HomeMy WebLinkAboutProject Information Z%1J AVA
KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN(772)337-7755 P.O. BOX 78-1377, SEBASTIAN FL 32978-1377 SEBASTIAN (772)589-0712
PALM BEACH (561)845-7445 www.ksmengineering.net MELBOURNE(321)768-8488
FAX(561)845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE(772)229-9093
C.A.:5693 FAX(772)589-6469
April 1, 2019
Lester & Brenda Holland
9341 Spring Run, Apt. 3104
Bonita Springs, FL 34135
Re: 1836 Wildcat Cove Drive
Fort Pierce, Florida
Permit#: 1912-0212
KSM Project#: 191273-b
Dear Mr. and Mrs. Holland:
As requested, KSM Engineering & Testing has performed a subsurface investigation at
the above referenced site. The data gathered during the investigation, together with our
geotechnical related opinions, are included in this report.
A. Site Description:
At the time of drilling, the waterfront site was flat and cleared.
B. Project Description:
A new single family, one-story residence with a pool is planned for the site. Although
our office was not provided with detailed structural drawings, we anticipate maximum
loads will be less than 2,500 pounds per linear foot along the wall foundation.
We estimate that some site fill will be necessary to meet final grade.
r.1LEC - r)v
REVIEWED FOR
CODE COMPLIANCE
S°T. L CIE COUNTY
R SOCC 1l24�6
"Proudly Owned and Operated since 1990"
E%L-J AVL
KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN (772)337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772)589-0712
PALM BEACH (561)845-7445 www.ksmengineering.net MELBOURNE(321)768-8488
FAX(561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE(772)229-9093
C.A.:5693 FAX(772)589-6469
1836 Wildcat Cove Drive -2- April 1, 2019
Fort Pierce, Florida
C. The scope of our study consisted of the following:
1. Performed Standard Penetration Test Borings in the proposed construction area
to estimate the subsoil relative density.
2. Measured the groundwater level at each boring.
3. Evaluated the existing soil conditions with respect to the proposed construction
and provided recommendations for site preparation and foundation design.
4. Prepared this report to document our findings.
D. Site Investigation:
The site investigation program consisted of performing five (5) Standard penetration test
borings in the proposed construction area. The borings were terminated at depths of 10
to 14 feet below existing grade. The locations of the borings are indicated on the
attached boring Location Plan.
The SPT borings were completed in accordance with procedures described in ASTM D-
1586. A standard 1.5 inch I.D., 2 inch O.D. split-spoon sampler is driven into the soil by
successive blows of a 140 pound hammer freely falling 30 inches. The number of blows
required to drive the sampler 1 foot, after seating 6 in., is designated the Penetration
Resistance, or "N" value. At regular intervals the sampler is extracted from the ground
and opened to allow visual examination and classification of the retained soil sample.
Also, the groundwater table was allowed to stabilize and the depth of the groundwater
elevation recorded from existing grade.
The records of the soils encountered, the penetration resistances and groundwater level
are shown on the attached logs.
"Proudly Owned and Operated since 1990"
A%L_JAV&
KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN(772)337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772)589-0712
PALM BEACH (561)845-7445 www.ksmengineering.net MELBOURNE(321)768-8488
FAX(561)845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE(772)229-9093
C.A.:5693 FAX(772)589-6469
1836 Wildcat Cove Drive -3- April 1, 2019
Fort Pierce, Florida
E. General Soil Profile:
The boring logs indicate the subsurface soils to a depth of approximately 6 feet consist
mostly of firm to medium-dense fine-grained sand and slightly clayed fine-grained sand.
At a depth of approximately 6 feet a layer of loose/very loose sandy clayed silt was
encountered. Below the loose/very loose layer, the soils generally consist of medium-
dense to dense fine-grained sand and slightly silty fine-grained sand.
F. Engineering Evaluation and Conclusions:
Based on the information obtained from this site investigation we offer the following
evaluation:
In order for a shallow foundation to perform satisfactorily, it must be able to support the
structural loads with an acceptable factor of safety against excessive settlements: both
total and differential. Since the top 5 feet consists of compacted granular soils, it is
possible to provide a bearing pressure that will be acceptable from a bearing capacity
standpoint. However, a loose layer between 5 and 6 feet below the ground surface
could cause differential settlement. This layer is approximately 12" in depth.
