Loading...
HomeMy WebLinkAboutDesign Certification for Wind Load ComplianceSt. Lucie County Building and Zoning Department Alk 2300 Virginia Avenue OM SO 0 Fort Pierce, FL 34982 772-462-1553 Design Certification for Wind Load Compliance This Certification is to be completed by the project design architect or engineer. This Certification must be submitted with all applications for building permits involving the construction of new residence (single or multi- family), residential addition, any accessory structure requiring a building permit, and any nonresidential structure. This Certification shall not apply to interior renovations (provided that no structural walls, columns or other similar component is being effected) and certain other minor building permits. For further assistance, please contact the Building Inspection Office at 462-1553 or 462-2M Project Name Office Use Only Street Address Permit lvumber Occu anc Type Construction Type Certification Statement: I certify that, to the best of my knowledge and belief, these plans and specifications have been designed to comply with the applicable structural portion of the Building Codes currently adopted and enforced by St. Lucie County. I also certify that structural elements depicted on these plans provide adequate resistance to the wind loads and forces specified by current code provisions. Design Parameters and Assumptions Used Please check or complete the appropriate boa.) 1. Florida Building Code 2004 Edition V ASCE 7-98 2. Building Design is (check one) Enclosed Partially Enclosed Open Building I 3. Building Height: iL -� 4. Wind Speed Used in Building Design: M? � 3 second gust 5. Wind Exposure Classification (refer to exposure tables in Building Code identified in Line 41): G 6. Average Wind Velocity Pressure on Exterior Faces of Structure 35 PSF 7. Peak Wind Velocity Pressure on Exterior Faces of Structure 35 PSF 8. Importance/Use Factor (obtain from Building Code): 1" ' 0 - V 9. Loads: Floor 35' PSF Roof/dead PSF Roof/live 20 PSF 10. Were Shear Walls Considered for Structure (check one): Yes ✓ No (if No, attach explanation) 11. Is a Continuous Load Path Provided (check one): Yes ✓ No (if No, attach explanation) 12. Are Component and Cladding Detail Provided (check one): Yes No ✓ (if No, attach explanation) Prodw�f �u�bet3 de7�r�s o� 13. Minimum Soil Bearing Pressure: Loom PSF As witnesse by , seal, I hereby certify that the information included with this certification is true and correct, to-M� m bestWmy knowledge and belief. Name: .\-A I Design Firm: 5� L-vee- (a& �.161am�2-1,J6 _ Jac Certification 4: JS,e.il Herej Date: 11 !y otc SLCCDV Form 4 02000 rev. 10/5!05 daig