Request for 30-Day Temporary Power Release
Date: /I- zeZo Permit Number: J 710
Project Address: ve, F
THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE
ABOVE DESCRIBED PROPERTY,FOR A PERIOD NOT TO EXCEED THIRTY(30)DAYS,FOR
THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION FOR FINAL
INSPECTION, IN CONSIDERATION OF APPROVAL OF THE REQUEST WE HEREBY
ACKNOWLEDGE AND AGREE AS FOLLOWS:
1. This temporary power release is requested for the above stated purpose only,and there will be no oecapancy
of any type,other than that permitted by construction daring this time period.
2. As witness by our signatures,we hereby agree to abide by aTterms and conditions of this agreement,including
Building Division Polky,which is incorporated herein by reference.
3. Ali conditions and requirements listed in the attacked docu rent entitled"Requirements for 30 Day Power for
4. Testing"have been f rMled and the premise is ready for compliance inspection.
S. All requests for an extension beyond 30 days must be made in writing to the Building Official stating the reason
for the request. Power may be removed from the site and/or a Stop Work Order Issued Ifthe Final Inspection
has not been approved within 30 days. A fee of$100.00 will be required to lift the Stop Work Order.
WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS,ST.LUCIE COUNTY,AND
THEIR EMPLOYEES FROM ALL LIABILITIES.AND CLAMS OF ANY TYPE OF NATURE
WHICH MAY ARISE NOW OR IN THE FUTURE OUT OF THIS TRANSACTION,INCLUDING
ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE DISCONNECTION OF
ELECTRICAL POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT.
�.��
OWNER SIGNATURE DATE
7-ey7-0
GENE CONTRACTOR SIGNATURE DATE
ELECTRICAL CONTRACT a l t — a ]2 D
SIGNATURE DATE