G. Pressure Grouting:
In our opinion, a single family residence can be supported on a conventional foundation
system provided that the loose/very loose soil layers are.densified through sand cement
grouting under pressure. Therefore, to produce uniform subsurface conditions through
cement grouting under pressure, the injection points of the pressure grouting shall not
exceed 6 feet O.C. below load bearing footings and have at least 1 injection point per
any column pad less than 3' X 3' and 2 injection points per any column pad exceeding
3' X 3'.
The tip of the injection point should penetrate the soft and loose soils found at a depth
of 5 to 6 feet below existing grade. All injection points should create a lift of 1/8 of an
inch.
We recommend a representative from our firm be present to observe, document and
certify that the weak soil layer was properly stabilized.
"Proudly Owned and Operated since 1990"
KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN(772)337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772)589-0712
PALM BEACH (561)845-7445 www.ksmengineering.net MELBOURNE(321)768-8488
FAX(561)845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE(772)229-9093
C.A.:5693 FAX(772)589-6469
1836 Wildcat Cove Drive -4- April 1, 2019
Fort Pierce, Florida
H. Site Preparation:
The proposed building area, plus a minimum margin of five feet beyond the proposed
building limits shall be stripped and grubbed of surface debris, including vegetation,
roots and organic matter and proofrolled. Sufficient passes should be made during
compaction operations to produce a density no less than 95 percent of its modified dry
Proctor value to a depth of two feet.
After the exposed surface has been proofrolled, the building and pavement areas may
be filled to the desired grades. The fill material shall consist of clean granular sand
containing less than 10% material passing the U.S. Standard No. 200 mesh sieve.
Place structural fill in loose layers of 12 inches in thickness and compact each lift to at
least 95 percent of its modified dry Proctor value.
After excavating for the footings, the disturbed footing subgrade should be compacted
to 95 percent (minimum) of its modified dry Proctor value. This can be best achieved by
making several passes with a relatively light-weight walk-behind vibratory sled or roller.
We recommend field density tests and on-site inspection be performed at appropriate
times during the earth work operations in order to verify that the site preparations has
been properly constructed.
I. Foundation:
Provided that our recommendations for site preparation are followed, the proposed
structure may be supported on conventional concrete steel reinforced footings designed
for an allowable soil bearing pressure of 2,000 pounds per square foot, or less.
In order to avoid any major cracks in the concrete slab due to settlement, we
recommend that the floor slab also be reinforced with welded wire mesh. The welded
wire mesh shall be supported on concrete bricks at a maximum spacing of 3 feet on
center.
With the foundation properly designed and the site properly prepared, we anticipate
total settlements less than 3/ of an inch and differential settlement of less than %4 of an
inch. The majority of the settlement should occur during construction.
"Proudly Owned and Operated since 1990"
A%IJAVA
KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN (772)337-7755 P.O. BOX 78-1377 SEBASTIAN FL 32978-1377 SEBASTIAN (772)589-0712
PALM BEACH (561)845-7445 www.ksmengineering.net MELBOURNE(321)768-8488
FAX(561)845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE(772)229-9093
C.A.:5693 FAX(772)589-6469
1836 Wildcat Cove Drive -5- April 1, 2019
Fort Pierce, Florida
J. Floor Slabs:
A conventional slab-on-grade can be used in the "at grade" portion of the residence.
We recommend the disturbed subgrade below the floor slab be re-compacted to 95
percent of the modified Proctor maximum dry density (ASTM D 1557) prior to placement
of the concrete. An estimated modulus of subgrade reaction of 150 pounds per cubic
inch (pci) can be used for design of the slab-on-grade. We recommend that control
joints be incorporated in the slab at frequent intervals to control shrinkage cracks.
A moisture barrier is recommended beneath the floor slab to prevent moisture migration
from the underlying soil resulting in dampness of the slab.
K. Swimming Pool (If Planned):
Based on the existing soil conditions, the proposed pool can be designed and
constructed using an allowable soil bearing pressure of 2,000 pounds per square foot
provided that the soft layer found at a depth between 5 and 6 feet below grade is
removed.
