinkAbout Footing Letter
C:\Engin
Augu
David
St. Lu
2300
Fort P
RE: C
1
P
P
C
Dear
This
appro
where
comp
not h
Since
M. Ra
FL Li
Cc: F
neering\Projects\2
ust 12, 2020
d Johnson –
ucie County
Virginia Ave
Pierce, FL 3
Casey Resid
13339 NW M
Palm City, F
Pool Constru
Concrete Fo
Mr. Johnso
letter serve
oved pool pl
e adjacent
pliance with
esitate to co
erely,
andall Rodg
c. No. 68212
File 20-138-P
M
18
Ph
2020\20‐138‐P Ca
– Chief Build
Building De
enue
4982
dence
Maplewood R
L 34990
uction Permi
ooting Size R
n,
es notice th
lans can be
to the edge
the FBC 20
ontact me at
ers, P.E.
2
P (w/ att)
M. Randal
801 Hazelwood
: 772/201-1634
sey Digital\Footin
ing Inspecto
epartment
Road
it No. 2006-0
Revision
hat the pro
adjusted to
e of the poo
017, 6th Editi
772/201-16
ll Rodge
Drive • Ft. Pierc
• Email: kxfox@
g Letter\20-138-P
or
0126
posed conc
o a size of 1
ol shell. Th
ion. Should
634.
ers, P.E.
ce, FL 34982
@hotmail.com
Casey Footing Le
crete footing
2” Deep x 6
his footing s
d you have a
etter.docx
g that is sh
6” Wide with
size adjustm
any question
hown on th
h (2) #5 reba
ment is in fu
ns, please d
he
ar
ull
do