June 8, 2020 Geotechnical Engineering, Sinkhole Investigations
HCE Project No. 200027.1 and Foundation Forensics� � � ( _�(,�
Mr. Jason Neumann
Neumann Construction and Roofing, LLC
30427 Commerce Drive
San Antonio, FL 33576 RECEIVED
Re: Arlington Foxx Estate JUN 17 2020
Re-roofing
4605 Matanzas Avenue Permitting Department
St. Lucie County
Fort Pierce, Fl
Dear Mr.Neumann:
It is my understanding that Neumann Construction and Roofing,LLC has performed roofrepairs/replacement
at the Foxx residence located at the above address in Fort Pierce,Florida. As requested,we have reviewed
the project documents prepared by Neumann during the repair and installation of the new roofing system.In
addition,I have reviewed the work scope and discussed the project with Neumann Construction and Roofing
personnel. The work scope included:
• Remove existing composite shingles
• Re-flail roof sheathing to comply with Florida Building Code
• Replace and repair drip edge
• Replace and/or repair valley metal
• Install new ridge cap shingles
• Replace aluminum ridge vent
• Replace flashing and install pipe jack lead
• Install flashing on back of aluminum deck to roof deck
• Install Tamko Heritage Rustic Hickory Asphalt Shingles
The installation of flashing,metal channels,drip edge,and vents was performed in general accordance with
manufacturer recommendations and Florida Building Code.
Based on my review of the work scope and progress reports of the repairs/replacement work,it is my opinion
that the work was-performed in general compliance with Florida Building Code. It is our opinion that the
work performed under this permit has been completed and the related building permit should be closed.
-H-. CKI-CONS L _ING INEERS,INC.
n i,_I.E
Sr. Engineer
,G��/Zf!!TO
Florida Reg:No. 40,L- .
17633 Gunn Highway, #119 E-mail:. Hanecki@hanecki.com
Odessa, Florida 33556 Ph: (813)294-0101
LIMITATIONS
This report addresses the current observed conditions at the referenced residence,specific to the location of
work performed. This report is not intended to evaluate, discuss, or otherwise address construction
deficiencies and/or violations of building code that may or may not exist at the site within the time frame of
this roofing repair/construction. Unless specifically noted within this report, construction deficiencies and
building code violations were beyond the scope of our work. No conclusions regarding the existence of
deficiencies or code violations, not addressed within this report, should assumed and none are implied.
Site and building conditions are subject to change over time due to age,environmental conditions and other
factors. This report describes our observations at the time of the subject work only. The reader should make
no reliance, interpretations or conclusions except for those specifically discussed herein. HCE reserves the
right to review and revise the content of this report if new information is provided or based on the discovery
of external conditions which may not have been subject to the work in this report. This report is provided
for the exclusive use of Neumann Construction LLC. No third parties should utilize or rely on the content
of this report without first giving HCE an opportunity to review relevant data, new information, etc.,
determine the applicability of the comments in this report. Interpretations,conclusions,opinions,etc.,made
by others regarding this report are not permitted without the approval of HCE and our client.