We recommend to over excavate the pool and backfill with 3/" stone so that the
subsurface becomes firm to a minimum of 3 feet below the pool bottom. The rock
should be compacted using a "jumping jack". The excavated pool bottom shall be
inspected by a representative of KSM Engineering to verify that the pool bottom is firm
and stable prior to placing the rebars for the pool shell.
Backfill material behind the pool shell shall consist of clean granular sand with less than
10 percent "fines" passing the U.S. No. 200 sieve. Place backfill material in loose lifts of
12 inches in thickness and compact each lift to no less than 95 percent of its modified
dry Proctor value (ASTM D 1557).
Temporary "dewatering" will be required during construction of the pool shell.
"Proudly Owned and Operated since 1990"
JN L_J AVL
KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN(772)337-7755 P.O. BOX 78-1377 SEBASTIAN FL 32978-1377 SEBASTIAN (772)589-0712
PALM BEACH (561)845-7445 www.ksmengineering.net MELBOURNE(321)768-8488
FAX(561)845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE(772)229-9093
C.A.:5693 FAX(772)589-6469
1836 Wildcat Cove Drive -6- April 1, 2019
Fort Pierce, Florida
L. Closure:
This report has been prepared in accordance with generally accepted soil and
foundation engineering practices based on the results of the test borings and the
assumed loading conditions. No warranties, either expressed or implied, are intended
or made. This report does not reflect any variations which may occur between the
borings. If variations appear evident during the course of construction, it would be
necessary to re-evaluate the recommendations of this project.
Environmental conditions, wetland delineation, water quality, and municipal
requirements are not a part of this report.
We are pleased to be of assistance to you on this phase of your project. When we may
be off1AdheF#service to you or should you have any questions, please feel free to
co n;4® u!,
fad, ♦ o» ..p.. •o�A�-/1�+d0�
••% • sue,
��� a UGC U 11 yf���C •� s
C.7
.� _j •- —±-..+-ems...—
• O
--�pG?=��i��•►•.a•••• � tea'
�BBD7DSSSEG90Q
JEK:jt
E-mail to: brendaholland13@gmai1.com; nancy@greggteam.net
"Proudly Owned and Operated since 1990"
KSM Engineering&Testing BORING NUMBER B-1
KSM P.O. Box 78 1377
Sebastian,FL 32978 PAGE 1 OF 1
Tel:(772)-589-0712
Fax:(772)-589-6469
CLIENT Lester&Brenda Holland PROJECT NAME 1836 Wildcat Cove Drive
PROJECT NUMBER 191273-b PROJECT LOCATION Fort Pierce,Florida
DATE STARTED 3/29/19 COMPLETED 3/29/19 GROUND ELEVATION HOLE SIZE inches
DRILLING CONTRACTOR GROUND WATER LEVELS:
DRILLING METHOD Split Spoon Sample Q AT TIME OF DRILLING 5.17 ft
LOGGED BY MS/SF CHECKED BY JEK AT END OF DRILLING --
NOTES See Attached Location Plan AFTER DRILLING --
w o A SPT N VALUE A
U � _ CO W w 20 40 60 80
~^ n=.O m wo 3:_ H� Hc& PL MC LL
IL O MATERIAL DESCRIPTION >C� O Q u1.4 Z a --�
pv c�J a.z 0- mOZ Ve } 20 40 60 80
w O W ❑FINES CONTENT(%)❑
0 1 O n 20 40 60 80
b;•..:.;: Brown Sand,Slightly Clayed with Traces of Roots
Brown Sand with Traces of Shell Fragments 8-8-10
•:: .:: SS
(18) ..............:.......
:.......:.......
10-10-11
:o:' SS (21) ...... ......:.......:.......:.......
5
.... ..................................
Gray Sandy Clayed Silt SS 9-6-4
::`•' Gray Sand (10) :.......:.......:.......:.......
4-10-12
10 Gray Sand,Slightly Silty SS 17-17-23
(40) ........... ............. .......
.............. ........................
.. 19-21-14
ESS
11-9-9 :......:.......:........
.......
