Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Inspection Docs
planning&Development Services Building&Code Regulation Division 2300 Virginia Aire • Fort pierce,FL 34982 . 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT # 2 00 1-- © 190 JOB ADDRESS: 6801 Penny Ln, Fart Pierce, FL 34951 PEST CON, TROL CONTRACTOR: i7mwspestcontrw PEST CONTROL LICENSE #:jB1 We,the UDdprsigned, hereby certify that we Have pretreated the above described construction for subterranean termites in accordance with the Standards of the Nabonal Pest Con.trot Assmjaftn- Square feet it area treated: 1750 Cbernicals used: CmwGheok Percentage of solution: 10_'D6% Total gallons used: 175 Date of Treatment: 198m4rm Trine of Treatment: awsam Footing Slab 1 `Treatment 1s'Treatment 13e Sreat He-Treat 13rive�vay Pools 1st Treatment 1st Treatment -fie-Treat He-Treat Other Perimeter for Final I n,spection 1�Treatment fie-Treat Signature of Exterminator Note: There must be a completed form for each required treatment orre-treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection wAl fail and a re inspection fee charged_ FBC104.2.6 Certificate of Protective Treatment forprevenffan of termites A weather resistant jobsite posting board sball be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and anotber copy for the building permit files The Treatment C"ficcafe sbAl provide the product used ide iW of the applicator, time and date of the treatment,site location, area treated, chemical used,percent concentration and number ofgal/ons used, to establish a verifiable record of protective treatment_ If the s iI chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lurie County requires for the final inspection for CO,a permanent Sucker to be placed on the electrical panel box.cover,Fisting all the treatments and dates of applications,