Loading...
HomeMy WebLinkAboutField Compaction Tests Reportp �� Information ®To Build On Engineering • Consulting • Testing ":'ER 1 9 2007 REPORT OF FIELD COMPACTION TESTS. TESTED FOR PROJECT: MAUSOLEUM #1 HILLCftTORIAL GIBRALTAR MAUSOLEUM CONSTRUCTION CO GARDEN -FORT PIERC 1315 WEST LIBERTY AVE PITTSBURGH, PA 15226 DATE: 2/6/2007 ID NO: 116753701A REPORT NO: 768-70005-1 TEST DATA: TEST NO. MATERIAL USE PROCTOR NUMBER MOISTURE CONTENT WET DENSITY (PCF) DRY DENSITY (PCF) PERCENT COMPACTION SPECIFICATION REQUIREMENT 1 Building Pad 7687000501 11.6% (c) 122.5 109.8 97.1% (A) 95% 2 Building Pad 7687000501 10.9% (c) 122.9 110.8 98.0% (A) 95% 3 Building Pad 7687000501 9.7% (c) 119.9 109.3 96.6% (A) 95% 4 Building Pad 7687000501 8.9% (c) 1 119.9 1 110.1 1 97.3% (A) 95% LOCATION DATA: TEST NO. TEST LOCATION DEPTH LIFT 1 10' South & 8' East of Northwest Corner of Pad 0-12 In. Below Top of Pad 2 27' South & 7' East of Northwest Corner of Pad 0-12 In. Below Top of Pad 3 12' North & 9' West of Southeast Corner of Pad 0-12 In. Below Top of Pad 4 25' North & 6' West of Southeast Corner of Pad 0-12 In. Below Top of Pad PROCTOR DATA: PROCTOR NO. TEST STANDARD SOIL DESCRIPTION MAXIMUM DRY DENSITY(PCF) OPTIMUM MOISTURE 7687000501 I AASHTO -T180 Dark Brown Clayey Fine Sand Trace Shell Fragments,Rock Nodules,Or I 113.1 I 13.5% NOTES: TESTS PERFORMED PER ASTM D2922-96 AND 0301 COMMENTS: A. TEST RESULTS COMPLY WITH COMPACTION SPECIFICATIONS _ For PSI Use B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS Distdbution Numbe C. MOISTURE CONTENT COMPLIES WITH SPECIFICATIONS Index Number. 2959 D. MOISTURE CONTENT DOES NOT COMPLY WITH SPECIFICATIONS REMARKS: Comply with Project Specifications, Cesar Pequeno, Superintendant of Gibraltar Mausoleum Construction Co. was informed. a „ Respectfully Submitted, Report Copy Distributed to: Professional Service1ndustriEs; Inc. GIBRALTAR MAUSOLEUM CONSTRUCTION CO CHUCK YOUNG iz`%19�� '7 1315 WEST LIBERTY AVE GEORGE P. BALLOCK, P.E PITTSBURGH, PA 15226 FL. REGISTRATION NO. 34041 Professional Service Industries, Inc. • 2689 SW Domina Road • Port St. Lucie, FL 34953 • Phone 7721446-7803 • Fax 772/446-7808 - Engineering Certificate of Authorization 3684 - Information rjffAN�®To Build On Engineering • Consulting • Testing FEB 19 2007 REPORT OF PROCTOR COMPACTION TEST Dy; TESTED FOR: PROJECT: MAUSOLEUM #1 HILLCREST MEMORIAL GIBRALTAR MAUSOLEUM CONSTRUCTION CO GARDEN -FORT PIERCE A. 1315 WEST LIBERTY AVE PITTSBURGH, PA 15226 REPORT NO: 768-70005-1 Avix DATE: 2/9/2007 PROCTOR NO: 7687000501 TEST DATA: SOIL DESCRIPTION Dark Brown Clayey Fine Sand Trace Shell Fragments,Rock Nodules,Organics. SAMPLE SOURCE Stockpile METHOD OF TEST AASHTO -T180 TEST RESULTS MAXIMUM DRY DENSITY 113.1 PCF OPTIMUM MOISTURE CONTENT 13.5% COMPACTION TEST POINT DATA MOISTURE CONTENT WET DENSITY DRY DENSITY 9.8% 122.2 111.3 12.0% 126.3 112.8 13.5% 128.4 113.1 14.4% 126.3 110.4 108 4- 2% REMARKS: DRY DENSITY VS MOISTURE 6% 10% 14% 18% MOISTURE CONTENT Report Copy Distributed to: GIBRALTAR MAUSOLEUM CONSTRUCTION CO Chuck Young 1315 West Liberty Ave Pittsburgh, Pa 15226 GRAIN SIZE ANALYSIS (ASTM C136-01 and/or C117.95) SIEVE SIZE PERCENT PASSING For 2SHJse Distribution P!uinmr.. 864 Index. Number. 2959 Respectfully Submitted, - ProOessional,Servkv Inalistries, Inc. GEORGE_P. BALLOCK` P.E FL. REGISTRATION NO. 34041 Professional Service Industries, Inc. • 2689 SW Domina Road • Port St. Lucie, FL 34953 • Phone 772/446-7803 • Fax 7721446-7808 Engineering Certificate of Authorization 3684