(18)
N
Bottom of borehole at 14.0 feet.
uj
w
w
m
2
m
Y_
U
O
Cn
W
J
LL
Cn
Y_
Y
PJ
C
O
N
n
F
m
co
co
z
z
0
J
a
2
m
2
U
W
H
O
W
(7
KSM Engineering&Testing BORING NUMBER B-2
KSM P.O.Box 78-1377
Sebastian,FL 32978 PAGE 1 OF 1
Tel: (772)-589-0712
Fax:(772)-589-6469
CLIENT Lester&Brenda Holland PROJECT NAME 1836 Wildcat Cove Drive
PROJECT NUMBER 191273-b PROJECT LOCATION Fort Pierce, Florida
DATE STARTED 3/29/19 COMPLETED 3/29/19 GROUND ELEVATION HOLE SIZE inches
DRILLING CONTRACTOR GROUND WATER LEVELS:
DRILLING METHOD Split Spoon Sample �-Z AT TIME OF DRILLING 5.00 ft
LOGGED BY MS/SF CHECKED BY JEK AT END OF DRILLING --
NOTES See Attached Location Plan AFTER DRILLING ---
w o
SPT N VALUE
U W w 20 40 60 80
=C7 w o o ~� o PL MC LL
o-i� 0-0 MATERIAL DESCRIPTION M > O z
ov Lu
a 5 O- mO Q wY N" :0z a �--I
20 40 60 80
C7 <z W U z a of El CONTENT(%)❑
0 20 40 60 80
Brown Sand,Slightly Clayed with Traces of Roots
(12) :.......:.......:...............
o:,:.• Brown Sand with Traces of Shell Fragments
SS 6-6-8
5
.. ....................................
X.
Gray Sandy Clayed Silt 7-3-2
SS
Gray Sand,Slightly Silty (5) :.......:.......:.......:.......
FSSS
5-7-12
(19)17-23-20 .......:.......•.......:.......:.......
10 (43)
Bottom of borehole at 10.0 feet.
a
(7
ai
co
N
ul
W
K
W
Cl)
Y_
U
O
rn
w
J_
_Y
Y
v
M
v
0
N
C
f-•
C7
rri
5
F-
z
Cn
r
0
J
a
2
m
x
W
W
F
O
W
KSM Engineering&Testing BORING NUMBER B-3
KSM P.O. Box 78-1377
Sebastian, FL 32978 PAGE 1 OF 1
Tel:(772)-589-0712
Fax:(772)-589-6469
CLIENT Lester&Brenda Holland PROJECT NAME 1836 Wildcat Cove Drive
PROJECT NUMBER 191273-b PROJECT LOCATION Fort Pierce, Florida
DATE STARTED 3/29/19 COMPLETED 3/29/19 GROUND ELEVATION HOLE SIZE inches
DRILLING CONTRACTOR GROUND WATER LEVELS:
DRILLING METHOD Split Spoon Sample �-ZAT TIME OF DRILLING 4.83 ft
LOGGED BY MS/SF CHECKED BY JEK AT END OF DRILLING ---
NOTES See Attached Location Plan AFTER DRILLING --
w o A SPT N VALUE A
U � _ w w 20 40 60 80
~^ a O 6 Wm wo oz—j �--C, F-� PL MC LL
w MATERIAL DESCRIPTION¢ _3 2 >CJ ¢ w w Z a 1--0
p o-Z OU- m O Z Ve }" 20 40 60 80
< a Of El FINES CONTENT(%)❑
0 20 40 60 80
tr: Brown Sand,Slightly Clayed with Traces of Roots
: .: 5-7-8
o:•:'.• Brown Sand with Traces of Shell Fragments SS
6-6-9
:o. SS (15) .... .:.......:.......:.......:.......
5
:.:...
Gray Sandy Clayed Silt SS 8-3-2
:`':'•' Gray Sand (5) :.......:.......:.......:.......
......................
SS 3-5-7
(12) :.......:.......:.......
10 SS 7-9-11
(20) ........ ......:.......:.......:.......
Gray Sand,Slightly Silty
SS 17-14-20
0
°° SS 15-16-12 .......:.... ...:.......:....... .......
(28)
N
Bottom of borehole at 14.0 feet.
w
W
w
CD
m
Y_
0
U
O
❑
m '
w
J
LL
2
N
Y_
Y
V
co
V
0
N
C
n
F
❑
m
g
z
0
J
a
x
m
x
U
w
H
O
w
KSM Engineering&Testing BORING NUMBER B-4
KSM P.O.Box 78-1377
Sebastian, FL 32978 PAGE 1 OF 1
Tel:(772)-589-0712
Fax:(772)-589-6469
CLIENT Lester&Brenda Holland PROJECT NAME 1836 Wildcat Cove Drive
PROJECT NUMBER 191273-b PROJECT LOCATION Fort Pierce,Florida
DATE STARTED 3/29/19 COMPLETED 3/29/19 GROUND ELEVATION HOLE SIZE inches
DRILLING CONTRACTOR GROUND WATER LEVELS:
DRILLING METHOD Split Spoon Sample �-Z AT TIME OF DRILLING 4.92 ft
LOGGED BY MS/SF CHECKED BY JEK AT END OF DRILLING --
NOTES See Attached Location Plan AFTER DRILLING ---
a o tt A SPT N VALUE A
w
S 20 40 60 80
=0 Hw ofo ?:�-=) c �- PL � LL
a 0 MATERIAL DESCRIPTION � j O 0 D Q W 4 z
p of o M 0- m O> V" } 20 40 60 80
O9 <z W U? 0 Of ElFINES CONTENT(%)El
0 20 40 60 80
Brown Sand,Slightly Clayed with Traces of Roots
5-7-8
SS
:o:•.'• Brown Sand with Traces of Shell Fragments (15)
6-8-7
5 (15)
.. ....................................
Gray Sandy Clayed Silt 4-3-2
SS
(5)
Gray Sand
SS
3-5-8
(13) :.......:.......:.......:.......
10 Gray Sand,Slightly Silty SS 11(31)
1
Bottom of borehole at 10.0 feet.
a
rri
r�
r
N
Lu
W
Lu
W
U
N
Y_
U
U
O
m
Lu
w
J
U.
a
co
Y_
Y
v
M
v
0
N_
C
n
F-
m
g
Cn
D
0
P
m
Z
z
co
0
J
a
x
m
x
U
W
0
O
w
KSM Engineering&Testing 8-1377 BORING NUMBER B-5
KSM Sebastian,7 FL 32978 PAGE 1 OF 1
Tel:(772)-589-0712
Fax:(772)-589-6469
CLIENT Lester&Brenda Holland PROJECT NAME 1836 Wildcat Cove Drive
PROJECT NUMBER 191273-b PROJECT LOCATION Fort Pierce, Florida
DATE STARTED 3/29/19 COMPLETED 3/29/19 GROUND ELEVATION HOLE SIZE inches
DRILLING CONTRACTOR GROUND WATER LEVELS:
DRILLING METHOD Split Spoon Sample �Z AT TIME OF DRILLING 5.00 ft
LOGGED BY MS/SF CHECKED BY JEK AT END OF DRILLING --
NOTES See Attached Location Plan AFTER DRILLING --
W o A SPT N VALUE A
w 20 40 60 80
a (L6 Wm wo 0z� �� �� PL MC LL
MATERIAL DESCRIPTION —j 2 >C7 O Z)Q w w z a 0 �
p a5 O- mO> Y" 20 40 60 80
C7 <z W U z a Q ❑FINES CONTENT(%)❑
0 1 20 40 60 80
i
Brown Sand,Slightly Clayed with Traces of Roots
4-6-8
(14) :.......:.......:.......:.......
v' Brown Sand with Traces of Shell Fragments VSS
SS 5-7-9
a: (16) .... .:.......:.......:.......:.......
5
:.;..,:
Gray Sandy Clayed Silt SS 5-2-2
:`•::: Gray Sand (4) . .....................................
3-8-10
:.: 10-17-15 .......:... ...:.......:.......:.......
10 SS (32)
Bottom of borehole at 10.0 feet.
a
q
ai
M
N
O
W
W
W
W
Y_
U
O
O
rn
to
W
J
LL
Y
Y
V
co
C
O
N_
C
n
H
m
g
co
D
P
m
z
0
0
J
a
x
m
x
W
W
H
W
t
t
Ai
vJV, '�Ix�•` 'ice r,,.+ ,�.
j s
2
a
,{�ram� ��•'
+ rJ
Y
fl�s\flN� ��194�2
me
d�QC�
atiCa
1a �
flF
i U